Sequoyah Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 08:17:26 Report 22 3

EB3TI172

- U2 TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 09/08/2008 09/12/2008 1, 2 2515/172 IP 3

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/06/2008 10/10/2008 1, 2 2515/171 IP 4

PSB1-EP

- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 10/13/2008 10/17/2008 1, 2 2515/175 IP EP Baseline Inspection Exercise Evaluation 10/13/2008 10/17/2008 1, 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/13/2008 10/17/2008 1, 2 7111404 IP Baseline Inspections Drill/Exercise Performance 10/13/2008 10/17/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/13/2008 10/17/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 10/13/2008 10/17/2008 1, 2 71151-EP03 IP 2

TI-176

- EDG TECH SPEC SURV ENDURANCE MARGIN TEST Generic Safety Inspection Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 10/28/2008 10/29/2008 1, 2 2515/176 IP 2

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 12/01/2008 12/05/2008 1, 2 7111111B IP 6

EB1-MODS - MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 12/01/2008 12/05/2008 1, 2 7111117 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 12/08/2008 12/12/2008 1, 2 7111117 IP 4

OL EXAM

- INITIAL EXAM PREP Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009 1

V23307 4

OL EXAM

- INITIAL EXAM - WEEK 1 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/26/2009 01/31/2009 1

V23307 3

OL EXAM

- INITIAL EXAM - WEEK 2 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 1

V23307 1

PSB1-RP

- RP OCCUPATIONAL PREINSPECTION VISIT Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 02/17/2009 02/19/2009 1, 2 60855.1 IP Baseline Inspections Access Control to Radiologically Significant Areas 02/17/2009 02/19/2009 1, 2 7112101 IP 2

PSB1-RP

- RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 03/30/2009 04/03/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/30/2009 04/03/2009 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/30/2009 04/03/2009 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/30/2009 04/03/2009 1, 2 71151-PR01 IP 2

EB3ISI

- UNIT 1 INSERVICE PROTECTION Baseline Inspections Inservice Inspection Activities - PWR 04/06/2009 04/10/2009 1

7111108P IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Sequoyah Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 08:17:26 Report 22 1

EB3TI172

- TI-172 RCS DM BUTT WELDS Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 04/06/2009 04/10/2009 1

2515/172 IP 2

PSB1-RP

- RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 04/13/2009 04/19/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/13/2009 04/19/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/13/2009 04/19/2009 1, 2 7112202 IP 5

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 08/10/2009 08/14/2009 1

71152B IP Baseline Inspections Identification and Resolution of Problems 08/24/2009 08/28/2009 1

71152B IP 1

EB3-HS

- HEAT SINK Baseline Inspections Heat Sink Performance 08/24/2009 08/28/2009 1, 2 7111107B IP 1

PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 10/26/2009 10/30/2009 1, 2 2515/175 IP EP Baseline Inspection Alert and Notification System Testing 10/26/2009 10/30/2009 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 10/26/2009 10/30/2009 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/26/2009 10/30/2009 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 10/26/2009 10/30/2009 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 10/26/2009 10/30/2009 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/26/2009 10/30/2009 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 10/26/2009 10/30/2009 1, 2 71151-EP03 IP 1

EB3ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 11/02/2009 11/06/2009 2

7111108P IP 1

EB3TI172

- TI-172 RCS DM BUTT WELDS Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 11/02/2009 11/06/2009 2

2515/172 IP 3

OL EXAM

- INITIAL EXAM PREP Not Applicable SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 1

V23325 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.