October 22, 2008
Randall K. Edington, Executive
Vice President, Nuclear/CNO
Mail Station 7602
Arizona Public Service Company
P.O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF
INSPECTION (NRC INSPECTION REPORT 05000528/2008005;
05000529/2008005; 05000530/2008005) AND REQUEST FOR INFORMATION
Dear Mr. Edington:
From November 17-21 and December 1-5, 2008, Reactor Inspectors from the NRCs Region IV
office will perform the baseline inspection of changes, tests, or experiments, and permanent
plant modifications at Palo Verde Nuclear Generating Station, using NRC Inspection
Procedure 71111.17, Evaluations of Changes, Tests, or Experiments, and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Delbert Elkinton of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Sam Graves at (817) 860-8102 (samuel.graves@nrc.gov).
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE GI O N IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON, TEXAS 76011-4005
Arizona Public Service Company
- 2 -
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Russell L. Bywater, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-528; 50-529; 50-530
Licenses: NPF-41; NPF-51; NPF-74
Enclosure:
Evaluations of Changes, Tests, or
Experiments and Permanent Plant
Modifications Document Request
cc: w/enclosure
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, AZ 85007
Mr. Douglas Kent Porter
Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O. Box 800
Rosemead, CA 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, AZ 85003
Mr. Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, AZ 85040
Arizona Public Service Company
- 3 -
Mr. Scott Bauer, Director
Regulatory Affairs
Palo Verde Nuclear Generating Station
Mail Station 7636
P.O. Box 52034
Phoenix, AZ 85072-2034
Mr. Dwight C. Mims
Vice President
Regulatory Affairs and Plant Improvement
Palo Verde Nuclear Generating Station
Mail Station 7605
P.O. Box 52034
Phoenix, AZ 85072-2034
Mr. Jeffrey T. Weikert
Assistant General Counsel
El Paso Electric Company
Mail Location 167
123 W. Mills
El Paso, TX 79901
Mr. Eric Tharp
Los Angeles Department of Water & Power
Southern California Public Power Authority
P.O. Box 51111, Room 1255-C
Los Angeles, CA 90051-0100
Mr. James Ray
Public Service Company of New Mexico
2401 Aztec NE, MS Z110
Albuquerque, NM 87107-4224
Mr. Geoffrey M. Cook
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. D21
San Clemente, CA 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, AZ 85251
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
1701 North Congress Avenue
Austin, TX 78701-3326
Arizona Public Service Company
- 4 -
Ms. Karen O' Regan
Environmental Program Manager
City of Phoenix
Office of Environmental Programs
200 West Washington Street
Phoenix, AZ 85003
Mr. John C. Taylor
Director, Nuclear Generation
El Paso Electric Company
340 East Palm Lane, Suite 310
Phoenix, AZ 85004
Chief, Radiological Emergency Preparedness Section
National Preparedness Directorate
Technological Hazards Division
Department of Homeland Security
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Arizona Public Service Company
- 5 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Ryan.Treadway@nrc.gov)
Resident Inspector (Michelle.Catts@nrc.gov)
Resident Inspector (Jim.Melfi@nrc.gov)
Resident Inspector (Joe.Bashore@nrc.gov)
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
PV Site Secretary (Patricia.Coleman@nrc.gov)
Senior Project Engineer, DRP/D (Don Allen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov)
SUNSI Review Completed:
ADAMS: 6 Yes
No Initials:
6 Publicly Available Non-Publicly Available Sensitive
6 Non-Sensitive
S:\\DRS\\REPORTS\\PV2008005lt-stg.doc
ML08
RI:EB1
RI:EB1
RI:EB1
C:EB1
SGraves
SMakor
JDrake
RLBywater
/RA/
/RA/
/RA/
/RA/
10/22/08
10/22/08
10/22/08
10/22/08
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Inspection Dates:
November 17, 2008 - November 21, 2008
December 1, 2008 - December 5, 2008
Inspection Procedures:
IP 71111.17 Evaluation of Changes, Tests, or Experiments and
Permanent Plant Modifications
Inspectors:
S. Graves, Senior Reactor Inspector, Lead Inspector
J. Drake, Senior Reactor Inspector
S. Makor, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com preferred) in care of S. Graves, by November 3, 2008, to facilitate the
selection of specific items that will be reviewed during the onsite inspection weeks. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. We ask that the
specific items requested be available and ready for review on the first day of inspection. Also,
we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically if possible. If requested documents are
large and only hard copy formats are available, please inform the inspector(s), and provide
subject documentation during the first day of the onsite inspection. If you have any questions
regarding this information request, please call the lead inspector as soon as possible.
1. A list with descriptions of all 10 CFR 50.59 screenings performed since June, 2006,
which did not result in an evaluation. Note: Description of screenings should be brief, but
of sufficient detail so that inspectors can determine the significance of the issue
2. A list with descriptions of all 10 CFR 50.59 evaluations performed which did not result in
an application for license amendment to NRC from June 2006 to the present. Note:
Description of evaluations should be brief but of sufficient detail so that inspectors can
determine the significance of the issue
3. Palo Verde Nuclear Generating Station procedure for conducting 10 CFR 50.59
screenings and evaluations
4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59
activities, including screenings and evaluations from June 2006 to the present
5. A list with descriptions of all permanent plant modifications dating from June 2006.
Include sufficient detail to enable the inspector to determine the significance of each
modification
- 2 -
Enclosure
6. Palo Verde Nuclear Generating Station procedure for implementing and controlling
permanent plant modifications
7. A list with descriptions of all Corrective Action documents related to your permanent
plant modification program and its implementation since June, 2006. Include sufficient
detail to enable the inspector to determine the significance of each modification
8. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,
including qualification dates
9. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates
Inspector Contact Information:
S. Graves
S. Makor
J. Drake
Senior Reactor Inspector
Reactor Inspector
Senior Reactor Inspector
817-860-8102
817-276-6507
817-276-6558
Samuel.Graves@nrc.gov
Shiattin.Makor@nrc.gov
James.Drake@nrc.gov
Mailing Address:
US NRC Region IV
Attn: S. Graves
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125