ML040630800

From kanterella
Jump to navigation Jump to search
Transmittal of Fitness-for-Duty Performance Data for Period Ending June 30, 2003
ML040630800
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/17/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040630800 (7)


Text

Committed to Nuclear Excellen Nuclear Management Company, LLC 10 CFR 26.71 (d)

February 17,2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 FITNESS FOR DUTY PERFORMANCE DATA In accordance with 10 CFR 26.71(d), Nuclear Management Company (NMC) hereby submits the Fitness For Duty (FFD) Program Performance Data for Duane Arnold Energy Center. This report covers the six-month period ending June 30, 2003.

If you have any questions, please contact Dan Kelley at (319) 851-7621.

Mark Peifer Site Vice President Nuclear Management Company, LLC Duane Arnold Energy Center attachments cc:

Regional Administrator-Ill, NRC NRR Project Managers, NRC Sr. Resident Inspector, NRC Nuclear Oversight Site Vice President 3313 DAEC Road. Palo, IA 52324-9646 Telephone: 319.851.7621

ATTACHMENT I NUCLEAR MANAGEMENT COMPANY, LLC Duane Arnold Energy Center Docket 50-331 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA 1 Page Follows

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Nuclear Management Company Company June 30, 2003 Six (6) Months Ending Duane Arnold Energy Center Location Dan Kelley (319) 851-7621 Contact Name Phone Number Cutoffs: Screen/Confirmation (ng/ml) & Alcohol (% BAC)

X Appendix A to 10CFR26 Levels Long -Term Short -Term Testing Results Licensee Employees Contractor personnel Contractor Personnel Average number with Unescorted Access 547 N/A 131

  1. 2#

Categories Tested Positive Tested Positive Tested Positive Pre-badging 7

0 50 2

For Cause 2

0 0

0 Post Accident 0

0 0

0 Random 186 0

15 0

Follow-up 4

0 3

0 Other 1

0 0

0 Total 200 0

68 0

ATTACHMENT 2 NUCLEAR MANAGEMENT COMPANY, LLC Duane Arnold Energy Center Docket 50-331 BREAKDOWN OF CONFIRMED POSITIVE TESTS 1 Page Follows

BREAKDOWN OF CONFIRMED POSITIVE TESTS Arphe-Phency-Refusal Duane Arnold Energy Marijuana Cocaine Opiates tamines clidine Alcohol to Test Center Licensee 0

0 0

0 00 0

Employees I

I I

I I

I Short -Term Contractors 2

0 0

0 0

0 0

Total J

2 0

f 0

0 J

0 0

0 2

Page I of 1

ATTACHMENT 3 NUCLEAR MANAGEMENT COMPANY, LLC Duane Arnold Energy Center Docket 50-331 FITNESS FOR DUTY

SUMMARY

1 Page Follows Page I of I

FITNESS FOR DUTY

SUMMARY

Management Actions

1.

During the six-month period ending December 31,2003 Duane Arnold Energy Center conducted 268 drug and alcohol tests in accordance with 10 CFR Part 26.

Duane Arnold Energy Center workers are subject to random drug and alcohol testing. Random drug testing rate for the six-month period ending December 31, 2003 was 29.65%. Testing rate for the year ending 2003 was 51.24%.

For the semi-annual reporting period ending December 31, 2002, two (2) contract workers were denied nuclear access after testing positive for drugs during pre-access testing.

Pre-Access Positives Two (2) contractor employees tested positive for marijuana.

These individuals were denied access to NMC nuclear facilities.

2.

For the semi-annual period referenced herein all blind specimens submitted to Duane Arnold Energy Center's HHS-certified laboratory yielded expected results.

3.

NMC has analyzed program performance data for the six-month period ending December 31, 2003, and has revised existing FFD procedures to incorporate enhancements as indicated by the analysis.

Reportable Events Duane Arnold Energy Center had no reportable events as defined in 10 CFR Part 26.73 (a) during this reporting period.

Page 1 of 1