May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant
ML041740616
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/10/2004
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML041740616 (2)


Text

Joseph A. Widay Vice President Always at Your Service and Plant Manager June 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for May 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May 2004.

Very truly yours, a- -

ptsh. Widayltz an Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com An Energy East Company

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 June 04, 2004 John V. Walden (585) 771-3588 May 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 470.00 480.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 368,968.00 Yr-to-Date 3,647.00 3,647.00 0.00 1,810,150.00 Cumulative 250,645.22 247,432.70 8.50 113,007,651.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of May. Average power for the month was 99.7%.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1