RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E.

One channel inoperable.


NOTE-------------------

The inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels.

E.1 Place channel in trip.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR E.2 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F.

THERMAL POWER F.1 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

> P-6 and < P-10, one POWER to < P-6.

Intermediate Range Neutron Flux channel OR inoperable.

F.2 Increase THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to > P-10.

G.

THERMAL POWER G.1


NOTE--------------

> P-6 and < P-10, two Limited boron Intermediate Range concentration changes Neutron Flux channels associated with RCS inoperable.

inventory control or limited plant temperature changes are allowed.

Suspend operations Immediately involving positive reactivity additions.

AND G.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to < P-6.

(continued)

Catawba Units 1 and 2 3.3.1 -3 Amendment Nos. 207 & 201

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H.

THERMAL POWER H.1 Restore channel(s) to Prior to increasing

< P-6, one or two OPERABLE status.

THERMAL POWER Intermediate Range to > P-6 Neutron Flux channels inoperable.

I.

One Source Range 1.1


NOTE--------------

Neutron Flux channel Limited boron inoperable.

concentration changes associated with RCS inventory control or limited plant temperature changes are allowed.

Suspend operations Immediately involving positive reactivity additions.

J.

Two Source Range J.1 Open RTBs.

Immediately Neutron Flux channels inoperable.

K.

One Source Range K.1 Restore channel to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Neutron Flux channel OPERABLE status.

inoperable.

OR K.2 Open RTBs.

49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> (continued)

Catawba Units 1 and 2 3.3.1 -4 Amendment Nos2O7 & 201

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME L.

One channel inoperable.


NOTE------------------

The inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels.

L.1 Place channel in trip.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR L.2 Reduce THERMAL 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> POWER to < P-7.

M.

One Reactor Coolant


NOTE-------------------

Flow - Low (Single Loop)

The inoperable channel may be channel inoperable.

bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels.

M.1 Place channel in trip.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR M.2 Reduce THERMAL 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> POWER to < P-8.

N.

One Turbine Trip - Stop


NOTE-------------------

Valve EH Pressure Low The inoperable channel may be channel inoperable.

bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels.

N.1 Place channel in trip.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR N.2 Reduce THERMAL 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> POWER to < P-9.

(continued)

Catawba Units 1 and 2 3.3.1 -5 Amendment Nos. 207 & 201

BDMS 3.3.9 3.3 INSTRUMENTATION 3.3.9 Boron Dilution Mitigation System (BDMS)

LCO 3.3.9 APPLICABILITY:

Two trains of the BDMS shall be OPERABLE.

MODES 3, 4, and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One train inoperable.

A.

Restore train to OPERABLE status.

OR A.2.1 ---------

NOTE-------------

Plant temperature changes are allowed provided that SDM is maintained and kf remains < 0.99.

Suspend operations involving positive reactivity additions.

AND A.2.2 Verify unborated water source isolation valve(s) are closed and secured.

OR A.3.1 Verify two Source Range Neutron Flux Monitors are OPERABLE.

AND 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 48 hours 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> 48 hours (continued)

Catawba Units 1 and 2 3.3.9-1 Amendment N.. 207 & 20

BDMS 3.3.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.3.2 Verify Reactor Makeup 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> Water Pumps combined flow rates are within the limits specified in the COLR.

B.

Two trains inoperable.

B.1 Restore trains to OPERABLE status.

OR B.2.1


NOTE-------------

Plant temperature changes are allowed provided that SDM is maintained and kff remains < 0.99.

Suspend operations involving positive reactivity additions.

AND B.2.2 Verify unborated water source isolation valve(s) are closed and secured.

OR B.3.1 Verify two Source Range Neutron Flux Monitors are OPERABLE.

AND B.3.2 Verify Reactor Makeup Water Pumps combined flow rates are within the limits specified in the COLR.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 12 hours 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> 12 hours 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> Catawba Units 1 and 2 3.3.9-2 Amendment Nos.207 & 201

BDMS 3.3.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.9.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.9.2 Perform COT.

31 days SR 3.3.9.3 Verify each automatic valve moves to the correct 18 months position and Reactor Makeup Water pumps stop upon receipt of an actual or simulated actuation signal.

SR 3.3.9.4


NOTE--------------------------------

Only required to be performed when used to satisfy Required Action A.3 or B.3.

Perform CHANNEL CHECK on the Source Range 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Neutron Flux Monitors.

SR 3.3.9.5


NOTE--------------------------------

Only required to be performed when used to satisfy Required Action A.3 or B.3.

Verify combined flowrates from both Reactor Makeup 31 days Water Pumps are < the value in the COLR.

SR 3.3.9.6


NOTE--------------------------------

Only required to be performed when used to satisfy Required Action A.3 or B.3.

Perform COT on the Source Range Neutron Flux 92 days Monitors.

Catawba Units 1 and 2 3.3.9-3 Amendment Nos.207 & 201

RCS Loops - MODES 3 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Loops -

MODE 3 LCO 3.4.5 Three RCS loops shall be OPERABLE, and either:

a.

Three RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or

b.

One RCS loop shall be in operation when the Rod Control System is not capable of rod withdrawal.


NOTE---------------------------------------------------------

All reactor coolant pumps may be de-energized for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 and maintain kff < 0.99; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature.

APPLICABILITY:

MODE 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or two required A.1 Restore required RCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> RCS loop(s) inoperable.

loop(s) to OPERABLE status.

B.

Required Action and B.1 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

(continued)

Catawba Units 1 and 2 3.4.5-1 Amendment Nos.207 & 201

RCS Loops - MODES 3 3.4.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

One or two required C.1 Restore required RCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RCS loop(s) not in loop(s) to operation.

operation and Rod Control System capable OR of rod withdrawal.

C.2 De-energize all control rod 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> drive mechanisms (CRDMs).

D.

Three required RCS D.1 De-energize all CRDMs.

Immediately loops inoperable.

