MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam Safety Valves (MSSVsJ LCO 3.7.1 The MSSVs shall be OPERABLE as specified in Table 3.7.1-1 and Table 3.7.1-2.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
_I NOTE------------------------------------
separat~-~ond;;ion-e~~~~-~~-~~~~~~d for each MSSV.
__________________________l__________l__-------------------------------------
CONDITION RIEQUIRED ACTION A.
One or more steam generators with one MSSV inoperable and the Moderator Temperature Coefficient (MTC) zero or negative at all power levels.
A.1 Reduce THERMAL POWER to
< 50 % RTP.
HBRSEP Unit No. 2 3.7-l COMPLETION TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)
Amendment No. 196
MSSVs 3.7.1 CONDITION B.
One or more steam generators with two or more MSSVs inoperable.
OR One or more steam generators with one MSSV inoperable and MTC positive at any power level.
C.
Required Action and associated Completion Time not met.
OR One or more steam generators with
= 3 MSSVs inoperable.
REQUIRED ACTION B.l B.2 Reduce THERMAL POWER to less than or equal to the Maximum Allowable
% RTP specified in Table 3.7.1-1 for the number of OPERABLE MSSVs.
......... NOTE........
Only required in MODE 1 Reduce the Power Range Neutron Flux High reactor trip setpoint to less than or equal to the Maximum Allowable RTP specified in Table 3.7.1-1 for the number of OPERABLE MSSVs.
c-1 Be in MODE 3.
AND c.2 Be in MODE 4.
COMPLETION TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 72 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours HBRSEP Unit No. 2 3.7-2 Amendment No. 176
MSSVs 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1
&ly.required to beN~~~;,r,,~.;,.Moo;S.;..
and 2.
Verify each required MSSV lift setpoint per In accordance Table 3.7.1-2 in accordance with the with the Inservice Testing Program.
Following Inservice
- testing, lift setting shall be within 21%.
Testing Program HBRSEP Unit No. 2 3.7-3 Amendment No. 176
MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)
OPERABLE Main Steam Safety Valves versus Maximum Allowable Power NUMBER OF OPERABLE MSSVs MAXIMUM ALLOWABLE POWER PER STEAM GENERATOR
(% RTP) 3 2
= 46
= 24 HBRSEP Unit No. 2 3.7-4 Amendment No. 176
MSSVs 3.7.1 Table 3.7.1.2 (page 1 of 1)
Main Steam Safety Valve Lift Settings VALVE NUMBER STEAM GENERATOR-1 L~~i~E~~~~
C SVl-1A SVl-1B SVl-1c 1085 SVl-2A SVl-2B SVl-2c 1110 SVl-3A SVl-3B SVl-3c 1125 SVl-4A SVl-4B SVl-4c 1140 HBRSEP Unit No. 2 3.7-5 Amendment No. 176
MSIVs 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Main Steam Isolation Valves (MSIVs)
LCO 3.7.2 Three MSIVs shall be OPERABLE.
APPLICABILITY:
MODE 1, MODES 2 and 3 except when all MSIVs are closed.
ACTIONS CONDITION A.
One MSIV inoperable in A.1 Restore MSIV to MODE 1.
OPERABLE status.
B.
Required Action and associated Completion Time of Condition A
not met.
C.
.........N()TE.........
Separate Condition entry is allowed for each MSIV.
One or more MSIVs inoperable in MODE 2 or 3.
f1EQUIRED ACTION B.l Be in MODE 2.
c.1 Close MSIV.
c.2 Verify MSIV is closed.
HBRSEP Unit No. 2 3.7-6 COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6 hours
.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Once per 7 days (continued)
Amendment No. 176
MSIVs 3.7.2 f
ACTIONS (continued)
CONDITION D.
Required Action and associated Completion Time of Condition C
not met.
REQUIRED ACTION D.l Be in MODE 3.
AND D.2 Be in MODE 4.
COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 and 2.
Verify closure time of each MSIV is
= 5 seconds on an actual or simulated actuation signal.
In accordance with the I nservice Testing Program HBRSEP Unit No. 2 3.7-7 Amendment No. 176
MFIVs, MFRVs, and Bypass Valves 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Main Feedwater Isolation Valves (MFIVs),
Main Feedwater Regulation Valves (MFRVs). and Bypass Valves LCO 3.7.3 Three MFIVs. three MFRVs, and three bypass valves shall be OPERABLE.
APPLICABILITY:
MODES 1. 2, and 3 except when MFIV. MFRV, or bypass valve is closed or isolated by a closed manual valve.
ACTIONS
....................__I______________
NOTE.....................................
