AlaerenlE PO Box 620 Callaway Plant Fulton, MO 65251 May 15, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05394 kAmoevn Ladies and Gentlemen:

lIE DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 REQUEST FOR PARTIAL SITE RELEASE Union Electric, d/b/a AmerenUE recently discovered that the required approval per 10 CFR 50.83 was not obtained prior to the sale of non-impacted land from the Callaway Plant site. The sale involved two small parcels of land totaling approximately 0.83 acres that were sold to the State of Missouri on April 20, 2004.

The land was required by the Missouri Highway and Transportation Commission to replace and improve the Logan Creek bridge on Highway 94. The property is located well beyond Callaway's Exclusion Area Boundary and at the northern end of AmerenUE's property in the vicinity of the plant's intake structure on the Missouri River. AmerenUE hereby requests after the sale approval to release this non-impacted property.

Attachment I provides the supporting information for this request in accordance with 10 CFR 50.83(b). This includes a description of property, the results of the historical site assessment of this property and the confirmatory radiological survey, and other evaluations of the effect of releasing this property. These reviews concluded that this property has no residual radioactivity in excess of natural background or fallout levels and qualifies as non-impacted under 10 CFR 50.83. Callaway's evaluation of the effect of releasing this property indicate that all applicable regulatory requirements will continue to be met and no change is needed to Callaway's Operating License or Technical Specifications.

Attachment II shows the general location of the property in relation to Callaway Plant. Attachment III is the quit-claim deed that includes a legal description of the property. Attachment IV is the historical site assessment.

ADOO/

a subsidiary of Ameren Corporation

ULNRC05394 May 15, 2007 Page 2 The information provided is adequate to allow the NRC to make the determinations under 10 CFR 50.83(c) and to approve the release of this property. The property has already been sold to the State of Missouri and the bridge replacement is complete, so there is no required approval date. There is no concern with any other sale or development of this property as it is part of the Highway 94 road easement. The sale of this property did allow the bridge replacement and road improvements in this area, thus significantly improving the safety of this section of Highway 94. Approval is requested within six months of the date of this request.

This letter does not contain any new commitments.

Sincerely, David T. Fitzgerald Manager - Regulatory Affairs Attachment I, Supporting Information for Requested Partial Site Release Attachment II, General Location of Property in Relation to Callaway Plant Attachment III, Quit-Claim Deed Including Legal Description of Property Attachment IV, Historical Site Assessment

ULNRC05394 May 15, 2007 Page 3 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-7D1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Ron Reynolds Director Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102

ULNRC05394 May 15, 2007 Page 4 bcc:

C. D. Naslund A. C. Heflin D. T. Fitzgerald G. A. Hughes D. E. Shafer S. L. Gallagher (100)

L. M. Belsky (NSRB)

K. A. Mills P. M. Bell A160.0761 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and public disclosed).

Send the following without attachments:

Ms. Diane M. Hooper Supervisor, Licensing WCNOC P.O. Box 411 Burlington, KS 66839 Mr. Scott Bauer Regulatory Affairs Palo Verde NGS P.O. Box 52034, Mail Station 7636 Phoenix, AZ 85072-2034 Mr. Scott Head Supervisor, Licensing South Texas Project NOC Mail Code N5014 P.O. Box 289 Wadsworth, TX 77483 Mr. Dennis Buschbaum TXU Power Comanche Peak SES P.O. Box 1002 Glen Rose, TX 76043 Mr. Stan Ketelsen Manager, Regulatory Services Pacific Gas & Electric Mail Stop 104/5/536 P.O. Box 56 Avila Beach, CA 93424 Mr. John O'Neill Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street N.W.

Washington, DC 20037

ULNRC05394 Attachment I May 15, 2007 Page 1 of 4 ATTACHMENT I SUPPORTING INFORMATION FOR REQUESTED PARTIAL SITE RELEASE BACKGROUND In late 2003 the Missouri Department of Transportation started a process to purchase land from AmerenUE needed for road right of way to improve Highway 94 at the Logan Creek bridge. The improvements included bridge replacement as well as the approaches on each side of the bridge. Approximately 0.83 acres land was needed from AmerenUE for the right of way for this project.

The property was not believed to be impacted from Callaway Plant operations and was evaluated for environmental concerns. The soil was sampled for PCBs near a utility pole on the property and no PCBs were detected. No environmental concerns were identified on the property.

