February 2004 Monthly Operating Report for Seabrook
ML040840519
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/15/2004
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-04026
Download: ML040840519 (3)


Text

FPL Energy FPL Energy Seabrook Station Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 MAR 15 2004 Docket No. 50-443 NYN-04026 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station February 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-02. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of February, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector ILS

i OPERATING DATA REPORT DOCKET NO.

50443 UNIT Seabrook I DATE March 1, 2004 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS

1. Unit Name:

Seabrook Station Unit 1

2.

Reporting Period:

FEBRUARY 2004

3. Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5. Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 696.0 1440.0 104269.8

8. Hours Generator On-Line 696.0 1440.0 101354.3
9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 805677 1666949 114121280 OPERATING

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.20% based on the MDC value of 1155.3 Net MWe.

I of2

t, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNIT Seabrook I DATE March 1, 2004 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 MONTH: FEBRUARY 2004 NO.

DATE TYPE' DURATION REASON' METHOD OF SHUTTING CAUSE (CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 3 COMMENTS No entries for this month.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative 0 - Operational Error (Explain)

H - Other (Explain) 2of2