RN-05-015, Firstenergy Nuclear Operating Station
ML051220330
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/2005
From: Nolan M
NRC/OE
To:
FirstEnergy Nuclear Operating Co
Starkey D
References
EA-04-231, EA-04-232 RN-05-015
Download: ML051220330 (2)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION May 2, 2005 RN-05-015 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT REGULATORY ACTION Licensee:

FirstEnergy Nuclear Operating Company EA-04-231 and EA-04-232 Davis-Besse Nuclear Power Station Docket No. 50-346

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that one White Significance Determination Process finding will be issued on or about May 5, 2005, to FirstEnergy Nuclear Operating Company (FENOC) as a result of inspections at the Davis-Besse Nuclear Power Station. This White finding, an issue of low to moderate safety significance, which may require additional NRC inspections, involved the licensees failure to implement a risk significant planning standard (RSPS). Specifically, the finding concerned the loss of capability to activate 49 Emergency Planning Zone (EPZ) sirens, between April 27 and May 7, 2004.

A Notice of Violation is included based on a violation of 10 CFR Part 50.54(q), which requires, in part, that a licensee shall follow and maintain in effect emergency plans which meet the standards in Section 50.47(b). FENOC failed to provide a means for early notification and clear instruction to the populace within the plume exposure pathway EPZ, as required by Section 50.47(b), when it lost the capability to activate the 49 EPZ sirens. In accordance with the NRC Enforcement Policy, the Notice of Violation is considered an escalated enforcement action because it is associated with a White finding.

It should be noted that the licensee has not been specifically informed of the regulatory action.

The schedule of issuance and notification is:

Mailing of Final Significance Determination May 5, 2005 Telephone Notification of Licensee May 5, 2005 The State of Ohio will be informed.

Contacts: D. Starkey, OE, 301-415-3456 C. Nolan, OE, 301-415-3360

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution:

OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield Comm. Lyons Comm. Jaczko SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR NSIR OI SP TWFN OCFO OP CENTER NMSS OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS File Name: E:\\Filenet\\ML051220330.wpd ADAMS: ML051220330 OE:ES OE:C DStarkey CNolan 05/2/05 05/2/05