UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations Inc.
Indian Point Energy Center 295 Broadway, Suite 1 Post Office Box 249 Buchanan, NY 10511-0249
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3
Dear Mr. Dacimo:
On August 8, 2006, the NRC staff completed its safety performance review of the Indian Point Nuclear Generating Units 2 and 3 for the first half of the calendar year 2006 assessment cycle.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This safety performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as, Exempt from Public Disclosure in accordance with 10 CFR 2.390, will include the results of our physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Indian Point Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process (ROP) baseline inspections at Indian Point Units 2 and 3. We also plan to conduct an inspection of the pre-operational testing for the independent spent fuel storage facility at Indian Point Energy Center. In addition, we plan to continue enhanced oversight of Entergys performance relative to addressing issues associated with the Unit 2 spent fuel pool leakage, including ground water contamination, and improving the reliability and availability of the alert and notification system, including implementation of backup power requirements, as described in the ROP Deviation Memorandum dated October 31, 2005. We will evaluate the need for continuing this enhanced oversight for calendar year 2007 based on the status of Entergys actions to address the onsite ground water contamination and improve the alert and notification system performance.
The enclosed inspection plan details the baseline and deviation memorandum inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is
F. Dacimo 2
provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspectors arriving onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised based on our end-of-cycle safety performance review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eugene Cobey at (610) 337-5171 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Samuel J. Collins Regional Administrator Region I Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64
Enclosures:
Indian Point Nuclear Generating Unit 2 and Unit 3 Inspection/Activity Plans
F. Dacimo 3
cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Operations, Inc.
M. R. Kansler, President - Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operations Officer C. Schwarz, Vice President, Operations Support P. Rubin, General Manager - Plant Operations O. Limpias, Vice President, Engineering J. McCann, Director, Licensing C. D. Faison, Manager, Licensing, Entergy Nuclear Operations, Inc.
M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc J. Comiotes, Director, Nuclear Safety Assurance P. Conroy, Manager, Licensing, Entergy Nuclear Operations, Inc.
T. C. McCullough, Assistant General Counsel, Entergy Nuclear Operations, Inc.
L. Cortopassi, Site Director of Trg. & Dev.
E. Libby, Manager, Operations Training P. R. Smith, President, New York State Energy, Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc.
Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel Assemblywoman Sandra Galef, NYS Assembly County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congresswoman Sue W. Kelly Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer J. Riccio, Greenpeace A. Matthiessen, Executive Director, Riverkeeper, Inc.
M. Kaplowitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Leventhal, The Nuclear Control Institute K. Coplan, Pace Environmental Litigation Clinic W. DiProfio, PWR SRC Consultant D. C. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant W. Little, Associate Attorney, NYSDEC
F. Dacimo 4
provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspectors arriving onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised based on our end-of-cycle safety performance review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eugene Cobey at (610) 337-5171 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Samuel J. Collins Regional Administrator Region I Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64
Enclosures:
Indian Point Nuclear Generating Unit 2 and Unit 3 Inspection/Activity Plans Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR J. Boska, PM, NRR P. Milano, PM (backup)
B. Holian, DRP D. Lew, DRP E. Cobey, DRP D. Jackson, DRP T. Setzer, DRP C. Long, DRP M. Cox, DRP, Senior Resident Inspector Unit 2 T. Hipschman, DRP, Senior Resident Inspector Unit 3 R. Martin, DRP,OA Region I Docket Room (w/concurrences)
RidsNrrDiplipb@nrs.gov DRS Director and Deputy Director DRS Branch Chiefs D. Screnci, PAO N. Sheehan, PAO Nuclear Institute SUNSI Review Complete: (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\IP 2&3 2006 Mid-Cycle Letterrev.1.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME TSetzer ECobey BHolian SCollins DATE 08 /25/06 08/25/06 08/25/06 08/31/06 OFFICIAL RECORD COPY
Indian Point 2 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 09/01/2006 12:09:34 Report 22 2