The individuals involved in this transaction were not aware of 10 CFR 50.83 which requires NRC approval for release of property from the Callaway Plant site. The property was sold to the State of Missouri on April 20, 2004. Since then the bridge has been replaced and the improvements for the bridge approaches have been completed.

AmerenUE requests NRC approval per 10 CFR 50.83 of the release of this non-impacted property from the jurisdiction of NRC operating license NPF - 30 for Callaway Plant in order to close out any concerns on this transaction. Described below are the historical site assessment, confirmatory radiological surveys and other reviews that show that the property is non-impacted and that the release of the property will not have any adverse impact on public health or safety.

DESCRIPTION OF THE PROPERTY The property consists of two small parcels that total approximately 0.83 acres, located adjacent to Highway 94, one parcel on each side of Logan Creek. The property is over 3.5 miles from the plant site and outside of both the exclusion area and low population area. The Missouri River plant intake and plant discharge point is approximately 2,000 feet from the property. The plant discharge line at the closest approach comes within approximately 800 feet of the property. The property is upgradient of the plant discharge line from the location where it has the closest approach.

The land use is similar to most road easements, being mostly grass covered with some woods. This land is part of the Highway 94 road easement and would not be

ULNRC05394 Attachment I May 15, 2007 Page 2 of 4 expected to be used for any future development. The approximate location of this property in relation to Callaway Plant and the discharge line is shown in Attachment II. The quit-claim deed is in Attachment III, which includes a legal description of the property.

SCHEDULE FOR THE PROPOSED RELEASE This property was sold to the State of Missouri on April 20, 2004. The bridge improvements that required this property have already been completed. Thus, there is no requested schedule of release. However, it is requested that an after the sale NRC approval is granted to close this open issue.

HISTORICAL SITE ASSESSMENT AND SAMPLING

SUMMARY

In accordance with 10 CFR 50.83, AmerenUE has performed an historical site assessment (HSA) of the property. The HSA is provided in Attachment IV. The HSA included reviews of plant events that could have impacted the property and a review of site records. The HSA confirms that the land discussed in this review is non-impacted under 10 CFR 50.83.

In March 2007, environmental sampling was performed on the property and the samples were analyzed for the presence of radioactive materials. A total of four core samples were taken up to a depth of 24 feet. Samples were analyzed for radioactive materials including tritium. All results were within normal background levels.

It is concluded that this land has no reasonable potential for residual radioactivity in excess of natural background or fallout levels based on the results of the radiological survey and on the HSA. Therefore the land qualifies as a "non-impacted area" as per 10 CFR 50.2.

EVALUATION OF EFFECT OF PROPOSED RELEASE AmerenUE has evaluated the effect of releasing the property in accordance with the criteria in 10 CFR 50.83(a) (1) in order to ensure that Callaway Plant will continue to comply with all applicable statutory and regulatory requirements that may be affected by the release of property. AmerenUE has confirmed that no change is necessary in Callaway's Operating License or Technical Specifications as a result of the sale of this property.

As listed below, AmerenUE's evaluation confirmed the following with respect to each of the areas listed in 10 CFR 50.83(a)(1)(i)-(vi):

i.

The dose to individual members of the public does not exceed the limits and standards of 10 CFR Part 20, Subpart E: AmerenUE has determined that this land was never used for any radiological purposes. Additionally

ULNRC05394 Attachment I May 15, 2007 Page 3 of 4 the radiological survey performed on this property shows that there is no residual radioactivity on this property. No radiological activities are planned in the vicinity of this land such that our current programs will ensure no members of the general public will receive doses in excess of 10 CFR Part 20 either at this land or anywhere at Callaway outside of the protected area.

ii.

Emergency Planning and Physical Security: AmerenUE has evaluated the sale of this land in regards to Emergency Planning and Physical Security, specifically in accordance with 10 CFR 50.54 (q) and (p). No credit is taken for this land in either the Emergency Plan or the Security Plan.

Therefore, the land transfer has no adverse impact on either plan.

iii.

Effluent releases remain within license conditions: The land is distant from the plant site or structures that would have any potential for effluent releases. The plant programs to maintain effluent releases within license conditions remain in effect and this land transfer does not impact those programs. Therefore, effluent releases will remain within license conditions.

iv.

Environmental Monitoring Program and Offsite Dose Calculation Manual:

The release of this land does not have any effect on the Environmental Monitoring Program or the Offsite Dose Calculation Manual.

v.

The siting criteria of 10 CFR 100 continues to be met: The release of this property has been reviewed with respect to the siting criteria in 10 CFR 100 and it has no effect on meeting these criteria.

vi.

