ML052980418

From kanterella
Jump to navigation Jump to search
September 2005 Monthly Operating Report for Susquehanna
ML052980418
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/14/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005975
Download: ML052980418 (6)


Text

%I I

I mm,---

I, P I 1J%

TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone @ pplweb.com October 14,2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQIUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005975 The September 2005 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly youns, Ro.

A. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Brice Bickett NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/12/2005 J. J. Hennings (570) 542-3747 1.

2.

3.

4.

OPERATING STATUS Unit Name:

Susquehanna Steam Electric Station (Ul)

Reporting Period:

September 2005 Design Electrical Rating (Net MWe):

1177 Maximum Dependable Capacity (Net MWe):

1135 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720 720 720 0

811,755 Yr.-to-Date 6551.0 6551.0 6551.0 0

7,415,344 Cumulative 195,624.0 164,539.0 162,151.0 0

168,055,786 NOTES:

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Date:

10/12/05 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/12/05 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susquehanna Steam Electric Station (U2)

6.

Reporting Period:

September 2005

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 720 720 720 0

808,866 Yr.-to-Date 6,551 5,782.9 5,691.8 0

6,326,902 Cumulative 180,864 158,462.7 156,384.5 0

165,142,042 Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/12/05 J. J. Hennings (570) 542-3747 REPORT MONTH September 2005 Cause & Corrective Action to Prevent Recurrence No reactor shutdowns this month.

Summary: The only power change greater than 20% this month was on 9/9/05. Power was reduced to 75% for a control rod sequence exchange and condenser waterbox cleaning. 100% power was achieved 9/11/05.

1.

2.

3.

F. Forced S. Scheduled Reason:

A -Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of I

i.

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

10/12//O5 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safetv Relief Valves None.