ML090400737
| ML090400737 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 04/23/2008 |
| From: | Entergy Nuclear Northeast |
| To: | Engineering Region 1 Branch 1 |
| John Richmond | |
| References | |
| 2-ECA-0.0, Rev 2 | |
| Download: ML090400737 (29) | |
Text
Nuclear Northeast Procedure Use Is:
0 Continuous Reference 0 Information Control Copy:
I Effective Date:
2-ECA-0.0, Revision: 2 Approved By:
PARTIAL REVISION
Number:
2-ECA-0.0 A.
B.
C.
i i t l e :
Revision Number:
LOSS OF ALL AC POWER REV. 2 PURPOSE This procedure provides actions to respond to a loss of all AC power.
SYMPTOMS OR ENTRY CONDITIONS 1 ) The symptom of a loss of all AC power is the indication that all 480V busses are de-energized.
- 2) This procedure is entered from 2-E-0, REACTOR TRIP OR SAFETY INJECTION, Step 3, on the indication that all 480V busses are de-energized.
ADVERSE CONTAINMENT CONDITIONS EOP values for adverse containment should be used if either of the following conditions exist:
o Containment radiation levels greater than 1E5 R/hr.
- OR -
o Containment pressure greater than 4 psig.
I 1 of 28
Number:
l i t l e :
2 -
ECA-0.O LOSS OF ALL AC POWER I.
V e r i f v Reactor T r i D :
Manually trip reactor.
o Reactor trip breakers - OPEN o Neutron flux - DECREASING o Rod bottom lights - LIT Revision Number:
REV. 2 o Rod position indicators - AT ZERO
- 2.
V e r i f v Turbine Trio:
- a. All turbine stop valves -
- a. Manually trip turbine.
LE CLOSED turbine will !4OJ
- trip, close MSIVs.
IF MSIVs can NOi be closed, THEN manually run back turbine.
2 of 28
Number:
T i L l e :
l l e v i s i o n Number:
2-ECA-O.O LOSS OF ALL AC POWER REV. 2
~
ACTION/EXPECTED RESPONSE
- 3.
Check If RCS Is Isolated:
- a. PRZR PORVs - CLOSED
- a. E PRZR pressure less than 2335 psiy, THEN manually close PORVs.
- b. Letdown isolation valves -
- b. Manually close valve.
CLOSED 0 LCV-459 o 200A o 2008 0 2OOC
- c. Excess letdown isolation valve
- c. Manually close valve.
- CLOSED o 213
- 4.
Verify AFW Flow - GREATER THAN 400 GPM:
- a. Turbine-driven AFW pump RUNNING
- c. Adjust steam supply speed control valve as necessary:
o HCV-1118
- a. Manually open steam supply reyulator valve:
0 PCV-1139 3 of 28
Number:
2 - ECA-O. O f
f l
~
l f
)
t t
t t
CAUTION The l o a d on t h e d i e s e l g e n e r a t o r s should remain l e s s t h a n 1650 KW b u t may be i n c r e a s e d t o 2000 KW f o r a maximum of 2 h r s i n any 24 h r p e r i o d.
~
f f
f
~
f t
t
~
~
~
~
~
~
~
Title:
Revision Number:
LOSS OF ALL AC POWER REV. 2
- 5.
T r y To Restore Power t o Anv 480V
&.L a. Energize 48UV bus w i t h d i e s e l g e n e r a t o r :
- 1) Check d i e s e l g e n e r a t o r ( s ) -
1 ) Emergency s t a r t d i e s e l RUNNING g e n e r a t o r ( s 1 :
a ) Manually a c t u a t e SI
- 2) V e r i f y 480V bus -
2 )
Manually e n e r g i z e 480V bus AUTOMATICALLY ENERGIZED f r o m r u n n i n g d i e s e l g e n e r a t o r.
This Step continied on the next page.
4 o f 28
2-ECA-0.U STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED IF 48UV bus can NOT be energized from diesel generator(s1, iHEN perform the following:
a ) Locally trip running diesel generator(s).
b f Contact Con Ed UU to determine if 138KV or 13.8KV power readily available.
c ) E outside power is NOT readily available, THEN perform the following:
- 1. Start Appendix R DG per:
0 2-SOP-27.6, UNIT 2 APPENDIX R UIESEL GENERATOR OPERATION
- 2. Dispatch NPU to black start a GT per:
0 2-SOP-27.5.3, BLACK START OF GAS TURBINE 1, 2,
- 3.