Other Statutory and Regulatory Requirements: AmerenUE maintains policies and procedures to ensure that statutory and regulatory requirements are met. This land release has no adverse effect on these policies and procedures.

In summary, the sale of this land has no impact on Callaway Plant's continued compliance with applicable NRC regulatory standards.

RESULTS OF 10 CFR 50.59 EVALUATION 10 CFR 50.83(b) requires for non-impacted areas that the licensee submit the results of the evaluation performed in accordance with 10 CFR 50.59. As required, AmerenUE has performed a 10 CFR 50.59 assessment of the free release of this property. The property release only results in a minor change in the property boundary near the plant intake, and no change in any of Callaway Plant's structures systems or components that are described in the Final Safety Analysis Report (FSAR) or any change in plant operations. This sale involves the release of only approximately 0.83 acres from the plant corridor area as described in the FSAR site addendum. The plant corridor area has approximately 2015 acres. The property description in the FSAR site addendum states the plant site consists of approximately 3,188 acres owned by Union Electric and that the land in the peripheral and plant corridor area consist of an approximately 4,042 additional acres owned by Union Electric.

ULNRC05394 Attachment I May 15, 2007 Page 4 of 4 AmerenUE's 10 CFR 50.59 review assessed the impact of the change in the site boundary on offsite dose calculations and effluent releases and concluded that the change:

a. does not adversely affect any design function as described in the FSAR,
b. does not adversely affect how a design function as described in the FSAR is performed or controlled,
c. does not revise or replace and evaluation method used to establish design basis or safety analysis, and
d. does not involve a test or experiment not described in the FSAR.

Therefore this change did not require prior NRC approval under the requirements of 10 CFR 50.59.

ENVIRONMENTAL IMPACTS 10 CFR 50.83(b)(5) requires that a request for NRC approval of a release of non-impacted areas must include the reasons for concluding that the environmental impacts associated with the release of the property will be bounded by appropriate previously issued Environmental Impact Statements. The original construction Final Environmental Statement (FES) for Callaway Plant was issued in March of 1975 and was for Callaway Units 1 and 2. Callaway Unit 1 was constructed, but Callaway Unit 2 was cancelled. In January 1982, the NRC issued the FES for Callaway Unit 1 operation.

AmerenUE has evaluated the environmental impacts associated with the release of this property and considered the impacts in light of the NRC's 1975 FES for construction and the 1983 FES for operation. AmerenUE's evaluation did not identify any significant new environmental impacts or any significant changes from the environmental impacts previously assessed by the NRC. The land transfer has no impact on effluent releases and no impact on offsite dose calculations. Positive highway safety improvements have resulted from the new wider Logan Creek bridge and improved approaches.

AmerenUE concludes that the environmental impacts associated with the proposed release of the property are bounded by the NRC's previous environmental reviews for Callaway Plant.

CONCLUSION AmerenUE has evaluated the impact of releasing this property, and based on the reviews stated, the release of the property has been properly described as non-impacted. Accordingly it is requested that the NRC approve the requested release of this property under the provisions of 10 CFR 50.83.

ULNRC05394 Attachment II May 15, 2007 ATTACHMENT II GENERAL LOCATION OF PROPERTY IN RELATION TO CALLAWAY PLANT

-i I

Callaway Nuclear Plant

!~/

I.

ap N

I~\\

V

(

'5

~

~v.

~"

9, A

~

N

~. 7 F-,

1~-

A.

(

7"i U

9" 4.&jU, f

'4, TA Km Aroa d P"M rSaie General Location of Property Sale in Relation to the Callaway Plant

ULNRC05394 Attachment HI May 15, 2007 ATTACHMENT III QUIT-CLAIM DEED INCLUDING LEGAL DESCRIPTION OF PROPERTY

No. 404463 Book M387 Page 949 Callaway County.

State of Missouri R E C OR D E D Jun 8. 2004 10:22 AM Fees $30.00 f

Kenneth iIlo

/

order of Deeds 17 Deputy This area to be used for recording information only.

