September 2005 Monthly Operating Report for St Lucie Units 1 and 2
ML052920410
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/14/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-221
Download: ML052920410 (3)


Text

I FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 October 14, 2005 L-2005-221 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the September 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William Jefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment

_Fief 2

an FPL Group company

L-2005-221 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

50-335 UNIT NAME St. Lucie 1 DATE October 12, 2005 COMPLETED BY K. R. Boller TELEPHONE 772 467-7465 REPORTING PERIOD:

September 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 604,615.00 Yr-to-Date 6,551.00 6,551.00 0.00 5,563,758.00 Cumulative 207,679.12 205,780.85 0.00 168,989,000.0 -

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Unit I operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

L-2005-221 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-389 St. Lucie 2 October 12,2005 K. R. boiler 772 467-7465 September 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 595,766.00 Yr-to-Date 5,549.77 5,488.87 0.00 4,522,444.00 Cumulative 169,687.99 167,671.74 0.00 138,350,854.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments

SUMMARY

Unit 2 operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)