Other: BVY 06-076, License Renewal Application, Amendment 8, BVY 06-079, License Renewal Application, Amendment 11, BVY 06-083, License Renewal Application, Amendment 12, BVY 06-096, License Renewal Application, Amendment No. 17, BVY 06-097, License Renewal Application, Amendment 19, BVY 06-098, License Renewal Application, Amendment 20, BVY 07-009, License Renewal Application, Amendment 24, BVY 07-018, License Renewal Application, Amendment 26, BVY 07-034, License Renewal Application Annual Update, BVY 07-047, License Renewal Application, Amendment 27, Submitted on January 25, 2006, BVY 07-058, License Renewal Application, Amendment 29, BVY 07-062, License Renewal Application, Amendment 30, BVY 07-066, License Renewal Application, Amendment 31, BVY 08-016, (PA-LR) Emailing Bvy 08-016 Final SER Review Comments, BVY 10-069, License Renewal Application Annual Update Information, BVY-06-083, License Renewal Application, Amendment 12, ML060950195, ML060950215, ML060950218, ML060950220, ML060950224, ML060950235, ML060950250, ML060950258, ML060950262, ML060950269, ML060950271, ML060950277, ML060950279, ML060950284, ML060950290, ML060950301, ML060950311, ML060950323, ML060950328, ML060950331, ML060950347, ML060950351, ML060950356, ML060950364, ML060950370, ML060950372, ML060950375, ML060950540, ML060950549, ML060950559, ML060950567, ML060950570, ML060950573, ML060950579... further results
|
MONTHYEARML0609503511998-02-28028 February 1998 GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506342006-03-22022 March 2006 GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506102006-03-22022 March 2006 GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505732006-03-22022 March 2006 GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505672006-03-22022 March 2006 GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) Project stage: Other ML0610000782006-03-22022 March 2006 GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503752006-03-22022 March 2006 GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503722006-03-22022 March 2006 GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Project stage: Other ML0609503312006-03-22022 March 2006 GALL AMP: XI.M10, Boric Acid Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502712006-03-22022 March 2006 GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections Iwb, Iwc, and Iwd (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609502692006-03-22022 March 2006 GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP) Project stage: Other ML0610000902006-03-22022 March 2006 GALL AMP: XI.M39, Lubricating Oil Analysis Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503012006-03-22022 March 2006 GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503112006-03-22022 March 2006 GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503232006-03-22022 March 2006 GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP) Project stage: Other ML0610000962006-03-22022 March 2006 GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001012006-03-22022 March 2006 GALL AMP: XI.S2, ASME Section XI, Subsection Iwl (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001262006-03-22022 March 2006 GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001342006-03-22022 March 2006 GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001382006-03-22022 March 2006 GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001432006-03-22022 March 2006 GALL AMP: XI.S7, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001472006-03-22022 March 2006 GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0609501952006-03-22022 March 2006 GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP) Project stage: Other ML0609502182006-03-22022 March 2006 GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503702006-03-22022 March 2006 GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502622006-03-22022 March 2006 GALL AMP: XI.E5, Fuse Holder (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001162006-03-22022 March 2006 GALL AMP: XI.S3, ASME Section XI, Subsection Iwf (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503282006-03-22022 March 2006 GALL AMP: XI.M9, BWR Vessels Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502842006-03-22022 March 2006 GALL AMP: XI.M4, BWR Vessel Id Attachment Welds (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506452006-03-22022 March 2006 GALL AMP: XI.M37, Flux Thimble Tube Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506372006-03-22022 March 2006 GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506322006-03-22022 March 2006 GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506292006-03-22022 March 2006 GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506202006-03-22022 March 2006 GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502792006-03-22022 March 2006 GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505962006-03-22022 March 2006 GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505872006-03-22022 March 2006 GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505792006-03-22022 March 2006 GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502582006-03-22022 March 2006 GALL AMP: XI.E4, Metal Enclosed Bus (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502352006-03-22022 March 2006 GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) Project stage: Other 1998-02-28
[Table View] |
Text
XI.S5 Masonry Wall Program 1
AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________
LRA AMP: __________________________
REVIEWER: ______________________
GALL AMP: XI.S5, Masonry Wall Program DATE: __________________________
Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. Nuclear Regulatory Commission (NRC) IE Bulletin (IEB) 80-11, "Masonry Wall Design," and NRC Information Notice (IN) 87-67, "Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-11," constitute an acceptable basis for a masonry wall aging management program (AMP). IEB 80-11 required the identification of masonry walls in close proximity to, or having attachments from, safety-related systems or components, and the evaluation of design adequacy and construction practice. NRC IN 87-67 recommended plant-specific condition monitoring of masonry walls and administrative controls to ensure that the evaluation basis developed in response to NRC IEB 80-11 is not invalidated by (1) deterioration of the masonry walls (e.g., new cracks not considered in the reevaluation), (2) physical plant changes such as installation of new safety-related systems or components in close proximity to masonry walls, or (3) reclassification of systems or components from non-safety-related to safety-related.
