Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and 2) Extended Power Uprate
ML043370307
Person / Time
Site: Beaver Valley
Issue date: 12/02/2004
From: Colburn T
NRC/NRR/DLPM/LPD1
To: Richard Laufer
NRC/NRR/DLPM/LPD1
Colburn T, NRR/DLPM, 415-1402
References
TAC MC4645, TAC MC4646
Download: ML043370307 (5)


Text

December 2, 2004 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation (NRR)

FROM:

Timothy G. Colburn, Senior Project Manager, Section 1

/RA/

Project Directorate I Division of Licensing Project Management, NRR

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL., REGARDING BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2)

EXTENDED POWER UPRATE (TAC NOS. MC4645 AND MC4646)

DATE & TIME:

Wednesday, December 15, 2004 9:00 a.m. to 1:00 p.m.

LOCATION:

Westinghouse Electric Company Washington Operations Office 12300 Twinbrook Parkway Suite 330 Rockville, Maryland PURPOSE:

A working-level meeting to discuss FENOCs extended power uprate application dated October 4, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML042920300).

CATEGORY 1:*

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

CONTACT: Timothy G. Colburn, NRR 301-415-1402 tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS:

NRC/NRR FENOC Westinghouse Stone & Webster N. Patel M. Testa J. DeBlasio S. Ferguson J. Hayes K. Frederick R. Surman T. Colburn T. Madden G. Galletti N. Hanley S. Miranda C. Custer C. Liang C. Ciocca I. Ahmed F. Schaffner G. Makur S. Sarver M. Rock H. Hegrat J. Meadoff G. Halnon P. Patniak R. Wolfgang K. Martin J. Bongarra L. Fields J. Tatum S. Laur R. Lobel, et al.

The meeting agenda is attached, and is located in the Agency-wide Documents Access Management System (ADAMS) at Accession Number ML043370307.

Docket Nos. 50-334 and 50-412

Attachment:

Meeting Agenda cc: See next page

ML043370307 NRC-001 OFFICE PDI-1/PM PDI-2/LA PDI-1/SC NAME TColburn MOBrien RLaufer DATE 12/2/04 12/2/04 12/2/04

MEETING AGENDA DECEMBER 15, 2004, CATEGORY 1 WORKING-LEVEL MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

EXTENDED POWER UPRATE (EPU)

FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 9:00 - 9:15 a.m.

Introductory Remarks/Introductions 9:15 - 11:15 a.m.

Overview/Topics Listed Below Licensing Basis 2900 MWt Staged Power Escalation Power Ascension Testing Full Implementation of Alternative Source Term Unit 1 Replacement Steam Generators Containment Metal Mass Treatment of Industry EPU Request for NRC Review Matrix (Enclosure 3 to October 4, 2004, application)

Additional Information Reviewer Aid CD Updated Final Safety Analysis Report Supporting Licensing Action Requests (LARs) to NRC Review Matrix Links Containment Conversion Plant Modifications Best Estimate Loss-of-Coolant Accident Safety-Related Interrelationship of Pending LARs Nonsafety-Related NRC Approval Date Non-EPU changes Amendment Implementation Negative Rate Trip P-7 to P-9 Boran Injection Tank Technical Specification Changes Administrative Changes Advisory Committee Reactor Safeguards Review Amendment Issuance Sequence 11:15 - 11:30 Break 11:30 - 1:00 p.m.

Breakout Sessions Specific Discussions Group 1 Group 2 Reactor Systems Plant Systems Electrical Fire Protection Environmental Group 3 Group 4 Mechanical Operator Licensing Materials Human Performance Plant Support Group 5 Dose/Containment Equipment Qualification Probability Risk Assessment/Probability Safety Assessment Attachment

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077