- 3. Go to Step 6. OBSERVE CAUTIONS PRIOR TU STEP 6.
d ) E outside power is readily available, THEN attempt to manually energize 48UV bus using the following:
0 2-AUP-138KV-I, LOSS OF POWER TO 6.9KV BUS 5 AND/OR 6.
0 2-AOP-48UV-1, LOSS OF 48UV BUS.
T h i s Step continued on the next page.
5 of 28 LOSS UF ALL AC POWER REV. 2
~
Number:
2 -
ECA-0.0
- b. Check 480V busses - AT LEAST ONE ENERGIZED:
o 2A AND 3A
- OR 0 5P l i t l e :
Revision Number:
LOSS OF ALL AC POWER REV. 2 OR o 6A c. S t a r t one s e r v i c e water pump on t h e e s s e n t i a l header t o support r u n n i n g d i e s e l g e n e r a t o r
- d. Return t o procedure and s t e p i n e f f e c t and i m l e m e n t FRPs
- b. Go t o Step 6. OBSERVE CAUTIONS P R I O R TO STEP 6 6 of 28
Number':
T i t l e :
Revision Number:
2 -
ECA-0. O LOSS OF ALL AC POWER REV. 2 STEP I
CAUTION f
o When power i s r e s t o r e d t o any 480V bus, recovery a c t i o n s s h o u l d
+
c o n t i n u e s t a r t i n g w i t h Step 24.
o If an S I s i g n a l e x i s t s or i f an SI s i g n a l i s a c t u a t e d d u r i n g t h i s procedure, it should be r e s e t ( r e f e r t o Step 18b) t o p e r m i t manual l o a d i n g o f equipment on a 480V bus.
' o I f a d i e s e l g e n e r a t o r i s s t a r t e d, a s e r v i c e water pump should be s t a r t e d on t h e e s s e n t i a l header t o p r o v i d e d i e s e l g e n e r a t o r c o o l i n g.
o I f a p a r t i a l t r a i n (bus 2A o r bus 3 A ) i s energized, safeguards equipment on t h e energized bus i n c l u d i n g RCP seal c o o l i n g s h o u l d be placed i n PULLOUT or i s o l a t e d.
f 1
f f
f f
f f
f l
f t
t t
- 6.
Place F o i l o w i n q Eauioment Switches I n PULLOUT P o s i t i o n :
o Containment spray pumps o S I pumps o FCUs o M o t o r - d r i v e n AFW pumps o T u r n i n g gear o i l pump o Bearing o i l pump o T u r b i n e a u x i l i a r y o i l pump o CCW pumps o RHR pumps 7 o f 28
2 - ECA-0.0 This Step contiiiiied on the next page.
8 o f 28 LOSS OF ALL AC POWER REV. 2
Number' :
r i l l e :
2-ECA-0. O LOSS OF ALL AC POWER 9 of 28 Revision Number:
REV. 2
Nunibe r :
Title:
Rev1 siori Number:
2-ECA-0.0 LOSS OF ALL AC POWER R E V. 2
- 8.
DisDatch Personnel To L o c a l l v Close Valves To I s o l a t e RCP Seals And Place Valve Switches I n CLOSED P o s i t i o n :
o RCP seal r e t u r n i s o l a t i o n v a l v e o u t s i d e containment:
0 MOV-222 o RCP seal i n j e c t i o n i s o l a t i o n valves o u t s i d e containment:
0 MOV-250A o MOV-250B 0 MOV-250C o MOV-2500 o RCP thermal b a r r i e r CCW r e t u r n i s o l a t i o n v a l v e o u t s i d e containment:
0 MOV-789 10 o f 28
Number:
.I i t I e :
Kevi s ion Nuinber :
2 -
ECA-O.O LOSS OF ALL AC POWER REV. 2
- 9.
