ML070160117

From kanterella
Jump to navigation Jump to search
Acknowledgement of Receipt Revision 1 of Perry Request for Removal from the Multiple/Repetitive Degraded Cornerstone Column of the NRC Action Matrix
ML070160117
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/12/2007
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-07-001
Download: ML070160117 (4)


Text

January 12, 2007 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT REVISION 1 OF PERRY REQUEST FOR REMOVAL FROM THE MULTIPLE/REPETITIVE DEGRADED CORNERSTONE COLUMN OF THE NRC ACTION MATRIX

Dear Mr. Pearce:

This acknowledges receipt of your letter dated January 8, 2007, which provided a revision to the attachment to your January 3, 2007, letter in which you requested that the Nuclear Regulatory Commission (NRC) close the two remaining White findings and remove Perry from the Multiple/Repetitive Degraded Cornerstone column of the action matrix. The NRC will review the basis for action matrix transition as provided in the revised attachment to the subject letter.

Upon completion of our review, you will be advised of the results through the end-of-cycle assessment letter (Inspection Report 05000440/2007001), which will be issued in March 2007.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page

January 12, 2007 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT REVISION 1 OF PERRY REQUEST FOR REMOVAL FROM THE MULTIPLE/REPETITIVE DEGRADED CORNERSTONE COLUMN OF THE NRC ACTION MATRIX

Dear Mr. Pearce:

This acknowledges receipt of your letter dated January 8, 2007, which provided a revision to the attachment to your January 3, 2007, letter in which you requested that the Nuclear Regulatory Commission (NRC) close the two remaining White findings and remove Perry from the Multiple/Repetitive Degraded Cornerstone column of the action matrix. The NRC will review the basis for action matrix transition as provided in the revised attachment to the subject letter.

Upon completion of our review, you will be advised of the results through the end-of-cycle assessment letter (Inspection Report 05000440/2007001), which will be issued in March 2007.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page DOCUMENT NAME:C:\\FileNet\\ML070160117.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME EDuncan:sls DATE 01/12/2007 OFFICIAL RECORD COPY

L. W. Pearce cc :

G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Site Operations Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

L. W. Pearce DISTRIBUTION:

DXC1 TEB TJW2 RidsNrrDirsIrib GEG KGO GLS MEF1 CAA1 DRPIII DRSIII PLB1 TXN