AND OR D.2 Suspend operations that Immediately No RCS loop in would cause introduction of operation.

coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.

AND D.3 Initiate action to restore Immediately one RCS loop to OPERABLE status and operation.

Catawba Units 1 and 2 3.4.5-2 Amendment Nos.207 & 201

RCS Loops - MODES 4 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Loops -MODE 4

LCO 3.4.6 Two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and one loop shall be in operation.

Kl^-r!!

11 Ie;:>----------------------- --

1.

All reactor coolant pumps (RCPs) and RHR pumps may be de-energized for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1 and maintain kef <

0.99; and

b.

Core outlet temperature is maintained at least 1 00F below saturation temperature.

2.

No RCP shall be started with any RCS cold leg temperature < 2850F unless the secondary side water temperature of each steam generator (SG) is < 500F above each of the RCS cold leg temperatures.

APPLICABILITY:

MODE 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RCS loop A.1 Initiate action to restore a Immediately OPERABLE.

second loop to OPERABLE status.

AND Two RHR loops inoperable.

(continued)

Catawba Units 1 and 2 3.4.6-1 Amendment Nos.207 & 201

RCS Loops - MODES 4 3.4.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One RHR loop B.1 Be in MODE 5.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE.

AND ALL RCS loops inoperable.

C.

Both required RCS or C.1 Suspend operations that Immediately RHR loops inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet SDM No RCS or RHR loop in of LCO 3.1.1 and maintain operation.

kef < 0.99.

AND C.2 Initiate action to restore Immediately one loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify one RHR or RCS loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.6.2 Verify SG secondary side water levels are > 12% narrow 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> range for required RCS loops.

SR 3.4.6.3 Verify correct breaker alignment and indicated power are 7 days available to the required pump that is not in operation.

Catawba Units 1 and 2 3.4.6-2 Amendment Nos2O7 & 201

RCS Loops - MODES 5, Loops Filled 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Loops-MODE 5, Loops Filled LCO 3.4.7 One residual heat removal (RHR) loop shall be OPERABLE and in operation, and either:

a.

One additional RHR loop shall be OPERABLE; or

b.

The secondary side water level of at least two steam generators (SGs) shall be > 12% narrow range.


NOTES-----------------------------------------

1.

The RHR pump of the loop in operation may be de-energized for

< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1; and

b.

Core outlet temperature is maintained at least 1 F below saturation temperature.

2.

One required RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

3.

No reactor coolant pump shall be started with one or more RCS cold leg temperatures < 2850 F unless the secondary side water temperature of each SG is < 501F above each of the RCS cold leg temperatures.

4.

All RHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.

APPLICABILITY:

MODE 5 with RCS loops filled.

Catawba Units 1 and 2 3.4.7-1 Amendment Nos.2 0 7

& 201

RCS Loops - MODES 5, Loops Filled 3.4.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RHR loop A.1 Initiate action to restore a Immediately inoperable.

second RHR loop to OPERABLE status.

AND OR Required SGs secondary side water A.2 Initiate action to restore Immediately levels not within limits.

required SG secondary side water levels to within limits.

B.

Required RHR loops B.1 Suspend operations that Immediately inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet SDM No RHR loop in of LCO 3.1.1.

operation.

AND B.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 Verify one RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.7.2 Verify SG secondary side water level is > 12% narrow 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> range in required SGs.

SR 3.4.7.3 Verify correct breaker alignment and indicated power are 7 days available to the required RHR pump that is not in operation.

Catawba Units 1 and 2 3.4.7-2 Amendment NoS2 0 7

& 201

RCS Loops - MODES 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops -MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.


NOTES-------------------------------

1.

All RHR pumps may be de-energized for < 15 minutes when switching from one loop to another provided:

a.

The core outlet temperature is maintained at least 1 F below saturation temperature.

b.

No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1; and

c.

No draining operations to further reduce the RCS water volume are permitted.

2.

One RHR loop may be inoperable for < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

APPLICABILITY:

MODE 5 with RCS loops not filled.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RHR loop A.1 Initiate action to restore Immediately inoperable.

RHR loop to OPERABLE status.

(continued)

Catawba Units 1 and 2 3.4.8-1 Amendment Nos.207 & 201

RCS Loops - MODES 5, Loops Not Filled 3.4.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Required RHR loops B.1 Suspend operations that Immediately inoperable.

would cause introduction of coolant into the RCS with OR boron concentration less than required to meet SDM No RHR loop in of LCO 3.1.1.

operation.

AND B.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.8.2 Verify correct breaker alignment and indicated power are 7 days available to the required RHR pump that is not in operation.

Catawba Units 1 and 2 3.4.8-2 Amendment Nos.207 & 201

AC Sources - Shutdown 3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required offsite power circuit to OPERABLE status.

B.

One required DG B.1 Suspend CORE Immediately inoperable.

ALTERATIONS.

AND B.2 Suspend movement of Immediately irradiated fuel assemblies.

AND B.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND B.4 Initiate action to restore Immediately required DG to OPERABLE status.

Catawba Units 1 and 2 3.8.2-2 Amendment Nos. 207 & 201

DC Sources - Shutdown 3.8.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required DC electrical power subsystems to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1


NOTE ----------------------------

The following SRs are not required to be performed:

SR 3.8.4.7, SR 3.8.4.8, and SR 3.8.4.9.

For DC sources required to be OPERABLE, the following In accordance with SRs are applicable:

applicable SRs SR 3.8.4.1 SR 3.8.4.4 SR 3.8.4.7 SR 3.8.4.2 SR 3.8.4.5 SR 3.8.4.8 SR 3.8.4.3 SR 3.8.4.6 SR 3.8.4.9 Catawba Units I and 2 3.8.5-2 Amendment Nos.207 & 201

Inverters - Shutdown 3.8.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND A.2.4 Initiate action to restore Immediately required inverters to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct voltage and alignment to required AC vital 7 days bus.