Check If CST Is Isolated From Hotwell :
- a. Verify condenser hotwell isolation valves - CLOSED:
o LCV-1128 0 LCV-1128A 0 LCV-1129 o CD-6 o CT-8
- b. Place condenser hotwell isolation valve controllers in MANUAL:
o LCV-1128 o LCV-1128A 0 LCV-1129
- 10.
Check SG Status:
- a. MSIVs - CLOSED
- b. Main FW regulating and bypass valves - CLOSED
- c. Blowdown isolation valves CLOSED
- a.
valve(s1 open or position not known, THEN dispatch personnel to locally close valve(s).
valve(s1 can NOT be closed, iHEN locally close associated isolation valve(s1:
o CT-7 for LCV-1128 and o CD-5 f o r LCV-1129.
LCV-1128A.
Manually close valves. E valves can be manually closed, locally close valves.
Locally close MSIVs as necessary per 2-SOP-ESP-001, LOCAL EQUIPMENT OPERATION AND COMPENSATORY ACTIONS.
1 1 of 28
Number:
Title:
2-ECA-O.D LOSS OF ALL AC POWER 1 1.
Check If Aiiv SG Is Faulted:
- a. Check pressures in all SGs -
o ANY SG PRESSURE DECREASING IN AN UNCONTROLLED MANNER
- OR -
o ANY SG COMPLETELY DEPRESSURIZED
- b. Isolate faulted S G ( s ) :
o Isolate AFW flow o Dispatch NPO to close steam supply header valves to turbine-driven AFW pump from faulted S G ( s ) :
o MS-41 (SG 22) o MS-42 (SG 23) o Verify SG atmospheric steam dumDs - CLOSED Revision Number:
REV. 2
- a. Go to SteD 12
- b. Manually close valves. 1_E valves can NOT be closed, THEN dispatch NPO to attempt to locally close valves or associated block valves.
12 of 28
Number:
2 - ECA-0.0
- 12.
Check I f SG Tubes Are I n t a c t :
o Main s t e a m l i n e r a d i a t i o n r e c o r d e r (R-28, R-29, R-30 and R-31) - NORMAL o Condenser a i r e j e c t o r r a d i a t i o n r e c o r d e r ( R - 4 5 ) - NORMAL o SG blowdown r a d i a t i o n r e c o r d e r (R-49) - NORMAL o NO SG LEVEL INCREASING I N AN UNCONTROLLED MANNER T i t l e :
Revision Number:
LOSS OF ALL AC POWER R E V. 2 T r y t o i d e n t i f y r u p t u r e d S G ( s ).
Continue w i t h Step 13.
OBSERVE CAUTION P R I O R TO STEP 13. WHEN r u p t u r e d S G ( s ) i d e n t i f i e d, THEN i s o l a t e r u p t u r e d S G ( s ) :
o I s o l a t e AFW f l o w o Dispatch NPO t o c l o s e steam supply header valves t o t u r b i n e - d r i v e n AFW pump f r o m r u p t u r e d S G ( s ) :
0 MS-41 (SG 22) 0 MS-42 (SG 23) o A d j u s t r u p t u r e d S G ( s )
atmospheric steam dump c o n t r o l l e r s e t p o i n t t o 74%,
1030 p s i g.
WHEN r u p t u r e d SG p r e s s u r e l e s s t h a n 1030 p s i g. THEN v e r i f y r u p t u r e d SG atmospheric steam dump closed. 1+
NOT c l o s e d,
THEN p l a c e c o n t r o l l e r i n manual and c l o s e v a l v e. I F v a l v e can NOT be c l o s e d,
l o c a l l y i s o l a t e oDen v a l v e.
13 o f 28
Number:
2 - E C A - O r 0 14 o f 28 l i t l e :
Revision Number:
LOSS O F A L L AC POWER REV. 2
N~inbii r :
'I i ti e:
2-ECA-O. 0 LOSS OF ALL AC POWER 15 of 28 R e v i s i o n Number:
REV. 2
Number:
2-ECA-0.0 o SG pressures should NOT be decreased to less than 110 psig to prevent injection of accumulator nitrogen into the RCS.
o SG narrow range level should be maintained greater than 10% ( 2 7 % FOR ADVERSE CONTAINMENT) in at least one intact SG.
