L-06-106, Supplemental Information Regarding an Application for Order Approving Indirect Transfer of Control of Licenses

From kanterella
(Redirected from ML061650288)
Jump to navigation Jump to search

Supplemental Information Regarding an Application for Order Approving Indirect Transfer of Control of Licenses
ML061650288
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 06/09/2006
From: Leidich G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3276, L-06-106, PY-CEI/NRR-2974L, TAC MD2182, TAC MD2183, TAC MD2184, TAC MD2185
Download: ML061650288 (4)


Text

FENOC 76 South Main Street

SAkron, Ohio 44308 FirstEnergy Nuclear Operating Company Gary R. Leidich 330-384-5770 President and Chief Nuclear Officer Fax: 330-384-5669 June 9, 2006 L-06-106 Serial Number 3276 PY-CEI/NRR-2974L 10 CFR 50.80 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Re:

Beaver Valley Power Station, Unit Nos. 1 & 2, Docket Nos. 50-334 & 50-412 Davis-Besse Nuclear Power Station, Unit No. 1, Docket No. 50-346 Perry Nuclear Power Plant, Unit No. 1, Docket No. 50-440 Supplemental Information Regarding an Application for Order Approvinq Indirect Transfer of Control of Licenses (TAC Nos. MD2182, MD2183, MD2184, MD2185)

On June 6, 2006, the FirstEnergy Nuclear Operating Company ("FENOC"), acting as agent for and on behalf of FirstEnergy Nuclear Generation Corp. ("FENGenCo") and FirstEnergy Solutions Corp. ("FE Solutions"), submitted a request to the Nuclear Regulatory Commission

("NRC") for consent to the indirect transfer of control of FENGenCo from a first-tier subsidiary of FirstEnergy Corp. ("FirstEnergy") to a subsidiary, FE Solutions.

The ownership percentage for Beaver Valley Power Station, Unit No. 2 was inadvertently listed as 60.8% instead of 60.08%. This submittal is being made to correct that value.

The FENGenCo corrected ownership percentages are as follows:

1. 100% of Beaver Valley Power Station, Unit No. 1;
2. 60.08% of Beaver Valley Power Station, Unit No. 2;
3. 100% of Davis-Besse Nuclear Power Station, Unit No. 1;
4. 87.42% of Perry Nuclear Power Plant, Unit No. 1.

There are no regulatory commitments included in this letter or its attachments (refer to ). If there are any questions or If additional information is required, please contact Mr. Gregory A. Dunn, Manager - Fleet Licensing, at (330) 315-7243.

Sincerely, Attachments:

1. Affirmation of Gary R. Leidich
2. Regulatory Commitments ADDI

June 9, 2006 L-06-106 Serial Number 3276 PY-CEI/NRR-2974L Page 2 of 2 cc:

Director, NRR NRC Region I Administrator NRC Region 3 Administrator Beaver Valley NRC Project Manager Davis-Besse NRC Project Manager Perry NRC Project Manager Beaver Valley NRC Senior Resident Inspector Davis-Besse NRC Senior Resident Inspector Perry NRC Senior Resident Inspector D.A. Allard, Director BRP/DEP L.E. Ryan, BRP/DEP N. Dragani, Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Review Board L-06-106 Serial Number 3276 PY-CEI/NRR-2974L Page 1 of I Affirmation I, Gary R. Leidich, being duly sworn, state that I am the President and Chief Nuclear Officer for FirstEnergy Nuclear Operating Company ("FENOC"), that I am authorized to sign and file this application with the Nuclear Regulatory Commission on behalf of FENOC and its affiliates, and that the statements made and the matters set forth herein pertaining to FENOC and its affiliates are true and correct to the best of my knowledge, information, and belief.

FirstEnergy Nuclear Operating Company STATE OF "A nsulfl5 /

COUNTY OF ry R. Leid~h sident and Chief Nuclear Officer COMMONWEALT'h OF PENNSYLVANIA Notaft Sed Mailnn Spanik, Notary Pii~ILo

&Wngwt or, Beavr Cmnty My Can n Expires May 14, 20MO Member, Pennsylvania Association of Notaries Subscribed and swoqg J before me, a Notary Public, in and for the County and State above named, this Y/"*q day of, My Commission Expires:

141-d609 NV L-06-106 Serial Number 3276 PY-CEI/NRR-2974L Page 1 of I Regulatory Commitments The following list identifies those actions committed to by the FirstEnergy Nuclear Operating Company (FENOC) for the Beaver Valley Power Station, Unit Nos. 1 & 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 in this document.

Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not regulatory commitments.

Please notify Mr. Gregory A. Dunn, Manager - FENOC, Fleet Licensing, at (330) 315-7243 for any questions regarding this document or associated regulatory commitments.

Commitment Due Date No commitments have been generated by this N/A submittal.