Catawba Units and 2 3.8.8-2 Amendment Nos. 207 & 201

Distribution Systems - Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems-Shutdown LCO 3.8.10 APPLICABILITY:

The necessary portion of AC, channels of DC, DC trains and AC vital buses electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.

MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Declare associated Immediately AC, channel(s) of DC, supported required DC train(s) or AC vital feature(s) inoperable.

bus(es) electrical power distribution subsystems OR inoperable.

A.2.1 Suspend CORE Immediately ALTERATIONS.

AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Suspend operations Immediately involving positive reactivity additions that could result in loss of required SDM or required boron concentration.

AND (continued)

Catawba Units 1 and 2 3.8.1 0-1 Amendment Nos. 207 & 201

Nuclear Instrumentation 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Nuclear Instrumentation LCO 3.9.2 Two Boron Dilution Mitigation System (BDMS) trains shall be OPERABLE.


NOTE-----------------------------------------

Automatic actuation of the BDMS may be blocked during core reloading until two assemblies are loaded into the core.

APPLICABILITY:

MODE 6.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or both BDMS A.1.1 Suspend CORE Immediately trains inoperable.

ALTERATIONS.

AND A.1.2 Suspend operations that Immediately would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

AND A.1.3 Verify unborated water 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> source isolation valve(s) are closed and secured.

AND A.1.4 Perform SR 3.9.1.1.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR (continued)

Catawba Units 1 and 2 3.9.2-1 Amendment Nos.20 7

& 201

Nuclear Instrumentation 3.9.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2.1 Verify two Source Range Immediately Neutron Flux Monitors are OPERABLE.

AND A.2.2 Verify Reactor Makeup 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Water Pumps combined flow rates are within the limits specified in the COLR.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.9.2.2 Perform COT.

31 days SR 3.9.2.3 Verify each automatic valve moves to the correct position 18 months and Reactor Makeup Water pumps stop upon receipt of an actual or simulated actuation signal.

SR 3.9.2.4 ---------------------------

NOTE--------------------------------

Only required to be performed when used to satisfy Required Action A.2.1.

Perform CHANNEL CHECK on the Source Range 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Neutron Flux Monitors.

(continued)

Catawba Units and 2 3.9.2-2 Amendment Nos.207 & 201

RHR and Coolant Circulation - High Water Level 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Residual Heat Removal (RHR) and Coolant Circulation-High Water Level LCO 3.9.4 One RHR loop shall be OPERABLE and in operation.


------------------------------ NOTE------------------------------------------------------------

The required RHR loop may be removed from operation for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause introduction of coolant into the Reactor Coolant System with boron concentration less than required to meet the minimum required boron concentration of LCO 3.9.1.

APPLICABILITY:

MODE 6 with the water level > 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

RHR loop requirements A.1 Suspend operations that Immediately not met.

would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

AND A.2 Suspend loading irradiated Immediately fuel assemblies in the core.

AND A.3 Initiate action to satisfy Immediately RHR loop requirements.

AND (continued)

Catawba Units 1 and 2 3.9.4-1 Amendment Nos.207 & 201

RHR and Coolant Circulation - Low Water Level 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Residual Heat Removal (RHR) and Coolant Circulation -

Low Water Level LCO 3.9.5 Two RHR loops shall be OPERABLE, and one RHR loop shall be in operation.

APPLICABILITY:

MODE 6 with the water level < 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Less than the required A.1 Initiate action to restore Immediately number of RHR loops required RHR loops to OPERABLE.

OPERABLE status.

OR A.2 Initiate action to establish Immediately

> 23 ft of water above the top of reactor vessel flange.

B.

No RHR loop in B.1 Suspend operations that Immediately operation.

would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

AND (continued)

Catawba Units 1 and 2 3.9.5-1 Amendment NOs 20 7

& 201

RTS Instrumentation B 3.3.1 BASES ACTIONS (continued) the P-10 setpoint, the NIS intermediate range detector performs the monitoring Functions. If THERMAL POWER is greater than the P-6 setpoint but less than the P-1 0 setpoint, 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is allowed to reduce THERMAL POWER below the P-6 setpoint or increase to THERMAL POWER above the P-10 setpoint. The NIS Intermediate Range Neutron Flux channels must be OPERABLE when the power level is above the capability of the source range, P-6, and below the capability of the power range, P-10. If THERMAL POWER is greater than the P-10 setpoint, the NIS power range detectors perform the monitoring and protection functions and the intermediate range is not required. The Completion Times allow for a slow and controlled power adjustment above P-10 or below P-6 and take into account the redundant capability afforded by the redundant OPERABLE channel, and the low probability of its failure during this period. This action does not require the inoperable channel to be tripped because the Function uses one-out-of-two logic. Tripping one channel would trip the reactor. Thus, the Required Actions specified in this Condition are only applicable when channel failure does not result in reactor trip.

G.1 and G.2 Condition G applies to two inoperable Intermediate Range Neutron Flux trip channels in MODE 2 when THERMAL POWER is above the P-6 setpoint and below the P-1 0 setpoint.

Required Actions specified in this Condition are only applicable when channel failures do not result in reactor trip. Above the P-6 setpoint and below the P-1 0 setpoint, the NIS intermediate range detector performs the monitoring Functions. With no intermediate range channels OPERABLE, the Required Actions are to suspend operations involving positive reactivity additions immediately. This will preclude any power level increase since there are no OPERABLE Intermediate Range Neutron Flux channels. The operator must also reduce THERMAL POWER below the P-6 setpoint within two hours. Below P-6, the Source Range Neutron Flux channels will be able to monitor the core power level. The Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> will allow a slow and controlled power reduction to less than the P-6 setpoint and takes into account the low probability of occurrence of an event during this period that may require the protection afforded by the NIS Intermediate Range Neutron Flux trip. Required Action G.i is modified by a Note to indicate that normal plant control operations that individually add limited positive reactivity (e.g., temperature or boron fluctuations associated with RCS inventory management or temperature control) are not precluded by this Catawba Units 1 and 2 B 3.3.1-35 Revision No. 1

RTS Instrumentation B 3.3.1 BASES ACTIONS (continued)

Action.

