ML071410072

From kanterella
Jump to navigation Jump to search

License Amendment Request Revising Commitments to USNRC Regulatory Guide 1.82, Revision 0, Sumps for Emergency Core Cooling and Containment Spray Systems and Technical Specification Surveillance Requirement (SR) 3.5.2.8
ML071410072
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/03/2007
From: Gordon Peterson
Duke Energy Carolinas, Duke Power Co
To:
Document Control Desk, NRC/NRR/ADRO
References
TAC MD4748, TAC MD4749
Download: ML071410072 (3)


Text

Duke GARY R. PETERSON awPower Vice President A Duke Energy Company McGuire Nuclear Station Duke Power MG01VP / 12700 Hagers Ferry Rd.

Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters@duke-energy. corn May 3, 2007 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-001

Subject:

Duke Power Company LLC d.b.a. Duke Energy Carolinas, LLC (Duke)

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 License Amendment Request Revising McGuire Units 1 and 2 Commitments to USNRC Regulatory Guide 1.82, Revision 0, "Sumps For Emergency Core Cooling and Containment Spray Systems" and Revising McGuire Units 1 and 2 Technical Specification Surveillance Requirement (SR) 3.5.2.8 and Associated Bases (TACs MD 4748 and 4749)

In response to a telecom on May 3, 2007 between the Nuclear Regulatory Commission (NRC) Staff and Duke, it was acknowledged that the NRC does not approve Technical Specification (TS) Bases. Therefore, the TS bases will be changed to reflect the licensing basis and TS changes associated with the sump modification in accordance with Section 5.5.14 of the McGuire 1/2 TSs.

As a result, Duke withdraws the request for the NRC to review the TS Bases associated with TS Surveillance Requirement 3.5.2.8 submitted with the License Amendment Request dated March 8, 2007.

Please direct any questions you may have in this matter to K. L. Ashe at (704) 875-4535.

Very truly yours, Y. Reto G. R. Peterson,/"/

www. dukepower. corn

May 3, 2007 Nuclear Regulatory Commission Page 2 xc:

W. D. Travers Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, Suite 23T85 Atlanta, GA 30303 J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station J. F. Stang, Jr. (addressee only)

NRC Senior Project Manager (MNS)

U.S. Nuclear Regulatory Commission Mail Stop 0-8 H4A Washington, DC 20555-0001 B. 0. Hall, Senior Chief Division of Radiation Section 1645 Mail Service Center Raleigh, NC 27699-1645

May 3, 2007 Nuclear Regulatory Commission Page 3 Gary R. Peterson affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

Ga ry. FR.Peterson, Vice President, McGuire Nuclear Station Subscribed and sworn to me: _)

Date J:ýý

,Notary Public My commission expires:

2__ I :b__

Date

--