An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
- 585546-2700 www.rge.com March 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for February 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of February 2004.
Very truly yours, se A. Widay d Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
j i.,
I 4
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-244 Ginna I March 05,2004 J.
John V. Walden (585) 771-3588 REPORTING PERIOD:
February 2004
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 696.00 696.00 0.00 345,511.00 Yr-to-Date 1,440.00 1,440.00 0.00 714,489.00 Cumulative 248,438.22 245,225.70 8.50 1i 11,911,990.00 UNIT SHUTDOWNS No.
Type Method of Date F: Forced Duration Reason Shutting S: Scheduled (Hours)
Dw Cause & Corrective Action Comments
SUMMARY
- The unit remained at full power for the entire month of February. Average power for the month was 99.8%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3 Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of I