Summary of Annual Assessment Meeting with Firstenergy (Beaver Valley Station) with Attendee List and Licensee Slides
ML061370431
Person / Time
Site: Beaver Valley
Issue date: 05/10/2006
From: Ronald Bellamy
NRC/RGN-I/DRP/PB7
To:
FirstEnergy Nuclear Operating Co
References
Download: ML061370431 (10)


Text

May 10, 2006 MEETING

SUMMARY

LICENSEE:

FIRSTENERGY NUCLEAR OPERATING COMPANY FACl LITY:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MARCH 28,2006, ANNUAL ASSESSMENT MEETING WITH FIRSTENERGY On March 28,2006, at 1:00 p.m., an Annual Assessment Meeting was conducted at the Beaver Valley Power Station Training Building in Shippingport, PA, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The NRC requested the meeting with FENOC management to discuss NRC's assessment of the safety performance of the Beaver Valley Power Station, Units 1 and 2, for calendar year 2005.

The NRC presented and discussed its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period between January 1 through December 31,2005. The NRC presentation included background on the Reactor Oversight Process (ROP), summary of national performance assessment results, an overview of Beaver Valley Units 1 and 2's performance during calendar year 2005, and a discussion of general NRC issues. As part of this regulatory performance meeting, FENOC presented an overview of their performance(Attachment 2).

NRC's assessment letter can be found in ADAMS with an Accession Number of ML060620158.

This meeting notice with the enclosed agenda can be located in ADAMS with an Accession Number of ML060660509. The NRC slides for the meeting can be accessed with the Accession Number ML060680441. ADAMS is accessible for the NRC Web Site at http://www.nrc.qov/readinu-rm/adams. html.

The public observed this meeting and was offered the opportunity to communicate with the NRC regarding FENOC's performance at Beaver Valley Power Station and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and FENOC, the NRC offered to answer questions from the public.

Sincerely, Ronald R. Bellamy, PhD, Chief Projects Branch 7 Division of Reactor Projects

Enclosures:

1. Meeting Attendees
2. FENOC Presentation Slides

Meeting Attendees Name Dr. Ronald Bellamy Paul Cataldo Roy Fuhrmeister Galen Smith Benjamin Parks Ken Husk Mary Husk Jim Lash Rick Mende Larry Freeland Mack Manolears Rob Klindworth Doug Reeves Rich Bologna Dan Schwer Stan Baker Ralph Hansen Todd Schweider Ray Lieb Ed Hubley Roy Brosi Dan Craine Bill Kanda Dawn Laitres Fred Frey Title/Orqanization Chief, Projects Branch 7/USNRC RI Senior Resident Inspector/USNRC RI Senior Project Engineer/USNRC RI Resident InspectoriUSNRC RI USNRC/NRR Raccoon TWP EMA Raccoon TWP EMA Site Vice PresidentlFENOC Plant Manager/FENOC Performance ImprovementlFENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC DZNPS Enclosure

MRC Annual Assessment Meetinq - Beaver Valley Power Station March 28,2006

pe ra t i o n a I Pe rfo rma n ce II Plant Safety and Security

- Safety Culture / Safety Co~lscious Work

- Security

- Human Performance Environment

TI (D

0 i!

D 3

0 (D

3 CD 3

3.

- m TI 3

e UJ

0) 0 0

0 3

1

- m t - t (D

m II 0

S

ajor Licensing Initiatives Approved License Amendments:

- Replacement Steam Generator

- Containment Conversion

- Best Estimate LOCA Methodology Extended Power Uprate

OC Strategies II Safe Plant Operations II Reliable Plant Operations Cost-Effective Plant Operations Processes & Procedures II Effective use of People,

2 OFFICE NAME DATE Distribution:

R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP P. Cataldo, DRP, SRI G. Smith, DRP, RI P. Garrett, DRP, OA Rl/DRP R1 /DRP I

I ARosebrook o a y RBellamy fJ/ddk2, 0 5 / I D / 0 6 05/ 13 / 0 6 DOCUMENT NAME: G:\\DRP\\BRANCH7\\ROP Assessment Folders\\ROP-G\\ROPG BV AA Meeting Summary.wpd