March 4, 2004 Mr. Joseph Solymossy Site General Manager Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
ANNUAL ASSESSMENT LETTER - PRAIRIE ISLAND NUCLEAR GENERATING PLANT (REPORT 50-282/04-01; 50-306/04-01)
Dear Mr. Solymossy:
On February 11, 2004, the NRC staff completed its end-of-cycle plant performance assessment of Prairie Island Nuclear Generating Plant. The end-of-cycle review for Prairie Island Nuclear Generating Plant involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Prairie Island Nuclear Generating Plant operated in a manner that preserved public health and safety. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2005.
The enclosed inspection plan details the inspections scheduled through September 30, 2005.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle review meeting. As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of Order implementation combined with newly developed portions of the security baseline inspection program.
J. Solymossy In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9600 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Patrick L. Louden, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Prairie Island Nuclear Generating Plant Inspection/Activity Plan See Attached Distribution
J. Solymossy In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9600 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Patrick L. Louden, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Prairie Island Nuclear Generating Plant Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\eoc 030404\\Pra EOC ltr 2004.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME FRamirez:co PLouden DATE 02/26/04 02/26/04 OFFICIAL RECORD COPY
J. Solymossy cc w/encl:
John Paul Cowan, Executive Vice President andChief Nuclear Officer Manager, Regulatory Affairs Jonathan Rogoff, Esquire, Vice President, Counsel & Secretary Nuclear Asset Manager Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota K. Kuhlmann, Council Administrator A. Kohnen, President, Prairie Island Community Center D. Albers, Goodhue County Sheriff G. Brown, Emergency Management Director R. Wilhelm, Chair, Pierce County Board of Directors W. Branning, Chair, Dakota County Board of Commissioners The Honorable V. Steffenhagen G. Fried, Emergency Management Director J. Bryant, Chair, Goodhue County Board of Commissioners E. Muhlhansen, Pierce County Sheriff D. Gudmundson, Dakota County Sheriff INPO
J. Solymossy ADAMS Distribution:
DFT DWW Project Director, NRR Project Manager, NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Prairie Island DRP III DRSIII PLB1 JRK1
Prairie Island Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2004 08:03:38 Report 22 1
- MAINTENANCE RULE BIENNIAL (DRS)
Baseline Inspections 03/01/2004 03/05/2004 Maintenance Effectiveness IP 7111112B 1, 2 2
FY 2004
- PRAIRIE ISLAND RETAKE EXAM 04/2004 Not Applicable 04/23/2004 04/30/2004 RETAKE OF INITIAL OL EXAMS - PRAIRIE ISLAND W90121 1
1 INSPECT
- REMP INSPECTION Baseline Inspections 04/26/2004 04/30/2004 Radiological Environmental Monitoring Program IP 7112203 1, 2 1
- ACCESS/ALARA Baseline Inspections 05/17/2004 05/21/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 05/17/2004 05/21/2004 ALARA Planning and Controls IP 7112102 1, 2 1
URI INSP
- URI FOR ISI ISSUE INSPECTION Baseline Inspections 06/07/2004 06/10/2004 Identification and Resolution of Problems IP 71152 1
1 71114
- BASELINE EP EXERCISE INSP Baseline Inspections 06/14/2004 06/18/2004 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 06/14/2004 06/18/2004 Performance Indicator Verification IP 71151 1, 2 2
SG BASE
- SG BASELINE 2004 Baseline Inspections 07/19/2004 07/23/2004 Access Authorization IP 7113001 1, 2 1
INSPECT
- GAS AND LIQUID EFFLUENTS Baseline Inspections 07/26/2004 07/30/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 2
ISI/TI 1
- INSERVICE INSP/SG REPL/TI-150/152 UNIT 1 Safety Issues 09/06/2004 10/15/2004 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 IP 2515/150 1
Safety Issues 09/06/2004 10/15/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)
Other Routine 09/06/2004 10/15/2004 Steam Generator Replacement Inspection IP 50001 1
Baseline Inspections 09/06/2004 10/15/2004 Inservice Inspection Activities - PWR IP 7111108P 1
1 INSPECT
- ACCESS CONTROL AND ALARA OUTAGE Baseline Inspections 09/20/2004 09/24/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/20/2004 09/24/2004 ALARA Planning and Controls IP 7112102 1, 2 4
MOD/5059
- MODIFICATIONS & 50.59 Baseline Inspections 11/01/2004 11/05/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 11/01/2004 11/05/2004 Permanent Plant Modifications IP 7111117B 1, 2 1
INSPECT
- ACCESS CONTROL AND ALARA Baseline Inspections 04/18/2005 04/22/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/18/2005 04/22/2005 ALARA Planning and Controls IP 7112102 1
2 ISI
- UNIT 2 ISI/RPV HEAD REPLACEMENT INSP Other Routine 04/25/2005 05/20/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Prairie Island Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2004 08:03:38 Report 22 2
- UNIT 2 ISI/RPV HEAD REPLACEMENT INSP Baseline Inspections 04/25/2005 05/20/2005 Inservice Inspection Activities - PWR IP 7111108P 2
6 SSDI
- SAFETY SYSTEM DESIGN INSPECTION Baseline Inspections 06/13/2005 07/01/2005 Safety System Design and Performance Capability IP 7111121 1, 2 1
71114
- BASELINE EP INSPECTION Baseline Inspections 06/06/2005 06/10/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 06/06/2005 06/10/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 06/06/2005 06/10/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 06/06/2005 06/10/2005 Performance Indicator Verification IP 71151 1, 2 3
FY 2005
- PRAIRIE ISLAND INIT PREP 07/2005 Not Applicable 07/11/2005 07/15/2005 OL - INITIAL EXAM - PRAIRIE ISLAND - JUL/AUG 2005 W90128 1
5 PI&R
- PROBLEM IDENTIFICATION & RESOLUTION INSP Baseline Inspections 07/18/2005 08/05/2005 Identification and Resolution of Problems IP 71152B 1, 2 1
INSPECT
- RAD INSTRUMENTATION Baseline Inspections 08/01/2005 08/05/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 3
FY 2005
- PRAIRIE ISLAND INIT EXAM 08/2005 Not Applicable 08/01/2005 08/12/2005 OL - INITIAL EXAM - PRAIRIE ISLAND - JUL/AUG 2005 W90128 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.