ML033560356
| ML033560356 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/22/2003 |
| From: | Luehman J NRC/OE |
| To: | Entergy Operations |
| Dixon-Herrity J | |
| References | |
| EA-03-077 EN-03-053 | |
| Download: ML033560356 (1) | |
Text
December 22, 2003 EN-03-053 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
Entergy Operations, Inc. (EA-03-077)
River Bend Station Docket Nos. 50-458
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around December 29, 2003, to Entergy Operations, Inc. as a result of inspections at the River Bend Station. This White finding, an issue with low to moderate increased importance to safety, involved the failure to properly lock open condensate prefilter vessel bypass flow control Valve CNM-FCV200 resulting in a loss of feed water flow to the reactor on September 18, 2002, when the valve unexpectedly closed following a reactor scram. The failure to properly lock open the valve is a violation of Technical Specification 5.4.1.a. Accordingly, a Notice of Violation associated with the White finding is being issued.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination December 29, 2003 Telephone Notification of Licensee December 29, 2003 The State of Louisiana will be notified.
Contacts: J. Dixon-Herrity, OE, 415-1980 J. Luehman, OE, 415-2741 Distribution:
OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS NSIR OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS ADAMS Accession No. ML033560356 C:\\ORPCheckout\\FileNET\\ML033560356.wpd OFFICE OE-ES OE NAME JDixon-Herrity RPedersen DATE 12/22/03 12/22/03