UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND UNIT 1
Dear Mr. Crane:
On August 9, 2006, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
C. M. Crane 2
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No. 50-289 License No. DPR-50
Enclosure:
Three Mile Island, Unit 1 Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADEP
C. M. Crane 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP D. Kern, DRP, Senior Resident Inspector J. Brand, DRP, Resident Inspector TMI Resident OA B. Sosa, RI OEDO R. Laufer, NRR F. Saba, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
Region I Docket Room (with concurrences)
SUNSI Review Complete: ____RRB_______ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\TMI 2006 Mid-Cycle Letter.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/06 8/29/06 OFFICIAL RECORD COPY
Three Mile Island 1 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:45:53 Report 22 3
MODS
- MODS AND 50.59 Baseline Inspections 07/24/2006 07/28/2006 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 07/24/2006 07/28/2006 1
7111117B IP Permanent Plant Modifications 2
71114
- EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/17/2006 07/21/2006 1
7111402 IP Alert and Notification System Testing Baseline Inspections 07/17/2006 07/21/2006 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/17/2006 07/21/2006 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/17/2006 07/21/2006 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/17/2006 07/21/2006 1
71151 IP Performance Indicator Verification 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 08/28/2006 09/01/2006 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2
TI-169
- MSPI VERIFICATION Safety Issues 09/01/2006 11/15/2006 1
2515/169 IP Mitigating Systems Performance Index Verification 1
71121
- OCC RAD PROT Baseline Inspections 11/06/2006 11/10/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/06/2006 11/10/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/06/2006 11/10/2006 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/06/2006 11/10/2006 1
71151 IP Performance Indicator Verification 7
7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 01/08/2007 01/12/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 01/22/2007 01/26/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 1
7111121 IP Component Design Bases Inspection 5
7111111B
- L.O. REQUAL. PROG. + P/F REVIEW Baseline Inspections 02/19/2007 02/23/2007 1
7111111B IP Licensed Operator Requalification Program Baseline Inspections 02/26/2007 03/02/2007 1
7111111B IP Licensed Operator Requalification Program 1
7111112
- MAINTENANCE RULE INSP Baseline Inspections 02/26/2007 03/02/2007 1
7111112B IP Maintenance Effectiveness 3
4/23+EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 03/26/2007 03/30/2007 1
U01603 TMI INITIAL EXAM (6/07)
Not Applicable 04/23/2007 05/04/2007 1
U01603 TMI INITIAL EXAM (6/07) 1 71121
- OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Three Mile Island 1 Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:45:53 Report 22 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 04/16/2007 04/20/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 04/16/2007 04/20/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/16/2007 04/20/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 04/16/2007 04/20/2007 1
71151-EP03 IP Alert & Notification System 1
7112201
- PUB RAD PROT - RETS Baseline Inspections 05/14/2007 05/18/2007 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 08/20/2007 08/24/2007 1
7112202 IP Radioactive Material Processing and Transportation 1
71121
- OCC RAD SAFETY Baseline Inspections 10/01/2007 10/05/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111108P
- IN-SERVICE INSPECTION Baseline Inspections 10/30/2007 11/02/2007 1
7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 11/13/2007 11/16/2007 1
7111108P IP Inservice Inspection Activities - PWR 2
7111107
- HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1
7111107B IP Heat Sink Performance 1
71121
- OCC RAD SAFETY Baseline Inspections 11/05/2007 11/09/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
TI-166
- CONTAINMENT SUMP MODIFICATIONS Safety Issues 11/12/2007 11/19/2007 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 71121
- OCC RAD SAFETY Baseline Inspections 12/03/2007 12/07/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/03/2007 12/07/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 12/03/2007 12/07/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/03/2007 12/07/2007 1
71151 IP Performance Indicator Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 03/03/2008 03/09/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/03/2008 03/09/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/03/2008 03/09/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4
- PI&R Baseline Inspections 03/31/2008 04/04/2008 1
71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.