August 30, 2004 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BEAVER VALLEY POWER STATION
Dear Mr. Pearce:
On August 5, 2004, the NRC staff completed its mid-cycle plant performance review of the Beaver Valley Power Station, Units 1 and 2 (Beaver Valley). The mid-cycle review for Beaver Valley involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Proprietary Information in accordance with 10 CFR 2.390(d)(1)" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2006.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2006. The plan contains an inspection using Temporary Instruction (TI) 2515/159 Review of Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment. This TI is in response to the Davis-Besse Reactor Vessel Head Degradation Lessons-Learned Task Force and is being performed at a sampling of nuclear power plants across the country. The inspection plan is provided to minimize the resource impact on your staff, and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document
Mr. William Pearce 2
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5234 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Peter W. Eselgroth, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.
05000334, 05000412 License Nos.
Enclosure:
Beaver Valley Power Station, Units 1 and 2 Inspection/Activity Plan cc w/encl:
J. Lash, Plant General Manager R. Mende, Director, Nuclear Work Management T. Cosgrove, Director, Nuclear Engineering/Projects L. Freeland, Manager, Nuclear Regulatory Affairs/Performance Improvement M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia R. Chiodo, Beaver County Emergency Management Agency
Mr. William Pearce 3
Distribution w/encl:
S. Collins, RA J. Wiggins, DRA A. Blough, DRP W. Lanning, DRS B. Holian, DRP P. Eselgroth, DRP R. Barkley, DRP P. Cataldo, DRP - Senior Resident Inspector C. Miller, OEDO R. Laufer, NRR R. Guzman, NRR T. Colburn, PM, NRR P. Garret - DRP, Resident OA R. Crlenjak, Deputy Director, DRS J. White, DRS, RSSB R. Lorson, DRS, PEB J. Rogge, DRS, EB L. Doerflein, DRS, SEB R. Conte, DRS, OSB P. Kaufman, DRS J. McFadden, DRS G. Smith, DRS D. Silk, DRS K. Gallagher, DRS, OA C. ODaniell, DRP, OA RidsNrrDipmlipb Region I Docket Room (with concurrences)
DOCUMENT NAME: S:\\ROP5 Mid-Cycle Review\\2004 Mid-Cycle Letters\\BV ROP5 Mid-Cycle Letter FINAL.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME JHernandez/JEH PEselgroth/PWE DATE 08/30/04 08/30/04 OFFICIAL RECORD COPY
Beaver Valley Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 10:31:30 Report 22 4
7111111B
- LO REQUALIFICATION INSPECTION U1 Baseline Inspections 07/26/2004 07/30/2004 Licensed Operator Requalification Program IP 7111111B 1
3 TI-159
- DAVIS BESSE ACTION ITEM-GL89-13 REVIEW Safety Issues 10/04/2004 10/08/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related Equipment IP 2515/159 1, 2 1
7112103
- OCC RAD SAFETY - INSTRUMENTATION Baseline Inspections 10/04/2004 10/08/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 1
7111112B
- MAINTENANCE RULE Baseline Inspections 10/04/2004 10/10/2004 Maintenance Effectiveness IP 7111112B 1, 2 2
7111108P
- INSERVICE INSPECTION Safety Issues 10/18/2004 10/22/2004 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02)
Safety Issues 10/18/2004 10/22/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 11/01/2004 11/05/2004 ALARA Planning and Controls IP 7112102 1, 2 4
2/28+EXM
- UNIT 1 OPERATOR LICENSING INITIAL EXAM Not Applicable 01/16/2005 01/20/2005 BEAVER VALLEY, UNIT 1 INITIAL EXAM (12/1/04)
U01542 1
Not Applicable 02/28/2005 03/11/2005 BEAVER VALLEY, UNIT 1 INITIAL EXAM (12/1/04)
U01542 1
4 2/28+EXM
- UNIT2 OPERATOR LICENSING INITIAL EXAMS Not Applicable 01/17/2005 01/21/2005 BEAVER VALLEY, UNIT 2 INITIAL EXAM (12/1/04)
U01534 2
Not Applicable 02/28/2005 03/11/2005 BEAVER VALLEY, UNIT 2 INITIAL EXAM (12/1/04)
U01534 2
1 71114
- EP PROGRAM AND EP PI INSPECTION Baseline Inspections 02/07/2005 02/11/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 02/07/2005 02/11/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 02/07/2005 02/11/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 02/07/2005 02/11/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 02/07/2005 02/11/2005 Performance Indicator Verification IP 71151 1, 2 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 02/14/2005 02/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1
7111108P
- INSERVICE INSPECTION - U2 Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102 2
3 7111117B
- MODS & 50.59 Baseline Inspections 06/20/2005 06/24/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Beaver Valley Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 10:31:30 Report 22 1
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 08/22/2005 08/26/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 1
71002
- LICENSE RENEWAL - SCOPING License Renewal Inspectio 10/03/2005 10/07/2005 License Renewal Inspection IP 71002 1, 2 2
7111111B
- LO REQUAL PROGRAM INSPECTION Baseline Inspections 10/31/2005 11/04/2005 Licensed Operator Requalification Program IP 7111111B 2
1 71002
- LICENSE RENEWAL - AGING MGMT License Renewal Inspectio 11/14/2005 11/18/2005 License Renewal Inspection IP 71002 1, 2 License Renewal Inspectio 11/28/2005 12/02/2005 License Renewal Inspection IP 71002 1, 2 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 03/13/2006 03/17/2006 ALARA Planning and Controls IP 7112102 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.