H.1 Condition H applies to the Intermediate Range Neutron Flux trip when THERMAL POWER is below the P-6 setpoint and one or two channels are inoperable. Below the P-6 setpoint, the NIS source range performs the monitoring and protection functions. The inoperable NIS intermediate range channel(s) must be returned to OPERABLE status prior to increasing power above the P-6 setpoint. The NIS intermediate range channels must be OPERABLE when the power level is above the capability of the source range, P-6, and below the capability of the power range, P-1 0.

1.1 Condition I applies to one inoperable Source Range Neutron Flux trip channel when in MODE 2, below the P-6 setpoint, and performing a reactor startup. With the unit in this Condition, below P-6, the NIS source range performs the monitoring and protection functions. With one of the two channels inoperable, operations involving positive reactivity additions shall be suspended immediately. This will preclude any power escalation.

With only one source range channel OPERABLE, core protection is severely reduced and any actions that add positive reactivity to the core must be suspended immediately. Required Action 1.1 is modified by a Note to indicate that normal plant control operations that individually add limited positive reactivity (e.g., temperature or boron fluctuations associated with RCS inventory management or temperature control) are not precluded by this Action.

J.1 Condition J applies to two inoperable Source Range Neutron Flux trip channels when in MODE 2, below the P-6 setpoint, and performing a reactor startup, or in MODE 3, 4, or 5 with the RTBs closed and the CRD System capable of rod withdrawal. With the unit in this Condition, below P-6, the NIS source range performs the monitoring and protection functions. With both source range channels inoperable, the RTBs must be opened immediately. With the RTBs open, the core is in a more stable condition and the unit exits this Condition.

Catawba Units 1 and 2 B 3.3.1-36 Revision No. 1

BDMS B 3.3.9 BASES APPLICABILITY (continued)

The BDMS OPERABILITY requirements are not applicable in MODES 1 and 2 because an inadvertent boron dilution would be terminated by a source range trip, a trip on the Power Range Neutron Flux-High (low setpoint nominally 25% RTP), or Overtemperature AT. These RTS Functions are discussed in LCO 3.3.1, RTS Instrumentation."

The requirements for OPERABILITY of the BDMS in MODE 6 are described in LCO 3.9.2, Boron Dilution Mitigation System."

ACTIONS The most common cause of channel inoperability is outright failure or drift of the shutdown margin monitor sufficient to exceed the tolerance allowed by the unit specific calibration procedure. Typically, the drift is found to be small and results in a delay of actuation rather than a total loss of function. This determination of setpoint drift is generally made during the performance of a COT when the process instrumentation is set up for adjustment to bring it to within specification. If the Trip Setpoint is less conservative than the tolerance specified by the calibration procedure, the channel must be declared inoperable immediately and the appropriate Condition entered.

A.1. A.2.1. A.2.2. A.3.1. and A.3.2 With one BDMS train inoperable, redundancy for mitigation of dilution events is no longer available. In this case, the BDMS train is required to be restored to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. As an alternative (Required Actions A.2.1 and A.2.2), operations involving positive reactivity additions must be suspended and valve NV-230 must be closed and secured within the following hour to isolate the unborated water sources. A third alternative (Required Actions A.3.1 and A.3.2) is to provide alternate methods of monitoring core reactivity conditions and controlling boron dilution incidents. Alternative monitoring may be provided by the two Source Range Neutron Flux monitors. These monitors must be verified to operate with alarm setpoints less than or equal to one-half decade (Square root of 10) above the steady-state count rate. In addition, the combined flowrate from both reactor makeup water pumps must be verified within the next hour to be within the limits specified in the COLR. Required Action A.2.1 is modified by a Note, which permits plant temperature changes provided the temperature change is accounted for in the calculated SDM and that kff remains <

0.99. Introduction of temperature changes, including temperature increases when a positive MTC exists, must be evaluated to ensure they do not result in a loss of required SDM or adequate margin to criticality.

Catawba Units 1 and 2 B 3.3.9-2 Revision No. 1

BDMS B 3.3.9 BASES ACTIONS (continued)

The Completion Times are based on the remaining OPERABLE BDMS train and the low probability of an event occurring during this time.

B.1. B.2.1, B.2.2. B.3.1. and B.3.2 With both BDMS trains inoperable, the automatic capability for mitigation of dilution events is no longer available. In this case, one BDMS train is required to be restored to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. As an alternative (Required Actions B.2.1 and B.2.2), operations involving positive reactivity additions must be suspended and valve NV-230 must be closed and secured within the following hour to isolate the unborated water sources. A third alternative (Required Actions B.3.1 and B.3.2) is to provide alternate methods of monitoring core reactivity conditions and controlling boron dilution incidents. Alternative monitoring may be provided by the two Source Range Neutron Flux monitors. These monitors must be verified to operate with alarm setpoints less than or equal to one-half decade (Square root of 10) above the steady-state count rate. In addition, the combined flowrate from both reactor makeup water pumps must be verified within the next hour to be within the limits specified in the COLR. Required Action B.2.1 is modified by a Note, which permits plant temperature changes provided the temperature change is accounted for in the calculated SDM and that kef remains <

0.99. Introduction of temperature changes, including temperature increases when a positive MTC exists, must be evaluated to ensure they do not result in a loss of required SDM or adequate margin to criticality.

The Completion Times are based on the low probability of an event occurring during this time.

SURVEILLANCE SR 3.3.9.1 REQUIREMENTS SR 3.3.9.1 is the performance of a CHANNEL CHECK on the BDMS, which is a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that the two indication channels should be consistent with core conditions.

Changes in fuel loading and core geometry can result in significant differences, but each channel should be consistent with its local conditions. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with the CHANNEL CHECK Frequency specified for similar instruments in LCO 3.3.1.

