Request for Additional Information Regarding CEA Drop Time (MD6627)
ML073050296
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/07/2007
From: Wang A
NRC/NRR/ADRO/DORL/LPLIV
To: Mitchell T
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD6627
Download: ML073050296 (5)


Text

November 7, 2007 Mr. Timothy G. Mitchell Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.1.3.4, CEA DROP TIME (TAC NO. MD6627)

Dear Mr. Mitchell:

By letter dated August 30, 2007, Entergy Operations, Inc. proposed to revise Technical Specification (TS) 3.1.3.4, CEA [Control Element Assembly] Drop Time for Arkansas Nuclear One, Unit 2. The TS change proposed to revise the limit on the drop time for an individual CEA.

The U.S. Nuclear Regulatory Commission staff has reviewed the request, and determined that we require additional information to complete our review. A request for additional information is enclosed. This request was discussed with David Bice of your staff on October 29, 2007, and it was agreed that a response would be provided within 60 days of receipt of this letter.

If you or your staff have any questions concerning the resolution of this matter, please contact me at (301) 415-1445.

Sincerely,

/RA/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Request for Additional Information cc w/encl: See next page

November 7, 2007 Mr. Timothy G. Mitchell Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.1.3.4, CEA DROP TIME (TAC NO. MD6627)

Dear Mr. Mitchell:

By letter dated August 30, 2007, Entergy Operations, Inc. proposed to revise Technical Specification (TS) 3.1.3.4, CEA [Control Element Assembly] Drop Time for Arkansas Nuclear One, Unit 2. The TS change proposed to revise the limit on the drop time for an individual CEA.

The U.S. Nuclear Regulatory Commission staff has reviewed the request, and determined that we require additional information to complete our review. A request for additional information is enclosed. This request was discussed with David Bice of your staff on October 29, 2007, and it was agreed that a response would be provided within 60 days of receipt of this letter.

If you or your staff have any questions concerning the resolution of this matter, please contact me at (301) 415-1445.

Sincerely,

/RA/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLIV R/F\\

RidsAcrsAcnwMailCenter RidsAcrsAcnwMailCenter RidsNrrDorlDpr RidsNrrDorlLpl4 RidsNrrLAJBurkhardt RidsNrrPMAWang RidsOgcRp RidsRgn4MailCenter LLois, NRR/DSS/SRXB ADAMS Accession Number: ML073050296 OFFICE LPL4/PM LPL4/LA LPL4/BC NAME AWang JBurkhardt THiltz DATE 11/7/07 11/6/07 11/7/07 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ARKANSAS NUCLEAR ONE, UNIT 2 ENTERGY OPERATIONS, INC.

DOCKET NO. 50-368 OPERATING LICENSE NO. NPF-6 By letter dated August 30, 2007, Entergy Operations, Inc. proposed to revise Technical Specification (TS) 3.1.3.4, CEA [Control Element Assembly] Drop Time for Arkansas Nuclear One, Unit 2 (ANO-2). The TS change proposed to revise the limit on the drop time for an individual CEA. During a conference call on October 29, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff discussed our concerns with the licensee regarding the licensees analyses to support its statement that the average CEA drop time concept has been verified Based on the conference call, the NRC has determined that additional information is needed to complete our review.

As the submittal pointed out, the two major factors in the CEA drop time are core P (change in differential pressure) and the weight of the extension shafts. It is assumed that other factors do not change, i.e., fuel management and control element drive mechanism circuits. In your submittal you state that While the slowest individual CEA is expected to fall up to 0.2 seconds slower and the distance between the fastest and slowest CEAs is increasing, the average CEA drop time concept has been re-verified for a NGF [Next Generation Fuel] core The NRC staff has the following questions regarding this conclusion:

1.

If all other factors are the same and the slowest CEA slows by 0.2 seconds, the NRC staff believes that the average drop time should be slower by 0.2 seconds.

Entergy has stated that the average stays unchanged. Please justify this conclusion.

2.

If the slowest CEA drop time gets slower and the distance (slowest to fastest) increases, how does the average stay constant?

3.

In the submittal, Entergy indicates that the full NGF core to be the limiting case.

Please discuss the transition core (ANO-2 Cycle 20) expected drop times especially if some NGF and Combustion Engineering (CE) assemblies are not in uniformly mixed regions.

4.

Entergy states that an evaluation was performed for the CE and the NGF cores that added the difference of the calculated insertion time to the worst average drop time. The result showed that there is sufficient margin compared to the limit of 3.2 seconds. With regard to this conclusion:

(a)

How did you perform those calculations and what were the numerical results?

(b)

How are the calculations relevant for time differences of 0.2 seconds?

(c)

What were the criteria of sufficiency?

(d)

Did the CEA drop distribution that produced less fission energy include the 0.2 second delay in the slowest CEA drop?

5.

The 0.2 second change represents almost the entire spread in the drop distribution for both fuels, i.e., 3.2x.079 = 0.25 seconds. Therefore, the proposed change appears to be significant. Why does Entergy believe it is not?

6.

Has Entergy accounted for the case in Cycle 20 when the new fuel will be at its peak reactivity? (That is about 10 to 14 megawatt days/metric ton of burn up.)

Arkansas Nuclear One cc:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Site Vice President Entergy Operations, Inc.

Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 General Manager Plant Operations Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Director, Nuclear Safety & Licensing Entergy Services, Inc.

440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Senior Manager, Nuclear Safety

& Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Manager, Licensing Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Section Chief, Division of Health Emergency Management Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 County Judge of Pope County Pope County Courthouse 100 W. Main Street Russellville, AR 72801 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064