Text
FPL OCT 1 3 2004 L-2004-226 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, vla*
Terry OJoh(es Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 10/06/2004 Ronald Everett (305) 246-6190 Reporting Period September. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 4
Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 614.1 6469.1 209002.3 No. of hours generator was on line (service hours) 614.1 6396.7 206537.2 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 416568 4463145 135267790 UNIT SHUTDOWNS No.
Date Type Duration I Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2) 20040019 9/26/04 S
105.9 C
1 REFUELING (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TrainingfLicense Examination F -Administrative G -Operational Error (Explain)
H -Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summarv Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of September, 2004, until the unit was shutdown for a scheduled refueling outage on September 26, 2004. Unit 3 was ramped down and manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 10/06/2004 Ronald Everett (305) 246-6190 Reporting Period September, 2004 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
_-i--;
Month Year-to-date Cumulative No. of hours reactor was critical 720 6533.9 205953.7 No. of hours generator was on line (service hours) 720 6480.5 201458.9 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 504329 4523750 133045318 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)
Summary Of Monthly Operatincg Experience Unit 4 operated at essentially 100% power for the month of September, 2004