Important elements in the evaluation of many masonry walls during the NRC IEB 80-11 program included (1) installation of steel edge supports to provide a sound technical basis for boundary conditions used in seismic analysis and (2) installation of steel bracing to ensure containment of unreinforced masonry walls during a seismic event. Consequently, in addition to the Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.S5 Masonry Wall Program 2
Program Element Auditable GALL Criteria Documentation of Audit Finding development of cracks in the masonry walls, loss of function of the structural steel supports and bracing would also invalidate the evaluation basis.
B. The objective of the masonry wall program is to manage aging effects so that the evaluation basis established for each masonry wall within the scope of license renewal remains valid through the period of extended operation. Since the issuance of NRC IEB 80-11 and NRC IN 87-67, the NRC promulgated 10 CFR 50.65, the Maintenance Rule. Masonry walls may be inspected as part of the Structures Monitoring Program (XI.S6) conducted for the Maintenance Rule, provided the ten attributes described below are incorporated.
The attributes of an acceptable Masonry Wall Program are described below.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 1. Scope of Program A. The scope includes all masonry walls identified as performing intended functions in accordance with 10 CFR 54.4.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment
- 2. Preventive Actions A. No specific preventive actions are required.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 3. Parameters Monitored/
Inspected A. The primary parameter monitored is wall cracking that could potentially invalidate the evaluation basis.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.S5 Masonry Wall Program 3
Program Element Auditable GALL Criteria Documentation of Audit Finding
- 4. Detection of Aging Effects A. Visual examination of the masonry walls by qualified inspection personnel is sufficient. The frequency of inspection is selected to ensure there is no loss of intended function between inspections. The inspection frequency may vary from wall to wall, depending on the significance of cracking in the evaluation basis. Unreinforced masonry walls, which have not been contained by bracing, warrant the most frequent inspection, because the development of cracks may invalidate the existing evaluation basis.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 5. Monitoring and Trending A. Trending is not required. Monitoring is achieved by periodic examination for cracking.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 6. Acceptance Criteria A. For each masonry wall, the extent of observed cracking of masonry and degradation of steel edge supports and bracing is not to invalidate the evaluation basis. Corrective actions are taken if the extent of cracking and steel degradation is sufficient to invalidate the evaluation basis. An option is to develop a new evaluation basis that accounts for the degraded condition of the wall (i.e., acceptance by further evaluation).
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 7. Corrective Actions A. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 8.
Confirmation Process A. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.S5 Masonry Wall Program 4
Program Element Auditable GALL Criteria Documentation of Audit Finding
- 9.
Administrative Controls A. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the administrative controls.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
- 10. Operating Experience A. Since 1980, masonry walls that perform an intended function have been systematically identified through licensee programs in response to NRC IEB 80-11, USI A-46, and 10 CFR 50.48.
NRC IN 87-67 documented lessons learned from the NRC IEB 80-11 program, and provided recommendations for administrative controls and periodic inspection to ensure that the evaluation basis for each safety-significant masonry wall is maintained. Whether conducted as a stand-alone program or as part of structures monitoring for MR, a masonry wall AMP that incorporates the recommendations delineated in NRC IN 87-67 should ensure that the intended functions of all masonry walls within the scope of license renewal are maintained for the period of extended operation.
Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.S5 Masonry Wall Program 5
EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #)
- 1.
- 2.
ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #)
- 1.
- 2.
DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number)
Title Revision and/or Date
- 1.
- 2.
- 3.
- 4.
.