December 24, 2003 LICENSEE:
FirstEnergy Nuclear Operating Company (FENOC)
FACILITY:
Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2)
SUBJECT:
SUMMARY
OF DECEMBER 10, 2003, CATEGORY 1 MEETING WITH FENOC TO DISCUSS THE LICENSEES PRE-APPLICATION CONTAINMENT CONVERSION REPORT FOR BVPS-1 AND 2 DATED NOVEMBER 24, 2003 On December 10, 2003, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of FENOC, the licensee for BVPS-1 and 2 at NRC Headquarters, One White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to conduct a pre-application discussion of the licensees November 24, 2003, Containment Conversion Report for BVPS-1and 2 (Agencywide Documents Access and Management System, accession number ML033350145), in advance of the licensees formal license amendment application which is expected during the first quarter of 2004 for conversion of the containments from sub-atmospheric to atmospheric conditions.
FENOC presented information on its Modular Accident Analysis Program - Design-Basis Analysis (MAAP-DBA) computer code methodology for modeling containment performance during design-basis events. It included benchmarking of the MAAP-DBA code against other NRC-approved computer codes such as GOTHIC and NOTRUMP (including comparisons of separate effects experiments and intergral containment effects experiments). It also provided information on the limiting cases found during the licensees application of the MAAP-DBA code.
The licensee concluded that peak pressure would remain less than the current design rating for all events of interest following containment atmosphere conversion. The licensee further concluded that the benchmarking of MAAP-DBA methodology to GOTHIC and NOTRUMP computer codes yielded comparable results.
The meeting concluded with the licensee identifying the end of the first quarter 2004 as the target date for its formal containment conversion application, and a verbal commitment to provide the NRC staff with a copy of the MAAP-DBA computer deck for independent confirmatory calculations if needed.
One member of the public was in attendance, representing the State of Pennsylvania.
CONTACT: T. Colburn, NRR 301-415-1402
FirstEnergy Nuclear Operating Company Attachment 1 is a list of the meeting attendees, and Attachment 2 is a copy of the licensees slides presented at the meeting. No Public Meeting Feedback Forms (NRC Form 659) were returned by any attendees to the meeting.
Please direct any inquiries to Timothy G. Colburn, Senior Project Manager, at 301-415-1402.
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 Attachments: 1. List of Attendees
- 2. FENOC Handouts at December 10, 2003, Meeting With NRC cc w/atts: See next page
ML033530080 OFFICE PDI-1/PM PDI-2/LA SPSB/LTR PDI-1/SC NAME TColburn MOBrien RLobel RLaufer DATE 12/22/03 12/22/03 12/22/03 12/22/03
LIST OF ATTENDEES PRE-APPLICATION REVIEW MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING MODIFICATIONS TO THE MAAP5 COMPUTER CODE TO SUPPORT THE BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2, CONVERSION FROM SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENTS DECEMBER 10, 2003, 9:00-12:00, O-13-B-4 NAME ORGANIZATION
- 1. Timothy G. Colburn NRC/NRR/DLPM/PDI-1
- 2. Richard Lobel NRC/NRR/SPSB
- 3. Edward Throm NRC/NRR/SPSB
- 4. Allen Notafrancesco NRC/RES/DSARE
- 5. Kenneth Frederick FENOC
- 6. Mike Testa FENOC
- 7. Bill Rinkacs Westinghouse
- 8. Brian Sepelak FENOC
- 9. Herb Brinkman FENOC
- 10. Bob Hammersley Fauske
- 11. Larry Ryan Pennsylvania Bureau of Radiation Protection
FENOC HANDOUTS AT DECEMBER 10, 2003 MEETING WITH NRC
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Deparment of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)
Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077