RAI, Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan
ML042110182
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/23/2004
From: Chernoff M
NRC/NRR/DLPM
To: James A
Entergy Operations
Chernoff, M H, NRR/DLPM, 301-415-4041
References
TAC MC2963
Download: ML042110182 (4)


Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties July 23, 2004 Mr. Andre James Security Manager Entergy Operations, Inc.

River Bend Station, Unit 1 5485 U.S. Highway 61 St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: PHYSICAL SECURITY PLAN, SECTION 9.4.1 AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2963)

Dear Mr. James:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for River Bend Station, Unit 1.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301)415-1952.

Sincerely,

/RA/

Margaret Chernoff, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

As stated cc w/o encl: See next page NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.

July 23, 2004 Mr. Andre James Security Manager Entergy Operations, Inc.

River Bend Station, Unit 1 5485 U.S. Highway 61 St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: PHYSICAL SECURITY PLAN, SECTION 9.4.1 AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2963)

Dear Mr. James:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for River Bend Station, Unit 1.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301)415-1952.

Sincerely,

/RA/

Margaret Chernoff, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS M. Webb R. Gramm H. Berkow A. Howell, RIV ADAMS Accession Number: ML042110182 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME MChernoff CHawes JPeralta JNakoski DATE 7/23/04 7/20/04 7/23/04 7/23/04 OFFICIAL RECORD COPY

River Bend Station cc:

Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775