If level can NOT be maintained, SG depressurization should be stopped until level is restored in at least one SG.
I
~
f f
f f
f t
~
f f
f f
t
)
t l
l t
l l
f t
l
Title:
Revision Number:
LOSS OF ALL AC POWER REV. 2 I
I f
f I
NOTE o The SGs should be depressurized at a rate sufficient to maintain a cooldown rate in the RCS cold legs less than 100°F per hour. This will minimize RCS inventory loss while cooling the RCP seals in a controlled manner.
o PRZR level may be lost and reactor vessel upper head voiding may occur due to depressurization of SGs.
Depressurization should NOT be stopped to Drevent these occurrences.
- 16.
Deoressurire Intact SGs To 210 D S i q :
- a. Check SG narrow range levels -
- a. Perform the following:
GREATER THAN 10% (27% FOR ADVERSE CONTAINMENT) in at
- 1) Maintain maximum AFW flow least one SG until narrow range level greater than 10% (27% FOR ADVERSE CONTAINMENT) in at least one SG.
- 2) Continue with Step 1 7.
WHEN narrow range level greater than 10% (27% FOR ADVERSE CONTAINMENT) in at least one SG, THEN do Steps 16b through 16e.
This Step coniinued on t h e next page.
1 6 of 28
Number :
l i t l e :
2 -ECA-O. O LOSS OF ALL AC POWER b. Manually dump steam u s i n g SG atmospheric steam dumps t o m a i n t a i n cooldown r a t e i n RCS c o l d l e g s - LESS THAN 100"FiHR Revision Number:
R E V. 2 c. Check RCS c o l d l e g temperatures - GREATER THAN 325" F
- d. Check SG pressures - LESS THAN 210 P S I G
- e. Manually c o n t r o l SG atmospheric steam dumps t o m a i n t a i n SG pressures a t 210 p s i 0 1 7.
Check Reactor S u b c r i t i c a l :
o I n t e r m e d i a t e range channels -
ZERO OR NEGATIVE STARTUP RATE o Source range channels - ZERO OR NEGATIVE STARTUP RATE
- b. L o c a l l y dump steam u s i n g SG atmospheric steam dumps:
o Refer t o 2-SOP-ESP-001, LOCAL EQUIPMENT OPERATION AND COMPENSATORY ACTIONS for l o c a l o p e r a t i o n as necessary.
c. Perform t h e f o l l o w i n g :
- 2) Go t o Step 1 7.
- d. Continue w i t h Step 1 7. WHEN SG pressures decrease t o l e s s t h a n 210 p s i g, THEN do Step 16e.
e. L o c a l l y c o n t r o l SG atmospheric steam dumps t o m a i n t a i n SG pressures a t 210 p s i g :
o Refer t o 2-SOP-ESP-001, LOCAL EQUIPMENT OPERATION AND COMPENSATORY ACTIONS for l o c a l o p e r a t i o n as necessary.
C o n t r o l SG atmospheric steam dumps t o s t o p SG d e p r e s s u r i z a t i o n and a l l o w RCS t o heat up.
~
17 of 28
Number':
1 i 1.1 e :
2-ECA-0.0 LOSS OF ALL AC POWER CAUTION K r v i s i o n Number:
REV. 2 Placing key switches to DEFEAT will prevent auto SI actuation.
f f
f f
t f
f l
f t
t t
~
~
~
~
II Depressurization of SGs will result in SI actuation. SI should be reset to permit manual loading of equipment on 480V bus.
I/
18 Check SI Sianal Status:
- a. SI - HAS BEEN ACTUATED b. Reset SI:
1 ) Check a l l CCW pumps RUNNING a. Go to Step 22. WHEN SI is actuated, THEN do Steps 18b, 19, 20 and 21.
1 ) Place non-running CCW pumps CCR control switches in PULLOUT.