- ISFSI Other Routine 06/01/2006 12/31/2006 2
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 4
7111111B
- U2 L.O. REQUAL. PROG.+P/F REVIEW Baseline Inspections 08/07/2006 08/11/2006 2
7111111B IP Licensed Operator Requalification Program Baseline Inspections 08/14/2006 08/18/2006 2
7111111B IP Licensed Operator Requalification Program 1
7112203
- GROUNDWATER CONTAMINATION/DEV MEMO Other Routine 09/04/2006 09/08/2006 2
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 4
- PI&R Baseline Inspections 09/18/2006 09/22/2006 2
71152B IP Identification and Resolution of Problems Baseline Inspections 10/02/2006 10/06/2006 2
71152B IP Identification and Resolution of Problems 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 09/25/2006 09/29/2006 2
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 4
MODS
- MODS & 50.59 Baseline Inspections 10/30/2006 11/03/2006 2
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/30/2006 11/03/2006 2
7111117B IP Permanent Plant Modifications 6
7111401
- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 11/13/2006 11/17/2006 2
7111401 IP Exercise Evaluation Baseline Inspections 11/13/2006 11/17/2006 2
71151 IP Performance Indicator Verification 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 11/13/2006 11/17/2006 2
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 1
7112203
- GROUNDWATER CONTAMINATION/DEV MEMO Other Routine 11/06/2006 11/24/2006 2
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2
TI-169
- MSPI VERIFICATION Safety Issues 11/13/2006 11/17/2006 2
2515/169 IP Mitigating Systems Performance Index Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 12/18/2006 12/22/2006 2
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/18/2006 12/22/2006 2
7112102 IP ALARA Planning and Controls Baseline Inspections 12/18/2006 12/22/2006 2
71151 IP Performance Indicator Verification 6
7111121
- CDBI Baseline Inspections 01/08/2007 01/12/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 01/22/2007 01/26/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 2
7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 2
7111121 IP Component Design Bases Inspection 1
- ISFSI INSPECTIONS Other Routine 01/01/2007 08/01/2007 2
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Indian Point 2 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 09/01/2006 12:09:34 Report 22 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 01/22/2007 01/26/2007 2
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 1
DEV MEMO
- GROUND WATER CONTAMINATION/ DEV MEMO Other Routine 02/05/2007 02/09/2007 2
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1
71121
- OCC RAD SAFETY Baseline Inspections 02/26/2007 03/02/2007 2
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 2
7112102 IP ALARA Planning and Controls 1
71121
- OCC RAD SAFETY Baseline Inspections 03/26/2007 03/30/2007 2
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 2
7112102 IP ALARA Planning and Controls 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 04/24/2007 04/26/2007 2
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 04/30/2007 05/04/2007 2
7111105T IP Fire Protection [Triennial]
Baseline Inspections 05/14/2007 05/18/2007 2
7111105T IP Fire Protection [Triennial]
1 7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 05/07/2007 05/11/2007 2
7112202 IP Radioactive Material Processing and Transportation 1
DEV MEMO
- GROUND WATER CONTAMINATION/ DEV MEMO Other Routine 05/21/2007 05/25/2007 2
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1
71121
- OCC RAD SAFETY Baseline Inspections 07/16/2007 07/20/2007 2
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/16/2007 07/20/2007 2
7112102 IP ALARA Planning and Controls 4
11/5 EXM
- U2 OPERATOR LICENSING INITIAL EXAM Not Applicable 10/08/2007 10/12/2007 2
U01683 FY08 - INDIAN POINT 2 INITIAL EXAM Not Applicable 11/05/2007 11/09/2007 2
U01683 FY08 - INDIAN POINT 2 INITIAL EXAM 1
71114
- EP PRGM INSP Baseline Inspections 09/17/2007 09/21/2007 2
7111402 IP Alert and Notification System Testing Baseline Inspections 09/17/2007 09/21/2007 2
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/17/2007 09/21/2007 2
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/17/2007 09/21/2007 2
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/17/2007 09/21/2007 2
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/17/2007 09/21/2007 2
71151-EP02 IP ERO Drill Participation Baseline Inspections 09/17/2007 09/21/2007 2
71151-EP03 IP Alert & Notification System 1
71121
- OCC RADIATION SAFETY Baseline Inspections 09/24/2007 09/28/2007 2
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Indian Point 2 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 09/01/2006 12:09:34 Report 22 1
- MAINTENANCE RULE Baseline Inspections 12/10/2007 12/14/2007 2
7111112B IP Maintenance Effectiveness This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Indian Point 3 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 09/01/2006 12:08:45 Report 22 2
- ISFSI Other Routine 06/01/2006 12/31/2006 3
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 3
