ML052980418
| ML052980418 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/14/2005 |
| From: | Saccone R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005975 | |
| Download: ML052980418 (6) | |
Text
%I I
I mm,---
I, P I 1J%
TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone @ pplweb.com October 14,2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQIUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005975 The September 2005 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly youns, Ro.
A. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Brice Bickett NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/12/2005 J. J. Hennings (570) 542-3747 1.
2.
3.
4.
OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (Ul)
Reporting Period:
September 2005 Design Electrical Rating (Net MWe):
1177 Maximum Dependable Capacity (Net MWe):
1135 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
811,755 Yr.-to-Date 6551.0 6551.0 6551.0 0
7,415,344 Cumulative 195,624.0 164,539.0 162,151.0 0
168,055,786 NOTES:
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date:
10/12/05 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/12/05 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susquehanna Steam Electric Station (U2)
- 6.
Reporting Period:
September 2005
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 720 720 720 0
808,866 Yr.-to-Date 6,551 5,782.9 5,691.8 0
6,326,902 Cumulative 180,864 158,462.7 156,384.5 0
165,142,042 Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/12/05 J. J. Hennings (570) 542-3747 REPORT MONTH September 2005 Cause & Corrective Action to Prevent Recurrence No reactor shutdowns this month.
Summary: The only power change greater than 20% this month was on 9/9/05. Power was reduced to 75% for a control rod sequence exchange and condenser waterbox cleaning. 100% power was achieved 9/11/05.
1.
2.
3.
F. Forced S. Scheduled Reason:
A -Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of I
- i.
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
10/12//O5 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safetv Relief Valves None.