ML060060018
| ML060060018 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/03/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| References | |
| TAC MC6257 | |
| Download: ML060060018 (1) | |
Text
MGENCY CORE COOLING SYSTEMS TRISQpU 2SPHATEIISP LIMITNG CONDIMON FOR OPERATION 3.5.5 The TSP baskets shall contain 282 ft3 of active TSP.
AppAlIABLMD MODES 1, 2, and3 AMTON:
With the quantity of TSP less than required, restore the TSP quantity within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or f
be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQURMESNTS 4.5.5.1 Verify that the TSP baskets contain 282 t3 of TSP at least once per 18 months.
4.5.52 Verify that a sample from the TSP baskets provides adequate pH adjustment of borated water at least once per 18 months.
MILLSTONE -UNIT 2 3J4 5-9 Amendment No. 245, 290