10/23EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 09/25/2006 09/29/2006 3
U01636 INDIAN POINT 3 INITIAL EXAM (FY 07)
Not Applicable 10/23/2006 11/03/2006 3
U01636 INDIAN POINT 3 INITIAL EXAM (FY 07) 3 71152B
- PI&R Baseline Inspections 09/18/2006 09/22/2006 3
71152B IP Identification and Resolution of Problems Baseline Inspections 10/02/2006 10/06/2006 3
71152B IP Identification and Resolution of Problems 1
7112203
- GROUNDWATER CONTAMINATION, DEV MEMO Other Routine 09/04/2006 09/08/2006 3
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 09/25/2006 09/29/2006 3
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 4
MODS
- MODS AND 50.59 Baseline Inspections 10/30/2006 11/03/2006 3
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/30/2006 11/03/2006 3
7111117B IP Permanent Plant Modifications 1
7112203
- GROUNDWATER CONTAMINATION, DEV MEMO Other Routine 11/06/2006 11/24/2006 3
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 6
7111401
- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 11/13/2006 11/17/2006 3
7111401 IP Exercise Evaluation Baseline Inspections 11/13/2006 11/17/2006 3
71151 IP Performance Indicator Verification 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 11/13/2006 11/17/2006 3
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 2
TI-169
- MSPI VERIFICATION Safety Issues 11/13/2006 11/17/2006 3
2515/169 IP Mitigating Systems Performance Index Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 12/18/2006 12/22/2006 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/18/2006 12/22/2006 3
7112102 IP ALARA Planning and Controls Baseline Inspections 12/18/2006 12/22/2006 3
71151 IP Performance Indicator Verification 1
- ISFSI INSPECTIONS Other Routine 01/01/2007 08/01/2007 3
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1
711405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 01/22/2007 01/26/2007 3
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 1
DEV MEMO
- GROUND WATER CONTAMINATION/ DEV MEMO Other Routine 02/05/2007 02/09/2007 3
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Indian Point 3 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 09/01/2006 12:08:45 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 02/26/2007 03/02/2007 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 3
7112102 IP ALARA Planning and Controls 1
7111108P
- IP3 IN-SERVICE INSPECTION Baseline Inspections 03/12/2007 03/23/2007 3
7111108P IP Inservice Inspection Activities - PWR 1
71121
- OCC RAD SAFETY Baseline Inspections 03/26/2007 03/30/2007 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 3
7112102 IP ALARA Planning and Controls 1
TI-166
- CONTAINMENT SUMP MODIFICATIONS Safety Issues 04/02/2007 04/10/2007 3
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
3 7111111B
- L.O. REQUALIFICATION PROG+P/F REVIEW Baseline Inspections 07/09/2007 07/13/2007 3
7111111B IP Licensed Operator Requalification Program 1
7111405
- FOLLOWUP INSP FOR NEW ANS SYSTEM Other Routine 04/24/2007 04/26/2007 3
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 05/07/2007 05/11/2007 3
7112202 IP Radioactive Material Processing and Transportation 1
DEV MEMO
- GROUND WATER CONTAMINATION/ DEV MEMO Other Routine 05/14/2007 05/18/2007 3
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111107
- HEAT SINK INSP Baseline Inspections 07/16/2007 07/20/2007 3
7111107B IP Heat Sink Performance 1
71121
- OCC RAD SAFETY Baseline Inspections 07/16/2007 07/20/2007 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/16/2007 07/20/2007 3
7112102 IP ALARA Planning and Controls 1
71114
- EP PRGM INSP Baseline Inspections 09/17/2007 09/21/2007 3
7111402 IP Alert and Notification System Testing Baseline Inspections 09/17/2007 09/21/2007 3
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/17/2007 09/21/2007 3
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/17/2007 09/21/2007 3
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/17/2007 09/21/2007 3
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/17/2007 09/21/2007 3
71151-EP02 IP ERO Drill Participation Baseline Inspections 09/17/2007 09/21/2007 3
71151-EP03 IP Alert & Notification System 1
71121
- OCC RADIATION SAFETY Baseline Inspections 09/24/2007 09/28/2007 3
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 7
7111121
- CDBI Baseline Inspections 10/01/2007 10/05/2007 3
7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Indian Point 3 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 09/01/2006 12:08:45 Report 22 7
7111121
- CDBI Baseline Inspections 10/15/2007 10/19/2007 3
7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 3
7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 3
7111121 IP Component Design Bases Inspection 1
- MAINTENANCE RULE Baseline Inspections 12/10/2007 12/14/2007 3
7111112B IP Maintenance Effectiveness 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/28/2008 02/01/2008 3
7111105T IP Fire Protection [Triennial]
Baseline Inspections 02/11/2008 02/15/2008 3
7111105T IP Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.