Separate Condition entry is allowed for each valve.
CONDITION R.EQUIRED ACTION A.
One or more MFIVs inoperable.
A.1 Close or isolate MFIV.
A.2 Verify MFIV is closed or isolated.
B.
One or more MFRVs inoperable.
B.l Close or isolate MFRV.
AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 8.2 Verify MFRV is closed Once per or isolated.
7 days HBRSEP Unit No. 2 3.7-8 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Once per 7 days (continued)
Amendment No. 176
MFIVs, MFRVs, and Bypass Valves 3.7.3 ACTIONS (continued)
CONDITION C.
One or more bypass valves inoperable.
D Two valves in the same flow path inoperable.
E.
Required Action and associated Completion Time not met.
SURVEILLANCE REQUIREMENTS REQUIRED ACTION C.l Close or isolate bypass valve.
C.2 Verify bypass valve is closed or isolated.
D.l Isolate affected flow path.
E.l Be in MODE 3.
E.2 Be in MODE 4.
COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Once per 7 days 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFRV and bypass valve is < 20 seconds on an actual or simulated actuation signal.
In accordance with the Inservice Testing Program SR 3.7.3.2 Verify the closure time of each MFIV is
< 50 seconds on an actual or simulated actuation signal.
In accordance with the Inservice Testing Program HBRSEP Unit No. 2 3.7-9 Amendment No. 196
AFW System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Auxiliary Feedwater (AFW) System LCO 3.7.4 Four AFW flow paths and three AFW pumps shall be OPERABLE.
...........................N(-jTE.........................
Only one AFW flow path with one motor driven pump is required to be OPERABLE in MODE 4.
APPLICABILITY:
MODES 1. 2, and 3, MODE 4 when steam generator is being used for heat removal.
ACTIONS CONDITION REQUIRED ACTION A.
One AFW pump inoperable in MODE 1,
- 2. or 3.
OR One or two AFW flow paths inoperable in MODE 1, 2. or 3.
B.
Two motor driven AFW pumps inoperable in MODE 1, 2, or 3.
OR Three motor driven AFW flow paths inoperable in MODE 1, 2. or 3.
A.1 Restore AFW pump or flow path(s) to OPERABLE status.
B-1 Restore one motor driven AFW pump or one flow path to OPERABLE status.
HBRSEP Unit No. 2 3.7-10 COMPLETION TIME 7 days 8 days from discovery of failure to meet the LCO 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 days from discovery of failure to meet the LCO (continued)
Amendment No. 176
AFW System 3.7.4 CONDITION C.
Required Action and associated Completion Time for Condition A
or B not met.
D.
Steam driven AFW pump or flow path inoperable in MODE 1,
- 2. or 3.
One motor driven AFW pump or flow path inoperable in MODE 1, 2, or 3.
E.
Four AFW flow paths inoperable in MODE 1,
- 2. or 3.
OR Three AFW pumps inoperable in MODE 1, 2, or 3.
F.
Required AFW pump and flow path inoperable in MODE 4.
REQUIRED ACTION c.1 13e in MODE 3.
fiNJ c.2 13e in MODE 4.
D-1 l3e in MODE 3.
AND D.2 l3e in MODE 4.
-E.l
,:co-i:,:;Ntll~-,;;
other LCO Required Actions requiring MODE changes are suspended until one AFW pump and flow path are restored to OPERABLE status.
Initiate action to restore one AFW pump and flow path to OPERABLE status.
F.l Initiate action to restore AFW pump and flow path to OPERABLE status.
COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 18 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 18 hours Immediately Immediately HBRSEP Unit No. 2 3.7-11 Amendment No. 176
AFW System 3.7.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify each AFW manual, power operated, and automatic valve in each water flow
- path, and in the steam supply flow path to the steam driven AFW pump, that is not locked,
- sealed, or otherwise secured in position, is in the correct position.
31 days SR 3.7.4.2 NOrE _____.____.________
Not required to be performed for the steam driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after 2 1000 psig in the steam generator.
Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required developed head.
31 days on a STAGGERED TEST BASIS SR 3.7.4.3
NOTE---------.---------.-
Not applicable in MODE 4 when steam generator is being used for heat removal.
Verify each AFW automatic valve that is not locked,
- sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
18 months HBRSEP Unit No. 2 3-7-12 (continued)
Amendment No. 176
AFW System 3.7.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
\\
---.---------------NOTES----.---------------
- 1.
Not required to be performed for the steam driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after
= 1000 psig in the steam generator.
- 2.
Not applicable in MODE 4 when steam generator is being used for heat removal.