- 2) Place controls for main AND bypass feedwater regulating valves to CLOSE 3 ) Verify Automatic Safeguards Actuation key switches on Panel SB-2 in DEFEAT position:
o Train A SIA-1
- AND -
o Train B SIA-2 4 ) One at a time, depress Safety Injection reset buttons (Panel SB-2):
o Train A o Train B
- 5) Verify Train A AND B - RESET 5 ) Verify Relays reset (Top of Safeguards Initiation Racks 1-1 AND 2-11:
0 SIA-1 o SIM-1 0 SIA-2 o SIM-2 18 of 28
2-ECA-0.0 ACTION/EXPECTED RESPONSE ATTACHMENT 1 p r o v i d e s a l i s t o f Phase A valves.
LOSS OF ALL AC POWER R E V. 2
- 19.
V e r i f y Containment I s o l a t i o n Phase A :
- a. Phase A - ACTUATED 0 T r a i n A master r e l a y C A I (above r a c k E )
o T r a i n 8 master r e l a y CA2 (above r a c k F )
- b. Phase A v a l v e s - CLOSED
- c. I V S W v a l v e s o 1410 o 1413 o SOV-3518 o SOV-3519
OPEN:
- a. Manually a c t u a t e phase A.
- b. Manually c l o s e v a l v e s.
I F v a l v e s can NOT be m a n u a l 5 c l o s e d, THEN l o c a l l y c l o s e Val ves.
c. Manually open v a l v e s.
- d. Manually open valves.
e. Place personnel AND equipment h a t c h s o l e n o i d c o n t r o l s w i t c h e s t o INCIDENT on SM panel 19 of 28
Number:
2-ECA-0.0
- 20.
Verify Containment Ventilation Isolation:
T i t l e :
llcvi s ion Number:
LOSS OF ALL AC POWER REV. 2
- a. Containment purge valves -
- a. Manually close valves.
CLOSED:
o FCV-1170 iHEN close valves from fan o FCV-1171 room.
o FCV-1173 IF valves can NOT be closed, IF valves can NOT be closed, o FCV-1172 inEN dispatch operator and HP personnel to close outside valves by isolating instrument air:
0 FCV-1171, IA-780 0 FCV-1173, IA-779 b. Containment pressure relief b. Manually close valves.
valves - CLOSED:
o PCV-1190 iHEN close valves from fan 0 PCV-I191 room.
0 PCV-1192 IF valves can NOT be closed, IF valves can NOT be closed, THEN dispatch operator AND H P personnel to close outside valves by isolating instrument air:
0 PCV-1191, IA-777 o PCV-1192, IA-778 IF containment pressure relief can &QJ.
be isolated, jXJN-locally close the following valves (Fan House 88 ft. e l ) :
0 UH-1013, Pressure Relief Fan 0 UH-1014, Pressure Relief Fan Inlet Stop Outlet stop 20 of 28
Nuniber :
2 - ECA-0. O 2 1. Check Containment Pressure - HAS Perform t h e f o l l o w i n g :
REMAINED LESS THAN 24 P S I G a.
V e r i f y containment sDraY
Title:
Revision Number:
LOSS O F ALL AC POWER REV. 2 s i g n a i actuated. U ' ~,
THEN manually a c t u a t e.
b. V e r i f y containment i s o l a t i o n Phase B v a l v e s c l o s e d.
IF
- NOT,
~ THEN manually c l o s e v a l v e s.
I F v a l v e s can NOT be manually c l o s e d, TnEN l o c a l l y c l o s e v a l v e s.
c. V e r i f y I V S W i s o l a t i o n v a l v e s open:
o 7864 o 7865 o 7866 o 7867
- d. One a t a t i m e, depress Containment Spray Reset Pushbuttons:
o Spray SYS Reset T r a i n A o Spray S Y S Reset T r a i n B 2 2. Check Core E x i t TCs - LESS THAN I F Core E x i t temperatures g r e a t e r 1200°F t h a n 1 2 0 0 ° F and i n c r e a s i n g, THEN 40 t o S A C R G - I, SEVERE ACCIDENT CONTROL ROOM GUIDELINE I N I T I A L RESPONSE, Step 1.
21 o f 28
Number:
2-ECA-O. O o 2A AND 3A 1 )
Check s t a t u s o f l o c a l litle:
Rev is ion Nuiubcr:
LOSS OF ALL AC POWER R E V. 2 OR -
a c t i o n s :
o 5A
- OR o 6A o AC power r e s t o r a t i o n o RCP seal i s o l a t i o n.
o DC power s u p p l y.
