ML041740616
| ML041740616 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/10/2004 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML041740616 (2) | |
Text
Joseph A. Widay Vice President Always at Your Service and Plant Manager June 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for May 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May 2004.
Very truly yours, a- -
ptsh. Widayltz an Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com An Energy East Company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 June 04, 2004 John V. Walden (585) 771-3588 May 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 368,968.00 Yr-to-Date 3,647.00 3,647.00 0.00 1,810,150.00 Cumulative 250,645.22 247,432.70 8.50 113,007,651.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of May. Average power for the month was 99.7%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1