Verify each AFW pump starts automatically on an actual or simulated actuation signal.
18 months SR 3.7.4.5
.-----------NOTE-------------------
Not required to be performed for the steam driven AFW pump until prior to entering MODE 1.
Verify proper alignment of the required AFW flow paths by verifying flow from the condensate storage tank to each steam generator.
Prior to entering MODE 2.
whenever unit has been in MODE 5 or 6 for
> 30 days SR 3.7.4.6 Verify the AFW automatic bus transfer switch associated with discharge valve V2-16A operates automatically on an actual or simulated actuation signal.
18 months HBRSEP Unit No. 2 3.7-13 Amendment No. 176
CST 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Condensate Storage Tank (CST)
LCO 3.7.5 The CST level shall be = 35.000 gal and the backup Service Water System (SWS) supply to the AFW system shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
MODE 4 when a steam generator is being used for heat removal.
ACTIONS CONDITION I
REQUIRED ACTION COMPLETION TIME A.
CST level not within lim it.
B.
Required Action and associated Completion Time not met.
A.1 Verify by administrative means
'OPERABILITY of backup Iwater supply.
A.2 IRestore CST level to within limit.
B.l I3e in MODE 3.
j4NJl B.2 I3e in MODE 4, without reliance on steam generator for heat removal.
HBRSEP Unit No. 2 3.7-14 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6 hours 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> (continued)
Amendment No. 176
CST 3.7.5 ACTIONS (Continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
SWS supply to AFW system inoperable.
c-1 IBe in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND c.2 IBe in MODE 4, without 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> reliance on steam generator for heat removal.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify the CST level is = 35,000 gal.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.7.5.2 Verify by administrative means OPERABILITY of backup SWS supply to the AFW System.
31 days HBRSEP Unit No. 2 3.7-15 Amendment No. 176
CCW System 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Component Cooling Water (CCW) System LCO 3.7.6 Two CCW trains powered from emergency power supplies shall be OPERABLE.
APPLICABILITY:
MODES 1. 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION A.
One required CCW train A.1
NOTE---------
Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4."
for residual heat removal loops made inoperable by CCW.
Restore required CCW train to OPERABLE status.
B.
Required Action and B.l Be in MODE 3.
associated Completion Time of Condition A
AND not met.
8.2 Be in MODE 5.
HBRSEP Unit No. 2 3.7-16 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Amendment No. 176
CCW System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1
.--.----NOTE--------------------
Isolation of CCW flow to individual components does not render the CCW System inoperable.
Verify each required CCW manual, power
- operated, and automatic valve in the flow path servicing safety related equipment, that is not locked,
- sealed, or otherwise secured in position, is in the correct position.
31 days SR 3.7.6.2 Verify each required CCW pump starts automatically on an actual or simulated LOP DG Start undervoltage signal.
18 months HBRSEP Unit No. 2 3.7-17 Amendment No.
186 I
SWS 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Service Water System (SWS)
LCO 317.7 Two SWS trains and the Turbine Building loop isolation valves shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3. and 4..
ACTIONS CONDITION A.
One SWS train inoperable.
B.
One Turbine Building loop isolation valve inoperable.
REQUIRED ACTION COMPLETION TIME A.1
---.----NOTES-------
iEnter applicable Conditions and IRequired Actions Iof LCO 3.8.1, "AC Sources-Operating,"
for emergency diesel generator made inoperable by SWS.
Restore SWS train to OPERABLE status.
B.l Close and deactivate inoperable Turbine 13uilding loop
,isolation valve.
B.2 Verify the inoperable Turbine Building loop isolation valve is closed and deactivated.
HBRSEP Unit No. 2 3.7-18 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours 31 days (continued)
Amendment No. 176
SWS 3.7.7 ACTIONS (continued1 CONDITION REQUIRED ACTION C.
Two Turbine Building C.l Close and deactivate loop isolation valves one inoperable Turbine inoperable.
Building loop isolation valve.
D.
Required Actions and D.l Be in MODE 3.
associated Completion Times of Conditions A.
ANJ B, or C not met.
D.2 Be in MODE 5.
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.7.1
.------------NOlrE------.-------------
Isolation of SWS flow to individual components does not render the SWS inoperable.
Verify each SWS manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not
- locked, sealed, or otherwise secured in
- position, is in the correct position.
SR 3.7.7.2 Verify each SWS automatic valve in the flow path that is not locked,
- sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FREQUENCY 31 days 18 months (continued)
HBRSEP Unit No. 2 3.7-19 Amendment No. 176
SWS 3.7.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.7.7.3 Verify each SWS pump and SWS booster pump 18 months starts automatically on an actual or simulated actuation signal.