Catawba Units 1 and 2 B 3.3.9-3 Revision No. 1

RCS Loops - MODE 3 B 3.4.5 BASES LCO (continued)

Utilization of the Note is permitted provided the following conditions are met, along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant at boron concentration less than required to assure the SDM of LCO 3.1.1 and maintain ke < 0.99, thereby maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentration less than required to assure SDM and maintain kf < 0.99, is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

An OPERABLE RCS loop consists of one OPERABLE RCP and one OPERABLE SG in accordance with the Steam Generator Tube Surveillance Program, which has the minimum water level specified in SR 3.4.5.2. An RCP is OPERABLE if it is capable of being powered and is able to provide forced flow if required.

APPLICABILITY In MODE 3, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing.

The most stringent condition of the LCO, that is, three RCS loops OPERABLE and three RCS loops in operation, applies to MODE 3 with RTBs in the closed position. The least stringent condition, that is, three RCS loops OPERABLE and one RCS loop in operation, applies to MODE 3 with the RTBs open.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.6, "RCS Loops-MODE 4";

LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";

LCO 3.4.8, RCS Loops-MODE 5, Loops Not Filled";

LCO 3.4.17, ARCS Loops-Test Exceptions";

LCO 3.9.4, Residual Heat Removal (RHR) and Coolant Circulation-High Water Level' (MODE 6); and LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).

Catawba Units 1 and 2 B 3.4.5-3 Revision No. 1

RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS (continued)

CRDMs must be de-energized by opening the RTBs or de-energizing the MG sets. All operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended, and action to restore one of the RCS loops to OPERABLE status and operation must be initiated. RCP seal injection flow is not considered to be an operation involving a reduction in RCS boron concentration. Boron dilution requires forced circulation for proper mixing, and opening the RTBs or de-energizing the MG sets removes the possibility of an inadvertent rod withdrawal. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality. The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation. Once the CRDMs have been de-energized by opening the RTBs or de-energizing the MG sets, other methods to keep the CRDMs de-energized may be used. These methods are pulling fuses or opening sliding links in the rod control cabinets. This allows the flexibility for closing the RTBs or energizing the MG sets, while still preventing rod motion.

SURVEILLANCE SR 3.4.5.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loops are in operation. Verification includes flow rate, temperature, and pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS loop performance.

SR 3.4.5.2 SR 3.4.5.2 requires verification of SG OPERABILITY. SG OPERABILITY is verified by ensuring that the secondary side narrow range water level is 2 12% for required RCS loops. If the SG secondary side narrow range water level is < 12%, the tubes may become uncovered and the associated loop may not be capable of providing the heat sink for removal of the decay heat. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of SG level.

Catawba Units 1 and 2 B 3.4.5-5 Revision No. 2

RCS Loops - MODE 3 B 3.4.5 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.4.5.3 Verification that the required RCPs are OPERABLE ensures that safety analyses limits are met. The requirement also ensures that an additional RCP can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power availability to the required RCPs.

REFERENCES

1.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.4.5-6 Revision No. 2

RCS Loops - MODE 4 B 3.4.6 BASES LCO (continued) performed during the startup testing program is the validation of rod drop times during cold conditions, both with and without flow. The no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits the de-energizing of the pumps in order to perform this test and validate the assumed analysis values. If changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values must be revalidated by conducting the test again. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.

Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentrations less than required to meet SDM of LCO 3.1.1 and maintain kf < 0.99, therefore maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM and maintain kff < 0.99 is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Note 2 requires that the secondary side water temperature of each SG be 5 500F above each of the RCS cold leg temperatures before the start of an RCP with any RCS cold leg temperature

  • 2850F. This restraint is to prevent a low temperature overpressure event due to a thermal transient when an RCP is started.

An OPERABLE RCS loop comprises an OPERABLE RCP and an OPERABLE SG in accordance with the Steam Generator Tube Surveillance Program, which has the minimum water level specified in SR 3.4.6.2. The water level is maintained by an OPERABLE AFW train in accordance with LCO 3.7.5, Auxiliary Feedwater System.'

Similarly for the RHR System, an OPERABLE RHR loop comprises an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RCPs and RHR pumps are OPERABLE if they are capable of being powered and are able to provide forced flow if required.

Catawba Units 1 and 2 B 3.4.6-2 Revision No. 1

RCS Loops - MODE 4 B 3.4.6 BASES ACTIONS (continued)

C.1 and C.2 If no loop is OPERABLE or in operation, except during conditions permitted by Note 1 in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 and maintain kf < 0.99 must be suspended and action to restore one RCS or RHR loop to OPERABLE status and operation must be initiated. RCP seal injection flow is not considered to be an operation involving a reduction in RCS boron concentration. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 and maintain kff < 0.99 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM and kef requirements maintains acceptable margin to criticality. The immediate Completion Times reflect the importance of maintaining operation for decay heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.6.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that one RCS or RHR loop is in operation. Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS and RHR loop performance.

SR 3.4.6.2 SR 3.4.6.2 requires verification of SG OPERABILITY. SG OPERABILITY is verified by ensuring that the secondary side narrow range water level is 2 12%. If the SG secondary side narrow range water level is < 12%, the tubes may become uncovered and the associated loop may not be capable of providing the heat sink necessary for removal of decay heat.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to the loss of SG level.

Catawba Units 1 and 2 B 3.4.6-4 Revision No. 1

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO The purpose of this LCO is to require that at least one of the RHR loops be OPERABLE and in operation with an additional RHR loop OPERABLE or two SGs with secondary side narrow range water level 2 12%. One RHR loop provides sufficient forced circulation to perform the safety functions of the reactor coolant under these conditions. An additional RHR loop is required to be OPERABLE to meet single failure considerations. However, if the standby RHR loop is not OPERABLE, an acceptable alternate method is two SGs with their secondary side narrow range water levels 2 12%. Should the operating RHR loop fail, the SGs could be used to remove the decay heat.

