January 22, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
ACKNOWLEDGEMENT OF RECEIPT OF ADDITIONAL INFORMATION IN SUPPORT OF THE REQUEST TO RESCIND FUTURE INDEPENDENT ASSESSMENTS OF OPERATIONS PERFORMANCE AT THE DAVIS-BESSE NUCLEAR POWER STATION
Dear Mr. Bezilla:
This acknowledges receipt of your letter dated January 17, 2007, which provided additional information in support of your request for the Nuclear Regulatory Commission (NRC) to rescind future independent assessments of operations performance at the Davis-Besse Nuclear Power Station. The NRC is currently reviewing your request and upon completion of our review you will be advised of the results by letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
January 22, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
ACKNOWLEDGEMENT OF RECEIPT OF ADDITIONAL INFORMATION IN SUPPORT OF THE REQUEST TO RESCIND FUTURE INDEPENDENT ASSESSMENTS OF OPERATIONS PERFORMANCE AT THE DAVIS-BESSE NUCLEAR POWER STATION
Dear Mr. Bezilla:
This acknowledges receipt of your letter dated January 17, 2007, which provided additional information in support of your request for the Nuclear Regulatory Commission (NRC) to rescind future independent assessments of operations performance at the Davis-Besse Nuclear Power Station. The NRC is currently reviewing your request and upon completion of our review you will be advised of the results by letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 DOCUMENT NAME:C:\\FileNet\\ML070230291.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME EDuncan:sls DATE 01/22/2007 OFFICIAL RECORD COPY
M. Bezilla cc:
The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President, Nuclear Support Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Director, Fleet Regulatory Affairs Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners
M. Bezilla DISTRIBUTION: