Ltr, Acknowledgment of Withdrawal of Request for NRC to Rescind Operations Independent Assessments and Receipt of Operations Independent Assessment Plan
ML070850034
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/23/2007
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML070850034 (4)


Text

March 23, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

ACKNOWLEDGEMENT OF WITHDRAWAL OF REQUEST FOR NRC TO RESCIND FUTURE INDEPENDENT ASSESSMENTS OF OPERATIONS PERFORMANCE AT THE DAVIS-BESSE NUCLEAR POWER STATION AND RECEIPT OF OPERATIONS PERFORMANCE INDEPENDENT ASSESSMENT PLAN FOR CALENDAR YEAR 2007

Dear Mr. Bezilla:

This acknowledges receipt of your letter dated March 13, 2007, through which you withdrew your request for the NRC to rescind the Confirmatory Order requirements to perform the remaining 2 years of Operations Performance independent assessments, and provided the assessment plan and related information for the year 2007 independent assessment of the Davis-Besse Nuclear Power Station Operations Performance.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 DISTRIBUTION:

See next page

March 23, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

ACKNOWLEDGEMENT OF WITHDRAWAL OF REQUEST FOR NRC TO RESCIND FUTURE INDEPENDENT ASSESSMENTS OF OPERATIONS PERFORMANCE AT THE DAVIS-BESSE NUCLEAR POWER STATION AND RECEIPT OF OPERATIONS PERFORMANCE INDEPENDENT ASSESSMENT PLAN FOR CALENDAR YEAR 2007

Dear Mr. Bezilla:

This acknowledges receipt of your letter dated March 13, 2007, through which you withdrew your request for the NRC to rescind the Confirmatory Order requirements to perform the remaining 2 years of Operations Performance independent assessments, and provided the assessment plan and related information for the year 2007 independent assessment of the Davis-Besse Nuclear Power Station Operations Performance.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 DISTRIBUTION:

See next page DOCUMENT NAME:C:\\FileNet\\ML070850034.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME EDuncan:dtp DATE 03/23/07 OFFICIAL RECORD COPY

M. Bezilla cc:

The Honorable Dennis Kucinich J. Hagen, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President, Nuclear Support Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Director, Fleet Regulatory Affairs Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners

M. Bezilla DISTRIBUTION:

MXM2 TEB SPS1 TJW2 RidsNrrDirsIrib GEG KGO GLS JER7 DRPIII DRSIII PLB1 TXN