October 8, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT - SEPTEMBER MONTHLY OPERATING REPORT The enclosure provides the September Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.
If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
Sincerely, Original signed by:
P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
MONTHLY OPERATING REPORT SEPTEMBER 2004 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
OPERATING DATA REPORT 50-327 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
Sequoyah 1 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6. Net Electrical Energy Generated (MWHrs)
Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours October 01, 2004 September 2004 720.00 6,481.20 138,469.65 720.00 6,459.58 136,444.16 831,094.00 7,504,946.00 149,140,164.0 0.00 0.00 0.00 1,160.00 1,148.00 Renee McKaig (423) 843-8963 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)
Type F: Forced S: Scheduled Date No.
SUMMARY
- Unit 1 gross maximum dependable capacity factor was 100.47 for the month of September 2004.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)
Page 1
OPERATING DATA REPORT 50-328 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
Sequoyah 2 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6. Net Electrical Energy Generated (MWHrs)
Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours October 01, 2004 September 2004 720.00 6,186.95 142,911.18 720.00 6,144.38 140,644.34 813,118.00 6,943,464.00 150,925,835.0 0.00 0.00 0.00 1,160.00 1,124.00 Renee McKaig (423) 843-8963 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)
Type F: Forced S: Scheduled Date No.
SUMMARY
- Unit 2 gross maximum dependable capacity factor was 100.34 for the month of September 2004.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)
Page 2