April 3, 2007 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Mel B. Fields, Senior Project Manager /RA/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 -
SUMMARY
OF MEETING HELD ON MARCH 22, 2007, RE: STEAM GENERATOR BATWING DEGRADATION ISSUE On March 22, 2007, Entergy Operations, Inc. (Entergy), the licensee for Waterford Steam Electric Station, Unit 3, met with the Nuclear Regulatory Commission (NRC) staff at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Entergys investigation of the batwing degradation condition, to review analysis supporting safe plant operation, to review the mitigation actions taken, and to discuss Entergys plans for a mid-cycle outage to inspect the steam generator batwings and their support structures. Based on its assessment of the potential impact of the degraded batwing condition on tube integrity, Entergy concluded that inspections on the secondary side of the steam generators should be sufficient to assure plant safety. Entergy will be prepared to conduct eddy current inspections of the steam generator tubes from the primary side if unexpected conditions are observed on the secondary side of the steam generator. At the meeting, the NRC staff inquired about the criteria for determining when primary side tube inspections would be performed and the capabilities of the visual techniques for inspecting the tubes in the vicinity of the batwings. The staff plans to have additional discussions with the licensee once it has developed strategies for deciding when primary side inspections will be needed.
A list of attendees is provided as an enclosure to this memorandum. There were no members of the public represented at the meeting. The slides used during the meeting by Entergy contained proprietary information that is withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations, Part 2, Section 2.390. A non-proprietary version of the slides is available in the Agencywide Documents Access and Management System (ADAMS) under Accession Number ML070870675.
Docket No. 50-382
Enclosure:
As stated cc w/encl: See next page
Pkg ML070870732, Summary ML070870718 [Mtg Notice ML070530458, Non-Proprietary Slides ML070870675, Proprietary Slides ML070870634]
OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MFields JBurkhardt DTerao DATE 4/3/07 4/3/07 4/3/07
MARCH 22, 2007 MEETING WITH ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 STEAM GENERATOR BATWING DEGRADATION ISSUE LIST OF ATTENDEES Entergy Operations, Inc.
Joe Kowalewski Gary Payne Robert Murillo Rex Putnam Jerry Hulman Robert OQuinn Jerry Burford Westinghouse Jeffrey Hall Bill Cullen Peter Nelson Bill Heilker U.S. Nuclear Regulatory Commission Michele Evans Ken Karwoski Emmett Murphy Matt Yoder David Terao Jeff Clark Dwight Chamberlain George Gerond Mel Fields
Waterford Steam Electric Station, Unit 3 cc:
Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President Operations Support Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.
Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751