ML083370706

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting Between PPL Susquehanna, LLC Management and NRC Staff to Discuss Results of the NRC Team Inspection Covering Scoping and Aging Management
ML083370706
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/02/2008
From: Conte R
Engineering Region 1 Branch 1
To:
Conte R, DRS/EB1, 610-337-5183
References
MN 08-037
Download: ML083370706 (4)


Text

      • CANCELLED ***

MN No.08-037 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING December 2, 2008 Licensee:

PPL Susquehanna LLC Facility:

Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos:

50-387, 50-388 Date and Time:

December 16, 2008, 6:30 p.m.

Location:

Meeting Room of Eagles Building 107 S Market St Berwick, PA

Purpose:

NRC staff will inform PPL management of the results of the NRC team inspection covering the scoping and aging management portions of the Susquehanna Steam Electric Station application for a renewed license.

Aging management programs manage the affects of aging on safety systems and certain other special systems within the scope of license renewal.

Attendees:

NRC:

D. Roberts Deputy Division Director, DRS, Region I R. Conte Chief, Engineering Branch 1, DRS, Region I G. Meyer Sr. Reactor Inspector/Team Leader, DRS, Region I PPL:

W. Spence Executive VP and Chief Nuclear Officer N. Gannon Vice President, Nuclear Operations R. Pagodin General Manager, Nuclear Engineering J. Krais Manager, Special Projects Public Participation: The 6:30 p.m. management meeting is a Category 1 Meeting. The public is invited to observe this meeting. Per the attached agenda, following the business portion of the meeting, the public will have an opportunity to communicate with the NRC staff regarding the Susquehanna application for a renewed license, and the role of the NRC in ensuring safe plant operations.

2 Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC no later than two business days prior to the meeting.

Information regarding the NRC's license renewal process and reactor oversight process can be found on the NRC's web site at:

http://www.nrc.gov/reactors/operating/licensing/renewal.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Richard Conte, Chief, Engineering Branch 1 610-337-5183 E-mail: richard.conte@nrc.gov Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: ____ /RA/_________

Richard Conte, Chief Engineering Branch 1 Division of Reactor Safety cc w/encl:

W. Spence, Executive Vice-President, Chief Operating Officer/Chief Nuclear Officer C. Gannon, Vice President, Nuclear Operations R. Paley, General Manager, Plant Support R. Pagodin, General Manager, Nuclear Engineering M. Crowthers, Manager, Nuclear Regulatory Affairs R. Smith, General Manager, Site Preparedness and Services D. Brophy, Supervisor, Nuclear Regulatory Affairs J. Helsel, Manager, Training M. Rose, Manager, Quality Assurance J. Scopelliti, Community Relations Manager B. Snapp, Esq., Associate General Counsel, PPL Services Corp Supervisor, Document Control Services, PPL Susquehanna, LLC R. Osborne, Allegheny Electric Cooperative, Inc.

D. Allard, Director, PA Dept of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee, Sierra Club E. Epstein, TMI-Alert (TMIA)

J. Powers, Dir, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency

Agenda License Renewal Inspection Public Exit Meeting Susquehanna Steam Electric Station, Units 1 and 2 December 16, 2008 6:30 PM Introductions and Opening Remarks................................................... NRC (5 minutes)

Review of License Renewal Process.................................................. NRC (10 minutes)

Discussion of results of license renewal inspection............................. NRC (20 minutes)

PPL Response and Remarks........................................................... PPL (10 minutes)

NRC Closing Remarks....................................................................... NRC (5 minutes)

Break (10 minutes)

NRC will remain to address public questions...................................... NRC/Public (60 minutes)

Distribution w/encl:

(via e-mail)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

RIDSNRRADRO RIDSNRRDIRS RIDSNRRDIRSLPAB RIDSNRRDORL RIDSNRRDORlLpl1-1 RIDSNRRDORlLpl1-2 S. Collins, RA M. Dapas, DRA D. Lew, DRP M. Gamberoni, DRS J. Clifford, DRP D. Roberts, DRS R. Conte, DRS P. Krohn, DRP G. Meyer, DRS R. Fuhrmeister, DRP T. Setzer, DRP F. Jaxheimer, DRP, Senior RI G. Newman, DRP, Actg RI S. Williams, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Kim, NRR B. Vaidya, NRR, PM J. Hughey, Backup, NRR D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO S. Farrell, DRP, Resident OA Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist PMNS RESOURCE Region I Docket Room (with concurrences)

SUNSI Review Complete: RJC (Reviewer=s Initials)

ML083370706 DOCUMENT NAME: G:\\DRS\\Engineering Branch 1\\Meyer\\Susquehanna exit meeting\\MeetingNotice&Agenda.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRP RI/DRS NAME GMeyer PKrohn/GTD for RConte DATE 12/02/08 12/02/08 12/02/08 OFFICE NAME DATE OFFICIAL RECORD COPY