License Renewal Inspection Exit Meeting, 1/13/09 Slides
ML090420440
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/13/2009
From: Darrell Roberts
Division of Reactor Safety I
To:
Meyer G W, RI/DRS/EB1, 610-337-5211
Shared Package
ML090420392 List:
References
Download: ML090420440 (21)


Text

Susquehanna License Renewal Inspection Exit Meeting 1

Exit Meeting January 13, 2009

Welcome & Opening Remarks Darrell Roberts 2

Director, Division of Reactor Safety (DRS)

Introductions

NRC Representatives

  • D. Roberts, Director, DRS, Region I
  • G. Meyer, Inspection Team Leader, DRS, Reg I 3

PPL Representatives

  • W. Spence, Executive Vice President
  • N. Gannon, VP, Nuclear Operations
  • R. Pagodin, General Manager, Engineering
  • J. Krais, Manager, Special Projects

Meeting Purpose

  • Present Inspection Results to PPL
  • Provide PPL an Opportunity to Respond Agenda 4

Agenda Overview - License Renewal Process Exit Meeting with PPL Public Questions to NRC

License Renewal Process

  • Application & Review Process 5

pp

  • Safety Review Track

License Renewal Process Safety Safety Review Review Independent Independent Review Review 6

Environmental Environmental Review Review NRC Decision NRC Decision On Application On Application License Renewal License Renewal Application Application submitted to NRC submitted to NRC Review Review (ACRS)

(ACRS)

Hearings*

Hearings*

Safety Review Track Application Sept 13, 2006 Inspection August SER With open Items March 2 Final SER Aug 29 Decision Goal Dec 7, 2009 Scoping Audit Dec 11 7

AMP Audit May 5 Public Meeting LR Overview Nov 15 Full ACRS October TODAY Jan 13 ACRS Subcommittee April 1 Sept 2006 Jan 2009 August 2008 August 2009 March 2009 May 2008 Dec 2009 Delay

Verify in-plant aspects of scoping, material condition, aging management program development, and documentation that supports the license renewal application Inspection Focus 8

supports the license renewal application.

  • Performed by Region I
  • Six inspectors for two weeks, in August 2008

Inspection Objectives Inspectors Reviewed

- Potential effects of non-safety structures &

components on safety related equipment

- Aging Management Programs (AMPs) 9

  • Implementation of existing programs
  • Feasibility of implementation for new or modified programs

- Documentation - auditable, retrievable, & supports the application

  • Scoping of Non-Safety Systems
  • 28 of 49 Proposed AMPs (>50%)

Inspection Review Scope 10

  • Operating Experience Review
  • Focused System Review

- High Pressure Coolant Injection System

Inspection Activities

  • Review of non-safety scoping decisions
  • Walkdowns of plant systems & structures 11 p

y

  • Review of procedures and records
  • Review of PPLs operational experience reviews

Inspection Results Results support a conclusion that there is reasonable assurance that aging effects will be adequately managed.

12

  • Scoping of non-safety systems -

acceptable.

  • AMPs - capable of managing aging effects
  • Documentation - auditable & retrievable.

Scoping

  • HPCI system cables in Turbine Building Building

LRA Revisions Existing AMPs

  • Masonry Wall Program
  • Structures Monitoring Program 14
  • Fire Water Program
  • Piping Corrosion Program

LRA Revisions Existing Programs

  • Fuel Oil Chemistry
  • Leak Chase Channel Monitoring Program 15
  • Leak Chase Channel Monitoring Program
  • System Walkdown Program

- October 15 Piping Vault Inspection

LRA Revisions Existing Programs

  • Instrument Air System
  • Closed Cooling Water Chemistry Program
  • HPCI/RCIC Turbine Casing Program

LRA Revisions New Programs

  • Chemistry Program Effectiveness Inspection Program 17
  • Supplemental Pipe/Tank Inspection Prog.
  • Area Based NSAS Inspection Program (Non-Safety Affects Safety)

LRA Revisions New Programs

  • Buried Piping and Tanks Program 18
  • Small Bore Class 1 Piping Inspection Program

Other Observations

  • Aging management program changes and drawing changes, which did not need an application revision 19 application revision.

PPL Response 20 p

Public Questions for the NRC

  • NRC will reply to your items of interest
  • NRC staff members will be available after the meeting 21 meeting
  • Please fill out a meeting feedback form

http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html