March 4, 2005 LICENSEE:
Constellation Energy FACILITY:
R.E. Ginna Nuclear Power Plant
SUBJECT:
SUMMARY
OF FEBRUARY 3, 2005, MEETING WITH CONSTELLATION ENERGY REGARDING PROPOSED EXTENDED POWER UPRATE FOR GINNA (TAC NO. MC4033)
On February 3, 2005, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the licensee for the R.E. Ginna Nuclear Power Plant (Ginna) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to exchange information with the NRC regarding their proposed extended power uprate (EPU) for Ginna. A formal license amendment request is scheduled to be submitted to the NRC for approval in June of 2005. A list of attendees is provided as Enclosure 1.
The licensee presented information (see Enclosure 2) that included: Safety analysis methodologies including benchmarking of RETRAN to LOFTRAN and RETRAN qualifications for water solid conditions, and the format and level of detail expected in the EPU submittal. The licensee also provided information on several licensing action requests to be submitted in advance of the EPU submittal including use of best-estimate loss-of-coolant accident analysis methodologies, and modifications to the main feedwater isolation valve and resulting changes to the containment analysis.
Members of the public were not in attendance. Public meeting feedback forms were not received.
Please direct any inquiries to Donna Skay at 301-415-1322, or DMS6@nrc.gov.
/RA/
Donna Skay, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page
LICENSEE:
Constellation Energy FACILITY:
R.E. Ginna Nuclear Power Plant
SUBJECT:
SUMMARY
OF FEBRUARY 3, 2005, MEETING WITH CONSTELLATION ENERGY REGARDING PROPOSED EXTENDED POWER UPRATE FOR GINNA (TAC NO. MC4033)
On February 3, 2005, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the licensee for the R.E. Ginna Nuclear Power Plant (Ginna) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to exchange information with the NRC regarding their proposed extended power uprate (EPU) for Ginna. A formal license amendment request is scheduled to be submitted to the NRC for approval in June of 2005. A list of attendees is provided as Attachment 1.
The licensee presented information (see Enclosure 2) that included: Safety analysis methodologies including benchmarking of RETRAN to LOFTRAN and RETRAN qualifications for water solid conditions, and the format and level of detail expected in the EPU submittal. The licensee also provided information on several licensing action requests to be submitted in advance of the EPU submittal including use of best-estimate loss-of-coolant accident analysis methodologies, and modifications to the main feedwater isolation valve and resulting changes to the containment analysis.
Members of the public were not in attendance. Public meeting feedback forms were not received.
Please direct any inquiries to Donna Skay at 301-415-1322, or DMS6@nrc.gov.
/RA/
Donna Skay, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244 Attachments: 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page DISTRIBUTION PUBLIC PDI-1 R/F ACRS/ACNW SLittle DSkay RLaufer JStang RLobel CHolden TMarsh/JLyons GMatakas, RI LWard OGC JTatum CLiang SMiranda Accession No.: ML050450080 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME DSkay SLittle RLaufer DATE 2/25/05 2/24/05 2/25/05 OFFICIAL RECORD COPY
R.E. Ginna Nuclear Power Plant cc:
Mr. Michael J. Wallace President R.E. Ginna Nuclear Power Plant, LLC c/o Constellation Energy 750 East Pratt Street Baltimore, MD 21202 Mr. John M. Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Kenneth Kolaczyk, Sr. Resident Inspector R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 James M. Petro, r., Esquire Counsel Constellation Energy 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Daniel F. Stenger Ballard Spahr Andrews & Ingersoll, LLP 601 13th Street, N.W., Suite 1000 South Washington, DC 20005 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 1190 Scottsville Road, Suite 200 Rochester, NY 14624 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mrs. Mary G. Korsnick Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 MEETING BETWEEN NRC AND CONSTELLATION ENERGY GROUP (CEG)
ATTENDANCE LIST FEBRUARY 3, 2005 NRC D. Skay, NRR J. Stang, NRR R. Lobel, NRR R. Laufer, NRR J. Tatum, NRR S. Miranda, NRR C. Liang, NRR INDUSTRY M. Finley, CEG D. Wilson, CEG S. Snider, Westinghouse C. McHugh,Westinghouse D. Ohkawa, Westinghouse J. Kobelak, Westinghouse C. Frepoli, Westinghouse D. Sklarsky, Westinghouse G. Wrobel, CEG