Route: 94 County: Callaway Project: J5S0351C Parcel: 3 QUIT-CLAIM DEED THIS DEED, made and entered into effective the QD/A-day,' PR) L

,2004, by and between UNION ELECTRIC COMPANY d/b/a AmerenUE, 1901 Chouteau Avenue, P.O. Box 66149, St. Louis, Missouri 63166-6149, a Missouri corporation ("Grantor"), and THE STATE OF MISSOURI, acting by and through the MISSOURI HIGHWAY AND TRANSPORTATION COMMISSION, P.O. Box 718, Jefferson City, Missouri, 65102, ("Grantee"),

WITNESSETH, That Grantor in consideration of the sum of ONE THOUSAND TWO HUNDRED and No/100ths Dollars ($1,200.00) to it paid by Grantee, the receipt of which is hereby acknowledged, does by these presents Remise, Release and forever Quit-Claim unto Grantee, its successors and assigns, the following described real estate situated in the County of Callaway, State of Missouri, to wit:

Two tracts of land containing a total of.83 acres, more or less, located in the Southeast Quarter of the Southeast Quarter of Section 31, Township 46 North, Range 7 West, and the West Half of the Southwest Quarter of Section 32, Township 46 North, Range 7 West, all in the County of Callaway, State of Missouri, more particularly described as follows:

TRACT NO. 1:

All of Grantor's land within a tract of land being bound on the North by Grantor's Northerly property line, bounded on the West by Grantor's Westerly property line (also known as existing right of way); and bounded on the South and East by a line described as follows:

Beginning at a point 80.60 feet radial distance Southeasterly of Station 1388+34.78; thence Southeasterly to a point 130.1 feet radial distance Southeasterly of Station 1388+43.60; thence Northeasterly to a point 53.68 feet radial distance Southeasterly of Station 1393+62.09; thence Northeasterly to a point 35 feet radial distance Southeasterly of Station 1394+51.21.

TRACT NO. 2:

All of Grantor's land within a tract of land being bound on the West by Grantor's Westerly property line (also known as existing right of way line), bounded on the South by Grantor's Southwesterly property line, and on the North and East by a line described as follows:

Beginning at a point 88.96 feet radial distance Southeasterly of Route 94 Station 1374+00; thence Southeasterly to a point 185 feet radial distance Southeasterly of Station 1375+00;

thence Northeasterly to a point 286.03 feet perpendicular distance Southeasterly of Station 1379+37.55; thence Northwesterly to a point 105 feet perpendicular distance Southeasterly of Station 1379+06.53.

The centerline of Route 94 is described as follows:

Commencing at a Land Survey Monument -

Y2 inch iron pin found at the Southeast corner of Section 31, Township 46 North, Range 7 West; thence North 52 Degrees, 52 Minutes, 39.42 Seconds West, a distance of 1,439.9266 feet to Route 94 centerline median P.C. Station 1367+94.46, as witnessed by Larry V. Brickley (LS 1188); thence North 70 Degrees, 18 Minutes, 09 Seconds West, a distance of 457.4675 feet to Route 94 Station 1363+36.9925 (also known as Logan Creek Bypass 1 Station 0+00.00); thence South 70 Degrees, 18 Minutes, 09 Seconds East, a distance of 457.47 feet to Station 1367+94.46; thence Northeasterly on a curve to the left, having a radius of 763.94 feet, a distance of 1,059.78 feet to P.T. Station 1378+54.24; thence North 30 Degrees, 12 Minutes, 50.8 Seconds East, a distance of 679.89 feet to P.C. Station 1385+34.13; thence Northeasterly along a curveto the right, having a radius of '1,762.95 feet, a distance of 827.96 feet to P.T. Station 1393+62.09; thence North 57 Degrees, 07 Minutes, 21.4 Seconds East, a distance of 7.14 feet to Equation Station 1393+69.23 Back = P.C. Station 1394+00 Ahead; thence on a curve to the right, having a radius'of 216.58 feet, a distance of 216.51 feet to P.T. Station 1396+16.51; thence North 67 Degrees, 56 Minutes, 50.9 Seconds, a distance of 243.71 feet to Station 1398+60.22.

SUBJECT TO ALL easements, conditions, restrictions and rights-of-way of record.

EXCLUDING THEREFROM all of Grantor's existing electrical distribution facilities located on, across or under the above described property.

RESERVING, however, unto Grantor, its successors and assigns, the perpetual right and easement to construct, reconstruct, use, operate, maintain, patrol and remove electric and telecommunication lines consisting of poles, guys, anchors, wires, cables, conduits, transformers and other appurtenances thereto, upon, over, across and under the above described property. Grantor further reserves a temporary easement for ingress and egress, to, from, over and across the above described property designated as Tract 2.

Grantee agrees that the existing Route 94 pavement south of the Logan Creek Bridge and Grantor's existing access to Route 94 located in said Tract 2 shall remain in place through September 1, 2005. The temporary easement rights reserved herein by Grantor shall be terminated after September 1, 2005.