- 2) Check s t a t u s o f a u x i l i a r y b o r a t i o n systems:
o BAST t e m p e r a t u r e g r e a t e r t h a n 155°F.
I F temperature less t h a n 155°F. request TSC t o p r o v i d e emergency power supply f o r b o r i c a c i d h e a t t r a c e t o p r e v e n t c r y s t a l 1 i r a t i o n.
- 3) Check s t a t u s of spent fuel c o o l i n g :
o Spent fuel p i t l e v e l g r e a t e r t h a n l o w l e v e l a l a r m.
I F l e v e l l e s s t h a n l o w level alarm, THEN d i s p a t c h NPO t o makeup t o t h e spent f u e l p i t as necessary.
4 ) Open doors on a l l c o n t r o l room c a b i n e t s.
5 ) D i s p a t c h NPO t o open AFW pump room r o l l -up d o o r.
6 )
Return t o Step 11.
OBSERVE CAUTION P R I O R TO STEP 11.
22 of 28
Number:
l i t l e :
2-ECA-O. O LOSS OF ALL AC POWER CAUTION The loads placed on the energized 480V bus should NOi exceed the capacity of the power source.
f f
f f
t f
l f
+
I t
t t
t t
t
~
~
~
NOTE ATTACHMENT 2 provides a list of 480V equipment load ratings.
R e v i s i o n Number:
REV. 2
- 25.
Verify Service Water System Ouerati on :
I a. Verify a t least one pump -
- a. Manually start pump.
RUNNING ON ESSENTIAL HEADER I
- b. Service water valves from
- b. Locally open valves as 23 of 28
Number:
l ~ i t i e :
2-ECA-0.0 LOSS OF ALL AC POWER a1 ternate power supply per 2-SOP-27.1.6, INSTRUMENT BUS, DC OISTRIBUTION SYSTEM AND PA SYSTEM INVERTER llev is ion Nllmber :
REV. 2
- d. 23 Static Inverter on alternate power supply per 2-SOP-27.1.6 o Bus 2A:
- a. MCCs:
- b. 22 Battery Charger in service
- c. 22 Static Inverter on alternate power supply per 2-SOP-27.1.6
- d. PA System Inverter on alternate power supply per 2-SOP-27.1.6 This Step continued on thc n r x t page.
24 of 28
Numtier :
2-ECA-0.0 o Bus SA:
Title:
Revision Number:
LOSS OF ALL AC POWER REV. 2
- a. MCCs:
o MCC 26B o MCC 27A b. 24 Battery Charger in service
- c. 24 Static Inverter on alternate power supply per 2-SOP-27.1.6 25 of 28
Nurnoer :
1 i t.1 e :
2 - ECA-0.0 LOSS OF ALL AC POWER NOTE If RCP seal cooling was previously isolated, f u r t h e r cooling of the RCP s e a l s will be established by natural circulation cooldown as directed i n subsequent procedures.
Revision Number:
REV. 2
- 27.
Select Recovery Procedure:
a. Check RCS subcooling based on a. Go t o 2-ECA-0.2, LOSS O F ALL core e x i t TCs - GREATER THAN AC POWER RECOVERY WITH SI VALUE OBTAINED FROM TABLE:
REQUIRED, Step 1.
0
- 400 401 - 800 801 - 1200 1201 - 2500 52 ( 8 3 )
36 (49) 23 ( 3 0 )
19 ( 2 6 )
b. Check PRZR level - GREATER b. GO to 2-ECA-0.2, LOSS OF ALL THAN 14% (33% FOR ADVERSE AC POWER RECOVERY WITH SI CONTAINMENT)
REOUIRED, Step 1.
c. Check i f S I equipment -
C. GO t o 2-ECA-0.1, LOSS O F ALL ACTUATED WITH RESULTANT AC POWER RECOVERY WITHOUT SI INJECTION FLOW UPON AC POWER REQUIRED, Step 1.
RESTORATION
- d. Gn to 2-ECA-0.2. LOSS OF All
~~
AC POWER RECOVERY WITH SI REQUIRED, Step 1 END 26 of 28
Number:
1itie:
2-ECA-0.0 LOSS OF ALL AC POWER ATTACHMENT 1 (Attachment page 1 of 1)
CONTAINMENT ISOLATION VALVES llevisiorl Number:
REV. 2
- 1.