Note 1 permits all RHR pumps to be de-energized < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The purpose of the Note is to permit tests designed to validate various accident analyses values. One of the tests performed during the startup testing program is the validation of rod drop times during cold conditions, both with and without flow. The no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits de-energizing of the pumps in order to perform this test and validate the assumed analysis values. If changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values must be revalidated by conducting the test again. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating experience has shown that boron stratification is not likely during this short period with no forced flow.

Utilization of Note 1 is permitted provided the following conditions are met, along with any other conditions imposed by initial startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentrations less than required to meet SDM of LCO 3.1.1, therefore maintaining an adequate margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM is maintained is prohibited because a uniform concentration distribution throughout the RCS cannot be ensured when in natural circulation; and

b.

Core outlet temperature is maintained at least 1 0F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Note 2 allows one RHR loop to be inoperable for a period of up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, provided that the other RHR loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when such testing is safe and possible.

Note 3 requires that the secondary side water temperature of each SG be

< 500F above each of the RCS cold leg temperatures before the start of a Catawba Units 1 and 2 B 3.4.7-2 Revision No. 1

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO (continued) reactor coolant pump (RCP) with an RCS cold leg temperature < 2850F.

This restriction is to prevent a low temperature overpressure event due to a thermal transient when an RCP is started.

Note 4 provides for an orderly transition from MODE 5 to MODE 4 during a planned heatup by permitting removal of RHR loops from operation when at least one RCS loop is in operation. This Note provides for the transition to MODE 4 where an RCS loop is permitted to be in operation and replaces the RCS circulation function provided by the RHR loops.

An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger.

If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. An OPERABLE SG can perform as a heat sink when it has an adequate water level and is OPERABLE in accordance with the Steam Generator Tube Surveillance Program.

APPLICABILITY In MODE 5 with RCS loops filled, this LCO requires forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. One loop of RHR provides sufficient circulation for these purposes. However, one additional RHR loop is required to be OPERABLE, or the secondary side narrow range water level of at least two SGs is required to be 2 12%.

Operation in other MODES is covered by:

LCO 3.4.4, RCS Loops-MODES 1 and 2; LCO 3.4.5, RCS Loops-MODE 3";

LCO 3.4.6, RCS Loops-MODE 4; LCO 3.4.8, RCS Loops-MODE 5, Loops Not Filled";

LCO 3.4.17 RCS Loops-Test Exceptions';

LCO 3.9.4, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Levelm (MODE 6).

Catawba Units 1 and 2 B 3.4.7-3 Revision No. 2

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES ACTIONS A.1 and A.2 If one RHR loop is inoperable and the required SGs have secondary side narrow range water levels < 12%, redundancy for heat removal is lost.

Action must be initiated immediately to restore a second RHR loop to OPERABLE status or to restore the required SG secondary side water levels. Either Required Action A.1 or Required Action A.2 will restore redundant heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

B.1 and B.2 If no RHR loop is in operation, except during conditions permitted by Note 1, or if no loop is OPERABLE, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended and action to restore one RHR loop to OPERABLE status and operation must be initiated. RCP seal injection flow is not considered to be an operation involving a reduction in RCS boron concentration. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality. The immediate Completion Times reflect the importance of maintaining operation for heat removal.

SURVEILLANCE SR 3.4.7.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loop is in operation. Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.

SR 3.4.7.2 Verifying that at least two SGs are OPERABLE by ensuring their secondary side narrow range water levels are 2 12% ensures an alternate decay heat removal method in the event that the second RHR loop is not OPERABLE. If both RHR loops are OPERABLE, this Surveillance is not needed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to the loss of SG level.

Catawba Units 1 and 2 B 3.4.7-4 Revision No. 2

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.4.7.3 Verification that a second RHR pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the RHR pump.

If secondary side narrow range water level is 2 12% in at least two SGs, this Surveillance is not needed. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

REFERENCES

1.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.4.7-5 Revision No. 2

RCS Loops-MODE 5, Loops Not Filled B 3.4.8 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.8 RCS Loops-MODE 5, Loops Not Filled BASES BACKGROUND In MODE 5 with the RCS loops not filled, the primary function of the reactor coolant is the removal of decay heat generated in the fuel, and the transfer of this heat to the component cooling water via the residual heat removal (RHR) heat exchangers. The steam generators (SGs) are not available as a heat sink when the loops are not filled. The secondary function of the reactor coolant is to act as a carrier for the soluble neutron poison, boric acid.

In MODE 5 with loops not filled, only RHR pumps can be used for coolant circulation. The number of pumps in operation can vary to suit the operational needs. The intent of this LCO is to provide forced flow from at least one RHR pump for decay heat removal and transport and to require that two paths be available to provide redundancy for heat removal.

APPLICABLE In MODE 5, RCS circulation is considered in the determination of the time SAFETY ANALYSES time available for mitigation of the accidental boron dilution event. The RHR loops provide this circulation. The flow provided by one RHR loop is adequate for heat removal and for boron mixing.

RCS loops in MODE 5 (loops not filled) satisfy Criterion 4 of 10 CFR 50.36 (Ref. 1).

LCO The purpose of this LCO is to require that at least two RHR loops be OPERABLE and one of these loops be in operation. An OPERABLE loop is one that has the capability of transferring heat from the reactor coolant at a controlled rate. Heat cannot be removed via the RHR System unless forced flow is used. A minimum of one running RHR pump meets the LCO requirement for one loop in operation. An additional RHR loop is required to be OPERABLE to meet single failure considerations.

Note 1 permits all RHR pumps to be de-energized for < 15 minutes when switching from one loop to another. The circumstances for stopping both RHR pumps are to be limited to situations when the outage time is short and core outlet temperature is maintained at least 10OF below saturation temperature. The Note prohibits boron dilution with coolant at boron concentrations less than required to assure SDM of LCO 3.1.1 is maintained or draining operations when RHR forced flow is stopped.

Catawba Units 1 and 2 B 3.4.8-1 Revision No. 1

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES LCO (continued)

Note 2 allows one RHR loop to be inoperable for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible.

