October 2003 Monthly Operating Report for Kewaunee
ML033180112
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/05/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-110
Download: ML033180112 (3)


Text

Committed to Nuclear Excelle5,

Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-1 10 10 CFR 50.36 November 5, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for October 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

7 /

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC MLA Enclosure cc:

Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

" -I-,



OPERATING DATA REPORT DOCKET NO.

5S UNIT NAME K

DATE N

COMPLETED BY IV TELEPHONE (9

REPORTING PERIOD D-305

.ewaunee lovembei 5, 2003 lary Anderson 020) 388-8453 October, 2003 Notes:

Unit continues to operate at 100% power.

1.

2.

DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 544 526 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY (IIM\\I)

MONTH ITAR.TO.DATE CUMULAIVE 745.0 6461.0 219955.7 745.0 6429.8 217723.1 0.0 0.0 10.0 402479 3371280 109013511

U i S UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee November 5, 2003 Mary Anderson (920) 388-8453 REPORTING PERIOD October, 2003 METHOD OF NO.

DATE Type DURATION REASON2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)

DOWN REACTOR3 Performance of SP54-086, Turbine Stop and 2

10/4/03 S

10.73 B

N/A Governor Valve Operability Test, and Heater Drain Pump A&B maintenance.

(1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9 - Other

SUMMARY

The unit continues to operate at 100% steady state power