ML083230733
| ML083230733 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/12/2008 |
| From: | Conte R Engineering Region 1 Branch 1 |
| To: | Ashley D, Barber S, Baty M, Ronald Bellamy, Modes M, Andrew Rosebrook NRC Region 1 |
| References | |
| FOIA/PA-2008-0306 | |
| Download: ML083230733 (1) | |
Text
Richard Conte From:
Sent:
To:
Cc:
Attachments:
Richard Conte Monday, May 12, 2008 12:31 PM Mary Baty; Donnie Ashley; Ronald Bellamy; Andrew Rosebrook; Scott Barber; Michael Modes Louise Lund; Rani Franovich; Rajender Auluck; Jerry Dozier 2008AnnAss&LicRenQ&AsRevO.doc For addressees, any comments in preps for annual assessement meeting at Oyster Creek.
The IG was taken directly from the approved comm plan on IG and lic. ren.
The metal fatigue was taken out of latest we send to PAO, DLR as revised by Fair.
The general stuff came out of correspondence sent to whomever.
Andy use the chart on license renewal timeline give to the EDO in a recent brief - I couldn't figure out how to copy it.
Donnie, we might need update on Q2 on number of plants renewed and in the hopper.
Donnie, I need Mary's input on the five actions before the commission - sent cc to her for overall flavor, permission to be factual based without giving views away on ligtigation matters and other stuff before the commission. This would be continuation of the timeline noted above.
Richard J. Conte Chief, Enwineering Branch No. 1, DRS, Reg. I Ib)(6)/
Off. 610-337-5183 aordanen Win.
- _tteF, reoin WS deleted Ift accord"Ce With'the Flreedom of ljfntfoatbo~
Act, exempfions
~
ejQ 1