ML090850092
| ML090850092 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/25/2009 |
| From: | Ryan Lantz Operations Branch IV |
| To: | Reinhart J Omaha Public Power District |
| References | |
| IR-09-301 | |
| Download: ML090850092 (4) | |
See also: IR 05000285/2009301
Text
March 25, 2009
Jeff Reinhart
Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4
P. O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING
EXAMINATION APPROVAL 05000285/2009301
Dear Mr. Reinhart:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at Fort Calhoun Station.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Randy Cade,
Manager, Operations Training and Simulator. Note that any examination waivers and
application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on March 27, 2009. The NRC staff
will administer the operating tests during the week of March 30, 2009. This examination has
undergone extensive review by my staff and representatives responsible for licensed operator
training at your facility. Based on this review, I have concluded that the examination meets the
guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 860-8159.
Please contact your Chief Examiner, Brian Larson, at (817) 860-8172, if you have any questions
or identify any errors or changes in the license level (RO or SRO) or type of examination (partial
or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/ Bernard Stapleton for
Ryan E. Lantz, Chief
Operations Branch
Division of Reactor Safety
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Omaha Public Power District
- 2 -
Docket: 50-285
License: DPR-40
Enclosure: ES-201-4
cc w/enclosure:
Randy Cade, Manager
Training and Simulator
Omaha Public Power District
9610 Power Lane
Mail Stop FC-3-1
Blair, NE 68008
cc w/o enclosure
Mr. Jeffrey A. Reinhart
Site Vice President
Omaha Public Power District
Fort Calhoun Station FC 2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
Mr. Thomas C. Matthews
Manager - Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
Winston & Strawn
Attn: David A. Repke, Esq.
1700 K Street, NW
Washington, DC 20006-3817
Chairman
Washington County Board of Supervisors
P.O. Box 466Blair, NE 68008
Ms. Julia Schmitt, Manager
Radiation Control Program
Nebraska Health & Human Services R & L
Public Health Assurance
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007
Omaha Public Power District
- 3 -
Ms. Melanie Rasmussen
Radiation Control Program Officer
Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
Omaha Public Power District
- 4 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (John.Hanna@nrc.gov)
Resident Inspector (John.Kirkland@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
FCS Site Secretary (Berni.Madison@nrc.gov)
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
SUNSI Rev Compl.
9 Yes No
9 Yes No
Reviewer Initials
Lah
Publicly Avail
9 Yes No
Sensitive
Yes 9 No
Sens. Type Initials
lah
LA:OB
SOE:OB
AC:OB
/RA/
/RA/
/RA/
LAHurley
BTLarson
BStapleton
03/12/09
03/14/09
03/25/09
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax