ML083240167
Jump to navigation
Jump to search
| ML083240167 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/25/2008 |
| From: | Tanya Smith NRC/FSME/DWMEP/DURLD |
| To: | NRC/FSME |
| Shared Package | |
| ML083190068 | List: |
| References | |
| TAC J00334 | |
| Download: ML083240167 (1) | |
Text
November 25, 2008 NOTE TO:
File FROM:
Theodore Smith, Project Manager
/RA/
FSME/DWMEP/DURLD/URLB
SUBJECT:
SUMMARY
OF NOVEMBER 5, 2008 MEETING The enclosed letter to Joseph Plona concerns a meeting which occurred on November 5, 2008 with Fermi-1. The letter, as well as the enclosures are to be placed in the NRC ADAMS system with the date of November 25, 2008.