An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger.

RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service.

APPLICABILITY In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.5, RCS Loops-MODE 3";

LCO 3.4.6, RCS Loops-MODE 4; LCO 3.4.7, RCS Loops-MODE 5, Loops Filled";

LCO 3.4.17, "RCS Loops-Test Exceptions";

LCO 3.9.4, Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.5, Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).

ACTIONS A.1 If only one RHR loop is OPERABLE and in operation, redundancy for RHR is lost. Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

B.1 and B.2 If no required RHR loops are OPERABLE or in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1 must be suspended and action must be initiated Catawba Units 1 and 2 B 3.4.8-2 Revision No. 2

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES ACTIONS (continued) immediately to restore an RHR loop to OPERABLE status and operation.

RCP seal injection flow is not considered to be an operation involving a reduction in RCS boron concentration. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to criticality. The immediate Completion Time reflects the importance of maintaining operation for heat removal.

The action to restore must continue until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.8.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that one loop is in operation.

Verification includes flow rate, temperature, or pump status monitoring, which help ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.

SR 3.4.8.2 Verification that the required number of pumps are OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pumps. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

REFERENCES

1.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.4.8-3 Revision No. 2

AC Sources-Shutdown B 3.8.2 BASES ACTIONS (continued)

A.2.1. A.2.2. A.2.3, A.2.4, B.1. B.2, B.3. and B.4 With the offsite circuit not available to all required trains, the option would still exist to declare all required features inoperable. Since this option may involve undesired administrative efforts, the allowance for sufficiently conservative actions is made. With the required DG inoperable, the minimum required diversity of AC power sources is not available. It is, therefore, required to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions that could result in loss of required SDM (MODE 5) or required boron concentration (MODE 6). Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation.

Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability or the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC sources and to continue this action until restoration is accomplished in order to provide the necessary AC power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required AC electrical power sources should be completed as quickly as possible in order to minimize the time during which the unit safety systems may be without sufficient power.

Pursuant to LCO 3.0.6, the Distribution System's ACTIONS would not be entered even if all AC sources to it are inoperable, resulting in de-energization. Therefore, the Required Actions of Condition A are modified by a Note to indicate that when Condition A is entered with no AC power to any required ESF bus, the ACTIONS for LCO 3.8.10 must be immediately entered. This Note allows Condition A to provide requirements for the loss of the offsite circuit, whether or not a train is de-energized. LCO 3.8.10 would provide the appropriate restrictions for the situation involving a de-energized train.

Catawba Units 1 and 2 B 3.8.2-5 Revision No. 1

DC Sources-Shutdown B 3.8.5 BASES LCO (continued) and interconnecting cabling within the train, are required to be OPERABLE to support required trains of the distribution systems required OPERABLE by LCO 3.8.10, Distribution Systems-Shutdown." This ensures the availability of sufficient DC electrical power sources to operate the unit in a safe manner and to mitigate the consequences of postulated events during shutdown (e.g., fuel handling accidents).

APPLICABILITY The DC electrical power sources required to be OPERABLE in MODES 5 and 6, and during movement of irradiated fuel assemblies, provide assurance that:

a.

Required features to provide adequate coolant inventory makeup are available for the irradiated fuel assemblies in the core;

b.

Required features needed to mitigate a fuel handling accident are available;

c.

Required features necessary to mitigate the effects of events that can lead to core damage during shutdown are available; and

d.

Instrumentation and control capability is available for monitoring and maintaining the unit in a cold shutdown condition or refueling condition.

The DC electrical power requirements for MODES 1, 2, 3, and 4 are covered in LCO 3.8.4.

ACTIONS A.1.1. A.2.1, A.2.2. A.2.3. and A.2.4 If two trains are required by LCO 3.8.10, the remaining train with DC power available may be capable of supporting sufficient systems to allow continuation of CORE ALTERATIONS and fuel movement. By allowing the option to declare required features inoperable with the associated DC power source(s) inoperable, appropriate restrictions will be implemented in accordance with the affected required features LCO ACTIONS. In many instances, this option may involve undesired administrative efforts.

Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions) that could result in loss of required SDM (MODE 5) or required boron concentration (MODE 6). Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration Catawba Units 1 and 2 B 3.8.5-2 Revision No. 2

DC Sources-Shutdown B 3.8.5 BASES ACTIONS (continued) limits is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities shall not preclude completion of actions to establish a safe conservative condition. These actions minimize probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required DC electrical power subsystems and to continue this action until restoration is accomplished in order to provide the necessary DC electrical power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required DC electrical power subsystems should be completed as quickly as possible in order to minimize the time during which the unit safety systems may be without sufficient power.

SURVEILLANCE SR 3.8.5.1 REQUIREMENTS SR 3.8.5.1 requires performance of all Surveillances required by SR 3.8.4.1 through SR 3.8.4.9. Therefore, see the corresponding Bases for LCO 3.8.4 for a discussion of each SR.

This SR is modified by a Note. The reason for the Note is to preclude requiring the OPERABLE DC sources from being discharged below their capability to provide the required power supply or otherwise rendered inoperable during the performance of SRs. It is the intent that these SRs must still be capable of being met, but actual performance is not required.

REFERENCES

1.

UFSAR, Chapter 6.

2.

UFSAR, Chapter 15.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.8.5-3 Revision No. 1

Inverters-Shutdown B 3.8.8 BASES ACTIONS (continued) this option may involve undesired administrative efforts. Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions) that could result in loss of required SDM (MODE 5) or required boron concentration (MODE 6).

Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration.

This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities shall not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required inverters and to continue this action until restoration is accomplished in order to provide the necessary inverter power to the unit safety systems.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required inverters should be completed as quickly as possible in order to minimize the time the unit safety systems may be without power or powered from a constant voltage source transformer.