- 2.
The followina valves will close on Phase A isolation:
VALVE NAME CCW from excess letdown Hx CCW t o excess letdown Hx Vent header from RCDT Gas analyzer PRT Gas analyzer RCDT Letdown from regenerative HX Letdown oriface control stop valves Make-up to PRT Containment sump pumps to WDS - hold-up tank Instrument air to containment RCDT to WDS - hold-up tank SG blowdown and sampling system Radiation monitor return t o containment Accumulator sampl es Sample - pressurizer steam Sample - pressurizer liquid Sample - RCS loops SJAE to containment Hi-Rad sample system return to containment sump Recirculation pump discharge sample line Accumulator NZ Supply Line Stop VALVE NUMBER(s 1
796, 793 798, 791 1786, 1787 548, 549 1788, 1789 201, 202 ZOOA, 2008, 2OOC 519, 552 1723, 1728 1702, 1705 PCV - 1228 PCV-1214, 1214A PCV-1215, 1215A PCV-1216, 1216A PCV-1217, 1217A PCV-1234, 1235 PCV-1236, 1237 9566, 956H 956A, 956B 956C. 9560 21, 22, 23 MOV-956E, 956F 1229, 1230 MOV-4399, 5132 MOV-YYOA, YYOB 863 The followinq valves will close on Phase B isolation:
VALVE NAME VALVE NUMBER(s1 Component cooling from RCS thermal barrier return MOV-789, FCV-625 Component cooling from RCS motor bearing return MOV-786, 784 Component cooling to RCS pumps MOV-769, 797 Seal water return containment isolation valve MOV - 222 END 27 of 28
~
Nunibf r :
i i t l e :
Revision Number':
2 - ECA-O. O LOSS OF A L L AC POWER REV. 2 ATTACHMENT 2
( A t t a c h m e n t page 1 of 1) 4 8 0 V EQUIPMENT LOAD RATINGS 1
U s e t h e f o l ! o w i n q t a b l e t o d e t e r m i n e 48OV e a u i o m e n t l o a d r a t i n q s :
EOUIPMENT 21 SERVICE WATER PUMP 22 SERVICE WATER PUMP 23 SERVICE WATER PUMP 24 SERVICE WATER PUMP 25 SERVICE WATER PUMP 26 SERVICE WATER PUMP PRLR CONTROL HEATERS 2 1 PRZR BU HEATERS 22 PRZR BU HEATERS 23 PRZR BU HEATERS 21 AFW PUMP 23 AFW PUMP 21 FAN COOLER U N I T 22 FAN COOLER U N I T 23 FAN COOLER U N I T 24 FAN COOLER U N I T 25 FAN COOLER U N I T 2 1 S I PUMP 22 S I PUMP 23 S I PUMP 21 SPRAY PUMP 22 SPRAY PUMP 21 RHR PUMP 22 RHR PUMP 21 CHARGING PUMP 22 CHARGING PUMP 23 CHARGING PUMP 2 1 RECIRC PUMP 22 RECIRC PUMP 2 1 CCW PUMP 22 CCW PUMP 23 CCW PUMP 2 1 L I G H T I N G TRANSFORMEF 22 L I G H T I N G TRANSFORMEF 23 L I G H T I N G TRANSFORMEF TURBINE AUX O I L PUMP STATION A I R COMPRESSOR 282 KW 282 KW 485 KW 250 KW 250 KW 316 KW 350 KW 150 KW 299 KW 228 KW 225 KW 93 KW 22 DG BUS 2 A BUS 3 A 282 KW OR 282 KW 282 KW OR 282 KW 485 KW 250 KW 316 KW 228 KW 554 KW 384 KW 250 KW 316 KW 303 KW 1 5 0 KW 150 KW ( N )
225 KW 23 DG BUS 6 A 282 KW 282 KW 2 7 7 KW 384 KW 250 KW 345 KW 350 KW 303 KW 150 KW 299 KW 228 KW 150 KW ( E )
112 KW END 28 o f 28