ML073300214

From kanterella
Jump to navigation Jump to search
Notice of Cancelled Meeting with Duke Power Co, Oconee Units 1, 2, & 3, to Discuss License Amendment Request Dated October 16, 2007 That Proposes Modifications to Mitigate Water Hammers
ML073300214
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/26/2007
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Marinos E
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
Download: ML073300214 (5)


Text

C A

N C

E L

L E

D November 26, 2007 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC (DUKE), OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

DATE & TIME:

Wednesday, November 28, 2007 10:30 a.m. - 2:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

Two White Flint North 11545 Rockville Pike, Room T-09F5 Rockville, Maryland PURPOSE:

To discuss the license amendment request dated October 16, 2007 (ADAMS Accession No. ML072920449) that proposes modifications to mitigate water hammers CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS:

Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

C A

N C

E L

L E

D E. Marinos PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO)

NRC DUKE J. Wilson (NRO)

R. Gambrell J. Tatum (NRO)

P. Earnhardt S. Mazumdar (NRR)

H. Harling K. Scales (NRR)

T. Brown L. Olshan (NRR)

T. Glenn Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page

C A

N C

E L

L E

D E. Marinos PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO)

NRC DUKE J. Wilson (NRO)

R. Gambrell J. Tatum (NRO)

P. Earnhardt S. Mazumdar (NRR)

H. Harling K. Scales (NRR)

T. Brown L. Olshan (NRR)

T. Glenn Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page Distribution:

PUBLIC J. Wilson, NRO LPL2-1 R/F J. Tatum, NRO RidsNrrDorl (TMcGinty)

S. Mazumdar, NRR RidsNrrdorlLpl2-1 (EMarinos)

K. Scales, NRR RidsNrrPMLOlshan (hard copy)

Receptionist (OWFN and TWFN)

RidsNrrLAMOBrien (hard copy)

RidsRgn2MailCenter (JMoorman)

RidsOpaMail RidsAcrsAcnwMailCenter T. Liu, NRR RidsNrrAdro S. Campbell, EDO, Rgn II RidsOgcMailCenter K. Clark, OPA Rgn II Receptionist (OFWN and TFWN) (hard copy)

PMNS Accession Number: ML073300214 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan:nc MOBrien EMarinos DATE 11/26/07 11/26/07 11/26/07 OFFICIAL RECORD COPY

C A

N C

E L

L E

D Enclosure FORTHCOMING MEETING ON NOVEMBER 28, 2007, WITH DUKE POWER COMPANY LLC, TO DISCUSS THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, OCTOBER 16, 2007, LICENSE AMENDMENT REQUEST THAT PROPOSES MODIFICATION TO MITIGATE WATER HAMMERS AGENDA 10:30 a.m. - 10:45 a.m.

Introductions

10:45 a.m. - 11:15 a.m.

Oconee Generic Letter 96-06 history 11:15 a.m. - 11:45 a.m.

Oconee water hammer analysis 11:45 a.m. - 12 noon Break 12 noon - 12:30 p.m.

Discuss of water hammer modifications 12:30 p.m. - 11:15 p.m.

Lunch break 11:15 p.m. - 1:45 p.m.

Continue discussion of water hammer modifications 1:45 p.m. - 2:30 p.m.

Questions and answers 2:30 p.m.

Adjourn

C A

N C

E L

L E

D Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202