UNITED STATES DEPARTMENT OF COMMERCE SNational Institute of Standards and Technology
"?,Are$
Of Gaithersburg, Maryland 20899-VOICE (301) 975-6210 FAX (301) 869-4770 March 18, 2009 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Docket #50-184 Gentlemen:-
Transmitted herewith is Operations Report No. 61 for the NBSR. The report covers the period January 1, 2008 to December 31, 2008.
Sincerely, Robert Dimeo, Acting Director NIST Center for Neutron Research Enclosure cc:
U.S. Nuclear Regulatory Commission ATTN: Patrick Isaac One White Flint North 11555 Rockville Pike, M/S 12-G13 Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: William Kennedy One White Flint North 11555 Rockville Pike, M/S 12-G13 Rockville, MD 20852-2738
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY REACTOR (NBSR)
Docket #50-184 Facility License No. TR-5 Operations Report
-- #61 --
January 1, 2008 - December 31, 2008 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8(3) of the NBSR Technical Specifications and covers the period from January 1, 2008 to December 31, 2008.
Section numbers in the report (such as 7.8(3)(a)) correspond to those used in the Technical Specifications.
March 18, 2009 Robert Dimeo, Acting Director NIST Center for Neutron Research
TABLE OF CONTENTS 7.8(3)(a)
Summary of Plant Operations 7.8(3)(b)
Unscheduled Shutdowns 7.8(3)(c)
Tabulation of Major Items of Plant Maintenance 7.8(3)(d)
Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval by the NRC Pursuant to 10 CFR 50.59 7.8(3)(e)
Summary of Radioactive Material Released and Results of Environmental Surveys Performed 7.8(3)(f)
Summary of Significant Exposures Received by Facility Personnel and Visitors 2008 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 1
7.8(3)(a) Summary of Plant Operations During the period January 1, 2008 through December 31, 2008 the reactor was critical for 5951 hours0.0689 days <br />1.653 hours <br />0.00984 weeks <br />0.00226 months <br /> with an energy output of 118,765 MWH. Major activities during this period included: replacement of confinement building switchboards; replacement of four shim arms; and the licensing of two senior reactor operators.
7.8(3)(b) Unscheduled Shutdowns
- 1. There were 3 scrams due to commercial power interruptions. After each occurrence, a return to 20 MW was made within an hour of the scram.
- 2. There was one shutdown due to loss of a motor control center (MCC) supply breaker. After investigating and correcting the problem, the reactor was returned to 20 MW less than 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> after the shutdown.
- 3. There was one shutdown due to a failed scram relayassociated with an emergency fan. After investigating and correcting the problem, the reactor was returned to 20 MW less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the shutdown.
- 4. There was one shutdown due to loss of required potable water. This occurred within four hours of a scheduled shutdown and the reactor was not restarted after potable water was restored.
7.8(3)(c) Tabulation of Major Items of Plant Maintenance Note: Some of these items may be also listed as Engineering Change Notices (ECN).
- 1. Replaced MCCDC, MCCA-5, MCCB-6, MCCA-3, and MCCB-4.
- 2. Replaced all shim arms.
- 3. Cut 12 spent fuel elements for eventual shipment.
- 4. Performed waste shipment of non-fueled fuel element pieces.
- 5. Replaced leak detector panel.
- 6. Rebuild of #1 main D20 pump.
2008 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 2
- 7. Instrument calibration surveillance tests were performed for the following:
Three Wide-range Nuclear Power Channels Reactor Vessel Flow and Level Recorders and Indicators Two Reactor Differential Temperature Channels Confinement Building Area Radiation Monitors Fission Product Monitor and Secondary Cooling N1 Monitors Three Confinement Building Effluent Monitors Emergency Ventilation System Controllers
- 8. Thirty-seven instrument service requests (ISR) were completed, including:
ISR#
ACTION 1668 Replaced bad component in NC-3 Intermediate Range Nuclear Channel.
1671 Replaced bad valve positioner for DWV-39.
1674 Replaced relay FSR-2 in the ventilation control system.
1678 Replaced detector tube in RM 3-2 Fission Products radiation monitor.
7.8(3)(d) Tabulation of Major Changes in the Facility and Procedures, and Tests and Experiments, Carried Out Without Prior Approval by the NRC pursuant to 10 CFR 50.59.
The following facility changes were completed this year. None required a license amendment or a change to the technical specifications, and there were no changes made pursuant to the applicable criteria of 10 CFR 50.59.
ECN 524 Removal of Lead between Terminals ITB5-14 and ITB6-49 in the Reactor Safety System 7.8(3)(e) Summary of Radioactive Material Released and Results of Environmental Surveys Performed.
Gaseous releases consisted of 915 curies of tritium, 1371 curies of Argon-41, and 0.195 curies of other beta-gamma emitters. There were 3.96 curies of tritium and 1.4 millicuries of other beta-gamma emitters released into the sanitary sewer.
Environmental samples of the streams, vegetation, and/or soil, and air showed no significant changes.
2008 Operations Report for NBSR (TR-5)
[Docket #50-184]
Page 3
7.8(3)(f) Summary of Significant Exposures Received by Facility Personnel and Visitors.
- 1. None to visitors.
- 2. Dosimetry results for this reporting period indicated that no facility personnel received any significant exposures.
2008 Operations Report for NBSR (TR-5)