September 2, 2003 LICENSEE:
TXU Generating Company LP FACILITY:
Comanche Peak Steam Electric Station, Units 1 & 2
SUBJECT:
SUMMARY
OF A MEETING HELD ON AUGUST 19, 2003, TO DISCUSS A MARCH 18, 2003, APPLICATION FOR LICENSE AMENDMENT CONCERNING THE SUSPENSION OF LOCAL LEAK-RATE TESTING FOR CERTAIN CONTAINMENT ISOLATION VALVES (TAC NOS. MB8185 AND MB8186)
On August 19, 2003, representatives of the U.S. Nuclear Regulatory Commission (NRC) staff and TXU Generating Company LP (the licensee) met in Room O-9B2 of the NRCs offices located at 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensees March 18, 2003, application for license amendment which would allow the licensee to suspend local leak-rate testing (LLRT) of certain residual heat removal (RHR) and containment spray (CS) system containment isolation valves at the Comanche Peak Steam Electric Station (CPSES), Units 1 & 2. A list of attendees is provided as Enclosure 1.
The NRC staff informed the licensee that a preliminary review of the March 18, 2003, application indicated that, based on available information, the suspension of LLRT of the subject valves was unacceptable. The purpose of the meeting, requested by the licensee, was for the licensee to bring to the attention of the NRC staff any additional factors not raised by the application, which might influence the NRC staffs conclusions. The summary information presented by the licensee is provided as Enclosure 2.
The licensee indicated that the need to perform the subject LLRTs was largely the result of a problem with valve stem leakage which has since been resolved. Testing with water is a difficult evolution which occasionally results in the need to suspend testing, drain the piping and repeat the test using the air leakage method. Moreover, especially with regard to the RHR valves, LLRT is nonconservative in that it results in substantial dose to workers and potential loss of shutdown cooling for testing of valves which have not historically been responsible for significant leakage. CPSES is the only facility, among a number of similar facilities surveyed by Westinghouse which is required to perform the subject LLRTs. From a barrier standpoint, the licensee views the subject isolation valves as components in sealed systems; even gross leakage past the valves would not result in release of radioactive material due to the elimination of valve stem leakage and the Radioactive System Leakage Inspection (RSLI) program. The licensee provided the NRC staff with RHR and CS RSLI procedures which are included as.
At the conclusion of the meeting, the NRC staff committed to consider information presented during the meeting, and the August 14, 2003, supplement, in reaching a final conclusion with regard to the licensees March 18, 2003, application for license amendment.
/RA/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: 50-445 and 50-446
Enclosures:
As stated cc w/encls: See next page At the conclusion of the meeting, the NRC staff committed to consider information presented during the meeting, and the August 14, 2003, supplement, in reaching a final conclusion with regard to the licensees March 18, 2003, application for license amendment.
/RA/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: 50-445 and 50-446
Enclosures:
As stated cc w/encls: See next page Distribution:
Public/Non-Sensitive PDIV-1 Reading RidsNrrAdpt (BSheron/MKotzalas)
RidsNrrDlpm (LMarsh/ELeeds)
RidsNrrDe (RBarrett)
RidsNrrDeEmcb (BBateman/SCoffin)
RidsNrrDlpmLpdiv (HBerkow)
RidsNrrDlpmLpdiv1 (RGramm)
RidsNrrPMMThadani RidsNrrLADJohnson RidsOpaMailCenter (SBurnell/BHayden/VDricks)
RidsRgn4MailCenter (WJohnson)
RidsOgcRp RidsAcrsAcnwMailCenter TMensah (NRR/DSSA/SPLB)
RDennig (NRR/DRIP/RORP)
JPulsipher (NRR/DSSA/SPLB)
JClark, EDO Package Accession No.: ML032480019 Meeting Notice Accession No.: ML032190132 NRC-001 Encl. 2 -Meeting Handouts Accession No.: ML032471699 NRC-001 Encl. 3 -RSLI Procedures Accession No.: ML032480024 NRC-001 Drawing -Diagram: ML032480018 NRC-001 Meeting Summary Accession No.: ML032470557 NRC-001 OFFICE PDIV-1/PM PDIV-1/LA SPSB/SC PDIV-1/SC NAME DJaffe McMcAllister for DJohnson RDennig RGramm DATE 8/26/03 8/25/03 8/28/03 9/2/03 DOCUMENT NAME: G:\\PDIV-1\\ComanchePeak\\MTSMB8185.wpd OFFICIAL RECORD COPY LIST OF ATTENDEES August 19, 2003 Name Affiliation David Jaffe NRC/DLPM Mohan Thadani NRC/DLPM Robert Dennig NRC/DSSA Jim Pulsipher NRC/DSSA Robert Gramm NRC/DLPM Dennis Buschbaum TXU Licensing Basis Manager Steve Ellis TXU Operations Manager Mitch Lucas TXU Director of Nuclear Engineering Chuck Feist TXU Design Engineering & Analysis Jack Hicks TXU Senior Licensing Engineer via conference phone:
R. Walker TXU COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 PRESENTATION SLIDES August 19, 2003 COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 RSLI PROCEDURES
Comanche Peak Steam Electric Station, Units 1 & 2 cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Roger D. Walker Regulatory Affairs Manager TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Mr. C. Lance Terry Senior Vice President
& Principal Nuclear Officer TXU Energy ATTN: Regulatory Affairs P.O. Box 1002 Glen Rose, TX 76043