ML042950522

From kanterella
Jump to navigation Jump to search
September 2004 Monthly Operating Report for Susquehanna Units 1 & 2
ML042950522
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/13/2004
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005829
Download: ML042950522 (7)


Text

% I Ia*If am--

4, TM Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@ pplweb.com October 13,2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Dockei Nos. 50-397/NPF-14 and 50-388/NPF-22 PLA-005829 The September 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours,

?4e6 Richarl. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman

, OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/13/2004 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

Suspuehanna Steam Electric Station (UP)

Reporting Period:

September 2004 Design Electrical Rating (Net MWe):

1177*

Maximum Dependable Capacity (Net MWe):

1135*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720 720 720 0

807,882 Yr.-to-Date 6575 5294.2 5244.4 0

5,680,239 Cumulative 186,864 155,779.0 153,484.0 0

158,293,677 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of 1

I :

I UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/13/2004 J. J. Hennings (570) 542-3747 REPORT MONTH September 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month Summary: The only significant power reduction this month was down to 68% power on 9/10/04 for a Control Rod Sequence Exchange. 100% power was achieved on 9/13/04.

1.

F. Forced S. Scheduled

2.

3.

Reason:

Method:

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

10/13/04 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/13/04 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susguehanna Steam Electric Station (U2)

6. Reporting Period:

September 2004

7.

Design Electrical Rating (Net MWe):

1182

8. Maximum Dependable Capacity (Net MWe):

1140 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720 720 720 0

814,938 Yr.-to-Date 6,575 6,575 6,575 0

7,525,737 Cumulative 172,104

.150,470.8

.148,483.6 0O 156,283,748 NOTES:

Page 1 of I

T I IO UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/13/04 J. J. Hennings (570) 542-3747 REPORT MONTH September 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 1<'3 X

No shutdowns this month.

Summary: The only power reduction greater than 20% this month, was down to 68% power on 9/17/04 for a planned Control Rod Sequence Exchange. 100% power was achieved on 9/19/04.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 -Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by: J. J. Hennings Date:

10/13/2004 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.