TO HAVE AND TO HOLD the same, with all rights, immunities, privileges and appurtenances thereto b61onging unto Grantee, and its successors and assigns, forever.

S..."!N(WITNESS WHEREOF, Grantor has caused these presents to be executed the day and year first above writterl..

UNION ELECTRIC COMPANY d/b/a AmerenUE

.o,,z ce C'-

l t

1a-'"*I,.

Name: "h.

f,-*.

C.(-L..

Title:

  • lewo ir, P*v es".c,-

.'A ight Secretary MISSOURI HIGHWAY AND TRANSPORTATION COMMISSION ATTEST:

.B:.....

MF amne:

~

eko4O

&Tile: 664,J P-4 Secretary

STATE OF MISSOURI CITY OF ST. LOUIS SS On this

?o-&4 day of

./p1?/.

, 2004, before me appeared

,,A41v

-f C-61 E

, to me personally known, who, being by me duly sworn, did say that he is a.SF A// 0R Vice President of UNION ELECTRIC COMPANY d/b/a AmerenUE, and that the seal affixed to the foregoing instrument is the corporate seal of said corporation and that said instrument was signed and sealed in behalf of said corporation by authority of its Board of Directors and said

ýILh> / A/ I t /-

F.

C ci Z E acknowledged said instrument to be the free act and deed of said corporation.

IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my official seal in my office in the City of St. Louis, Missouri, the day and year first above written.

My Commission expires 2TuZ VI?,,20 O2.

'".'.j. "I".

tary Public PUBLIC out STATE OF MISSOURI UIS-

"1 ss,,r OF

  • COUNTY OF COLE 01__ fhiM_* e haU__

,2004, before me appeared

_I_

to me personally known, who, being by me duly sworn, did say that he/she is the

-Maairman of the MISSOURI HIGHWAY AND TRANSPORTATION COMMISSION, and said P II r-a 13 nn a acknowledged said instrument to be the free act and sd 6f a iWIMSid RI HIGHWAY AND TRANSPORTATION COMMISSION.

I IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my official seal in my office in the County of Cole, State of Missouri, the day and year first above written.

My Commission expires, j

L/

DANA L. KAISER NotaryDana L. Kaiser Notary Public MSSySeal

.STATE OF MSOR County of Cqle My Commission Expires.\\.....J4L J I P/rst g:\\redocs\\qcd\\jip-qcd-modot 03/26/04

VJ67+94,46 94 MO VEMEa 1 14 A11,111611111i'lluu co NWJ SWJ 1141 12 FEET WES!3W TMESS.E. CýR OF SEC 31/46H RIF NEM;NG TAMM 1411.93 1ýý N

S, Tr) -',

ýj

, /, & a

ý:)

32-46-7

'No J5035ic

R11C, CONTRACT I D 4,

Ej\\

SE S

4 PROJECT NO.

31ý46-7 TEMP E T.-

IGRIO COUNTY CALLAWAY DATE COMM "p

3162.09 41'

ýý

.ýTY THAI, OR

130, Q)

Pn-IZTA 111511144;51.jý Rx.

YPASS t

SEE SWEET 45) rm-sw 3

6

ýHt E.P..

ROUTE 911 7"4. ýf PC '36 PT 13 a.5 EXIST. ROUTE 94 A T9-27, ;rq ILT.

(CHORD DEF.)

L X73RO'S41j PC 1394+00.00 94y PER..

ROU 94 PRY 11,1911"'Pl, R

P 1389+55.89 DKAI-PI 1 85 ES".

3

.34.13 L......

2.99

ý.-54 VIRT1 END SEC.8 (L AN CREEK)STA.1393+liý,23 FCAESTED PT ""+ý'

od, SHALL FIw"ISH M

LIN

-r-69.0' amww AREA. ITHIM D 3;715;0 IEITý TFEET A ""'

2 I M`M LT 421.76' BEM K -IM'K-E DISTANCE NEER IL Týl wa 762.95' BENR v

E 5 INGS ARE BASED ON [MONUMENT OF 40 FR S

BAY LIMI IS FOR THIS PROJECT 7

SCALE 00 M STA. 0131141460-21 A STA-64400.00. A STAMM OF 1.11 MILES.

A AX il!ý

ý

/

ALL EXISTING CHAIN INFORMATION VORK INDICATE ON THE PLANS THAT EXTEND BEYOND THE

'41 IS ýN CHORD DEFINITION.