SR 3.7.7.4 Verify the SWS automatic bus transfer 18 months switch associated with Turbine Building loop isolation valve V6-16C operates automatically on an actual or simulated actuation signal.
HBRSEP Unit No. 2 3.7-20 Amendment No. 176
HBRSEP Unit No. 2 3.7-21 Amendment No. 191 UHS 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Ultimate Heat Sink (UHS)
LCO 3.7.8 The UHS shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Service water temperature not within limit.
A.1 Verify required cooling capacity maintained.
AND A.2 Verify service water temperature is 99°F.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter Once per hour B. Required Action and associated Completion Time not met.
OR UHS inoperable for reasons other than Condition A.
B.1 Be in MODE 3.
AND B.2 Be in MODE 5.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify water level of UHS is $ 218 ft mean sea level.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
Surveillance Requirements (continued)
HBRSEP Unit No. 2 3.7-21a Amendment No. 191 UHS 3.7.8 SURVEILLANCE FREQUENCY SR 3.7.8.2 Verify service water temperature is # 97EF. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
CREFS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Emergency Filtration System (CREFS)
LCO 3.7.9 Two CREFS trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4 During movement of irradiated fuel assemblies.
ACTIONS CONDITION A.
One CREFS train inoperable.
B.
Required Action and associated Completion Time of Condition A
not met in MODE 1, 2, 3, or 4.
C.
Required Action and associated Completion Time of Condition A
not met during movement of irradiated fuel assemblies.
RE:QUIRED ACTION A.1 Restore CREFS train to OPERABLE status.
B.l Be in MODE 3.
AND B.2 Be in MODE 5.
c.1 Place OPERABLE CREFS train in emergency plressurization mode.
OR c.2 Sluspend movement of irradiated fuel xsemblies.
COMPLETION TIME 7 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Immedi ate1 y Immedi ate1 y (continued)
HBRSEP Unit 2
3.7-22 Amendment No. 3% 195
CREFS 3.7.9 ACTIONS (continued)
D.
Two CREFS trains inoperable during movement of irradiated fuel assemblies.
D.l Suspend movement of irradiated fuel assemblies.
E.
Two CREFS trains E.l Restore at least one inoperable in MODE 1, CREFS train to 2, 3, or 4.
OPERABLE status.
F.
Required Action and associated Completion Time of Condition E
not met in MODE 1, 2, 3, or 4.
F.l Be in MODE 3.
AND F.2 Be in MODE 5.
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CREFS train for 2 15 minutes.
SR 3.7.9.2 Perform required CREFS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.9.3 Verify each CREFS train actuates on an actual or simulated actuation signal.
SR 3.7.9.4 Verify one CREFS train can maintain a
positive pressure of 2 0.125 inches water
- gauge, relative to the outside atmosphere and a positive pressure relative to adjacent building areas during the emergency pressurization mode of operation at a makeup flow rate of 5 400 cfm.
FREQUENCY 31 days In accordance with VFTP 18 months 18 months on a STAGGERED TEST BASIS Immediately 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit 2
3.7-23 Amendment No. JJ6 195
HBRSEP Unit 2
Page is intentionally blank 3.7-24 CREFS 3.7.9 Amendment No. JX 195
CREATC 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Emergency Air Temperature Control (CREATC)
LCO 3.7.10 Two CREATC Water Cooled Condensing Unit (WCCU) trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4 During movement of irradiated fuel assemblies.
ACTIONS CONDITION A.
One CREATC WCCU train inoperable.
B.
Required Action and associated Completion Time of Condition A
not met in MODE 1, 2, 3, or 4.
REQUIRED ACTION A.1 Restore CREATC WCCU train to OPERABLE status.
B.l Be in MODE 3.
AND B.2 E;e in MODE 5.
COMPLETION TIME 30 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours (continued)
HBRSEP Unit No. 2 3.7-25 Amendment No. %?6 195
CREATC 3.7.10 ACTIONS (continued)
CONDITION C.
Required Action and associated Completion Time of Condition A
not met during movement of irradiated fuel assemblies.
D.
Two CREATC WCCU trains inoperable during movement of irradiated fuel assemblies.
E.
Two CREATC WCCU trains E.l Ftestore at least one inoperable in MODE 1, CREATC WCCU train to 2, 3, or 4.
QPERABLE status.
F.
Required Action and associated Completion Time of Condition E
not met in MODE 1, 2, 3, or 4.
RE:QUIRED ACTION c.1 Fllace OPERABLE CREATC WCCU train in operation.
