ML063250167
| ML063250167 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/20/2006 |
| From: | Eric Duncan NRC/RGN-III/DRP/RPB6 |
| To: | Pearce L FirstEnergy Nuclear Operating Co |
| References | |
| Download: ML063250167 (4) | |
Text
November 20, 2006 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
SUBJECT:
ACKNOWLEDGMENT OF RECEIPT - FINAL UPDATE OF CONFIRMATORY ACTION LETTER COMMITMENTS
Dear Mr. Peace:
This acknowledges receipt of your letter dated November 13, 2006, which provided your final update of the completion of commitments specified in our September 28, 2005, Confirmatory Action Letter. We have reviewed your update and have no further questions at this time.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:
See next page
Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
SUBJECT:
ACKNOWLEDGMENT OF RECEIPT - FINAL UPDATE OF CONFIRMATORY ACTION LETTER COMMITMENTS
Dear Mr. Peace:
This acknowledges receipt of your letter dated November 13, 2006, which provided your final update of the completion of commitments specified in our September 28, 2005, Confirmatory Action Letter. We have reviewed your update and have no further questions at this time.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:
See next page DOCUMENT NAME:C:\\FileNet\\ML063250167.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME EDuncan:dtp DATE 11/20/06 OFFICIAL RECORD COPY L. Pearce cc:
G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
L. Pearch DISTRIBUTION:
DXC1 TEB SJC4 RidsNrrDirsIrib GEG KGO GLS MEF1 DRPIII DRSIII PLB1 TXN