AND ALL MEN IMITS I COMIDERED INCIDENTAL TO AND A PART OWF CHA N INFORMATION IS IN ARC DEFINITION CONS7RUCYION OF THIS PROJECT.

Z_

It, f

l.

J -

P, ýp i

EARTHWORI LAND SURVEY MONUMENT -

1/2 IRON PIN A,

v-32-46-7 I-FOUND AT THE S.E. CORNER OF SEC. 31

_tuý T-46-N R-7-9 ON A BEARING OF M52-52' WIN FXIS71KG AND CCOMTRUCTED E R ES Y I STA

+XX.XX TO XXXX-XX-XX 4,

3 I&CLASS A EXC.

80 CY 570 THENCE 1439.93 FEET TO STA. 1367+94.46 BE WIDENED TO A MAXIMIN OF EE BYYYY WITNESSED BY LARRY V. BRICKEY. LS 110 0

PE FILL -

0 CY I

ýRIIXE NO A-988 560 -

SSO

.61 STA XXXX+XX.XX TO XXXX+XX-XX CLASS A EXC. - XXYX CY FILL -

XX-XXX Cy 550 -

ROCIFILL - XX.XXX CY SG PRZAISNO&

CY CLASS A w

ROW AREA ZXL PRMINTX CY CLASS A 540

_IN MU A& 1 a

AFSAY CLASS C 50 ST 3 3+/-1 M

IN fa I

I I

-n 411,1 M) -TRA SITI IN P NIU 0

7--BE.TM-3JRSTý UCTI )N 7--T vr-. ;T- -

Ill w ZNT

ýE STAGE 3 STA XXXX-XX.XX TO XX)D(+XX.XX 530 A

FILL -

XXX CY ME XX Cy CLASS A

-- r

==:**ys SxTXAGE 4

sto POSE OF XXXX CY CLASS A DIS

$10 STAGE 4 XXXX+XX.

xx FIA X.X...

111 510 CLASS A EXC. - Ba CY FILL -

XXXX CY FR&ISNTfXXX3CY CLASS A ON S.V. CORNER OF BRIDGE CURBBENCH MARKS U.S.G.S.

DATUM RIW OVER L X.6007:0170"BaSCREE4400526.33 ME ELEV 523a59 1368 t369 I.T.

131Z 1373 1374 1375 1376 1377 ula 1379 1340 13,81 13112 1383 1390

159, 1392 1393 1394 w.

'L~.pEpJC.,,wAr5sO35I(O1~pIOfl~Sfl..I.~I0O.\\An.or0II.doo OS~4S'S7 A'S SS~OIt201

ULNRC05394 Attachment IV May 15, 2007 ATTACHMENT IV HISTORICAL SITE ASSESSMENT 10 CFR 50.83 process includes a historical site assessment. This has been done for the property involved in this sale to identify potential or known sources of radioactive material or radioactive contamination that may have affected the property. The property is about 3.5 miles from Callaway Plant except for the Intake and discharge structure on the Missouri river. The property is approximately 800 feet from the discharge line at its closest point. This property has not been used for any activities that could have radioactively contaminated the property.

A review of corrective action documents was completed for events that could have had a potential for releasing radioactive material to this property. The only event of any significance for this property was leak in the discharge line that was discovered January 11, 2005. Note that this leak actually occurred after the property had been sold. The leak was water from the discharge line flowing up to the surface near the break. The leak was estimated to be about 50 gallons per minute or less depending on discharge flow. The leak was of fairly short duration as it most likely started only about a day before it was discovered and it was repaired within 10 days.

Compensatory actions were taken to minimize leakage until it could be repaired. It is believed that the break was due to heavy equipment operating on the road directly above the damaged section of piping. The heavy equipment had only been used for about two months prior to the leak being discovered. The repair of the pipe was completed on January 21, 2005.

Low level radioactivity was identified in the water and soil in the immediate vicinity of the leak. The leak was more than 800 feet from the property. The property is upgradient to the leak area and it would not be expected that this leak would have impacted the property. The results of the radiological sampling on the property verify that the property was not impacted.

The findings of this review are that:

1. The land has not been used for plant operations.
2. The land has not been used for storage of any radioactive material or waste.
3. There are no event records that any spills, leaks or uncontrolled release of radioactive material have ever occurred on the land.
4. The closest event that released radioactivity to an area near the land was over 800 feet from the land and the land is upgradient from where the event occurred. Recent sampling confirms there was no impact from this event.

Therefore this property qualifies as a "non-impacted area" as per 10 CFR 50.2.