ML040690894
| ML040690894 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/09/2004 |
| From: | Luehman J NRC/OE |
| To: | |
| Dixon-Herrity, Jennifer | |
| References | |
| EA-04-020 EN-04-014 | |
| Download: ML040690894 (2) | |
Text
March 09, 2004 EN-04-014 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
FirstEnergy Nuclear Operating Company (EA-04-020)
Perry Nuclear Power Plant Docket Nos. 50-440
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around March 12, 2004, to FirstEnergy Nuclear Operating Company as a result of inspections at Perry Nuclear Power Plant. This White finding, an issue with low to moderate increased importance to safety, involved the air binding of the common low pressure core spray and residual heat removal (RHR) A water leg pump following the August 14, 2003, loss of offsite power event. The failure to establish adequate written procedures to periodically vent the highest point of the discharge of the common low pressure core spray and RHR A water leg pump is a violation of Technical Specification 5.4. Accordingly, a Notice of Violation associated with the White finding is being issued.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination March 12, 2004 Telephone Notification of Licensee March 12, 2004 The State of Ohio will be notified.
Contacts: J. Dixon-Herrity, OE, 415-1980 C. Nolan, OE, 415-3360
Distribution:
OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS NSIR OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS ML040690894 OFFICE OE-ES OE: DD NAME JDixon-Herrity JLuehman DATE 3/ /04 3/ /04