OR c.2 Suspend movement of irradiated fuel assemblies.
D.l Suspend movement of irradiated fuel assemblies.
F.l Ele in MODE 3.
AND F.2 Ele in MODE 5.
COMPLETION TIME Immediately Immedi ate1 y Immedi ate1 y 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.7-26 Amendment No. %?6 195
CREATC 3.7.10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify each CREATC WKU train has the 18 months capability to remove the assumed heat load.
HBRSEP Unit No. 2 3.7-27 Amendment No. 176
FBACS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Fuel Building Air Cleanup System (FBACS)
LCO 3.7.11 The FBACS shall be QPERABLE and operating.
APPLICABILITY:
During movement of irradiated fuel assemblies in the fuel building.
ACTIONS CONDITION I
REQUIRED ACTION I COMPLETION TIME A.
The FBACS inoperable A.1 Suspend movement of Immediately during movement of irradiated fuel irradiated fuel assemblies in the assemblies in the fuel fuel building.
building.
L, SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Operate the FBACS for = 10 continuous hours 31 days with the heaters operating automatically.
SR 3.7.11.2 Perform required FBAC!; filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP:).
HBRSEP Unit No. 2 3.7-28 (continued1 Amendment No. 176
FBACS 3.7.11 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.7.11.3
~~~~~~~~~~~~~~~~_-~
NOTE-------------------
Not required to be met when the only movement of irradiated fuel is movement of the spent fuel shipping cask containing irradiated fuel.
Verify the FBACS can maintain a negative pressure with respect to atmospheric pressure.
18 months HBRSEP Unit No. 2 3.7-29 Amendment No. 176
Fuel Storage Pool Water Level 3.7.12 3.7 PLANT SYSTEMS 3.7.12 Fuel Storage Pool Water Level LCO 3.7.12 The fuel storage pool water level shall be 1 21 ft over the top of irradiated fuel assemblies seated in the storage racks.
APPLICABILITY:
During movement of irradiated fuel assemblies in the fuel storage pool.
ACTIONS CONDITION A.
Fuel storage pool water level not within limit.
REQUIRED ACTION A.1
NOTE---------
LCO 3.0.3 is not applicable.
Suspend movement of irradiated fuel assemblies in the fuel storage pool.
COMPLETION TIME Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.1 Verify the fuel storage pool water level is 2 21 ft above the top of the irradiated fuel assemblies seated in the storage racks.
7 days HNRSEP Unit No. 2 3.7-30 Amendment No. 176
Fuel Storage Pool Boron Concentration 3.7.13 HBRSEP Unit No. 2 3.7-31 Amendment No. 198 3.7 PLANT SYSTEMS 3.7.13 Fuel Storage Pool Boron Concentration LCO 3.7.13 The fuel storage pool boron concentration shall be
$ 1500 ppm.
APPLICABILITY:
At all times.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Fuel storage pool boron concentration not within limit.
NOTE-------------
LCO 3.0.3 is not applicable.
A.1 Suspend movement of fuel assemblies in the fuel storage pool.
AND A.2 Initiate action to restore fuel storage pool boron concentration to within limit.
Immediately Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.13.1 Verify the fuel storage pool boron concentration is within limit.
7 days
New and Spent Fuel Assembly S;o;ayf 3.7 PLANT SYSTEMS
,j 3.7.14 New and Spent Fuel Assembly Storage LCO 3.7.14 New and spent fuel shall be stored in approved locations.
APPLICABILITY:
Whenever any fuel assembly is stored in the new or spent fuel storage racks.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME 9
9 A.
Requirements of the LCO not met.
A.1
NOTE-.-------
LCO 3.0.3 is not applicable.
Initiate action to restore fuel storage to within requirements.
(
SURVEILLANCE REQUIREMENTS Immediately SURVEILLANCE I
FREQUENCY SR 3.7.14.1 Verify by administrative means that fuel assemblies are stored in approved locations.
Prior to storing the fuel assembly HBRSEP Unit No. 2 3.7-32 Amendment No. 176
Secondary Specific Ac;i;iE; 3.7 PLANT SYSTEMS 3.7.15 Secondary Specific Activity LCO 3.7.15 The specific activity of the secondary coolant shall be
= 0.10 pCi/gm DOSE EIQUIVALENT I-131.
APPLICABILITY:
MODES 1. 2. 3, and 4,.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Specific activity not A.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> within limit.
!vJ A.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.15.1 Verify the specific activity of the 31 days secondary coolant is :s 0.10 pCi/gm DOSE EQUIVALENT I-131.
HBRSEP Unit No. 2 3.7-33 Amendment No. 176