SURVEILLANCE SR 3.8.8.1 REQUIREMENTS This Surveillance verifies that the power sources are functioning properly with all required circuit breakers closed and AC vital bus energized from the required power source. The verification of proper indicated voltage ensures that required power is readily available for the instrumentation connected to the AC vital bus. The 7 day Frequency takes into account the redundant capability of the power sources and other indications available in the control room that alert the operator to inverter malfunctions.

Catawba Units 1 and 2 B 3.8.8-3 Revision No. 2

Inverters-Shutdown B 3.8.8 BASES REFERENCES

1.

UFSAR, Chapter 6.

2.

UFSAR, Chapter 15.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.8.8-4 Revision No..0

Distribution Systems-Shutdown B 3.8.10 BASES ACTIONS (continued) the affected distribution subsystem LCO's Required Actions. In many instances, this option may involve undesired administrative efforts.

Therefore, the allowance for sufficiently conservative actions is made (i.e., to suspend CORE ALTERATIONS, movement of irradiated fuel assemblies, and operations involving positive reactivity additions that could result in loss of required SDM (MODE 5) or required boron concentration (MODE 6)). Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limits is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC and DC electrical power distribution subsystems and to continue this action until restoration is accomplished in order to provide the necessary power to the unit safety systems.

Notwithstanding performance of the above conservative Required Actions, a required residual heat removal (RHR) subsystem and/or required Low Temperature Overpressure Protection (LTOP) features may be inoperable. In this case, Required Actions A.2.1 through A.2.4 do not adequately address the concerns relating to coolant circulation and heat removal. Pursuant to LCO 3.0.6, the RHR or LTOP ACTIONS would not be entered. Therefore, Required Actions A.2.5 and A.2.6 is provided to direct declaring RHR or LTOP inoperable, which results in taking the appropriate actions.

The Completion Time of immediately is consistent with the required times for actions requiring prompt attention. The restoration of the required distribution subsystems should be completed as quickly as possible in order to minimize the time the unit safety systems may be without power.

Catawba Units 1 and 2 B 3.8.10-3 Revision No. 2

Distribution Systems-Shutdown B 3.8.10 BASES SURVEILLANCE SR 3.8.10.1 REQUIREMENTS This Surveillance verifies that the AC, channels of DC, DC trains, and AC vital bus electrical power distribution subsystems are functioning properly, with all the buses energized. The verification of proper indicated voltage availability on the buses ensures that the required power is readily available for motive as well as control functions for critical system loads connected to these buses. The 7 day Frequency takes into account the capability of the electrical power distribution subsystems, and other indications available in the control room that alert the operator to subsystem malfunctions.

REFERENCES

1.

UFSAR, Chapter 6.

2.

UFSAR, Chapter 15.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.8.10-4 Revision No.

Boron Concentration B 3.9.1 BASES APPLICABLE SAFETY ANALYSES During refueling operations, the reactivity condition of the core is consistent with the initial conditions assumed for the boron dilution accident in the accident analysis and is conservative for MODE 6. The boron concentration limit specified in the COLR is based on the core reactivity at the beginning of each fuel cycle (the end of refueling) and includes an uncertainty allowance.

The required boron concentration and the plant refueling procedures that verify the correct fuel loading plan (including full core mapping) ensure that the k" of the core will remain < 0.95 during the refueling operation.

Hence, at least a 5% Ak/k margin of safety is established during refueling.

During refueling, the water volume in the spent fuel pool, the transfer canal, the refueling canal, the refueling cavity, and the reactor vessel form a single mass. As a result, the soluble boron concentration is relatively the same in each of these volumes.

The RCS boron concentration satisfies Criterion 2 of 10 CFR 50.36 (Ref.

2).

LCO The LCO requires that a minimum boron concentration be maintained in the RCS, the refueling canal, and the refueling cavity while in MODE 6.

The boron concentration limit specified in the COLR ensures that a core kff of S 0.95 is maintained during fuel handling operations. Violation of the LCO could lead to an inadvertent criticality during MODE 6.

APPLICABILITY This LCO is applicable in MODE 6 to ensure that the fuel in the reactor vessel will remain subcritical. The required boron concentration ensures a keff < 0.95. Above MODE 6, LCO 3.1.1, "SHUTDOWN MARGIN (SDM),"

ensures that an adequate amount of negative reactivity is available to shut down the reactor and maintain it subcritical.

ACTIONS A.1 and A.2 Continuation of CORE ALTERATIONS or positive reactivity additions (including actions to reduce boron concentration) is contingent upon maintaining the unit in compliance with the LCO. If the boron concentration of any coolant volume in the RCS, the refueling canal, or the refueling cavity is less than its limit, all operations involving CORE ALTERATIONS or positive reactivity additions must be suspended immediately.

Suspension of CORE ALTERATIONS and positive reactivity additions shall not preclude moving a component to a safe position. Operations I

Catawba Units 1 and 2 B 3.9.1 -2 Revision No. 1

Boron Concentration B 3.9.1 BASES ACTIONS (continued) that individually add limited positive reactivity (e.g., temperature fluctuations from inventory addition or temperature control fluctuations),

but when combined with all other operations affecting core reactivity (e.g.,

intentional boration) result in overall net negative reactivity addition, are not precluded by this Action.

A.3 In addition to immediately suspending CORE ALTERATIONS and positive l reactivity additions, boration to restore the concentration must be initiated immediately.

In determining the required combination of boration flow rate and concentration, no unique Design Basis Event must be satisfied. The only requirement is to restore the boron concentration to its required value as soon as possible. In order to raise the boron concentration as soon as possible, the operator should begin boration with the best source available for unit conditions. An acceptable method is to borate at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or its equivalent.

Once actions have been initiated, they must be continued until the boron concentration is restored. The restoration time depends on the amount of boron that must be injected to reach the required concentration.

SURVEILLANCE SR 3.9.1.1 REQUIREMENTS This SR ensures that the coolant boron concentration in the RCS, the refueling canal, and the refueling cavity is within the COLR limits. The boron concentration of the coolant in each volume is determined periodically by chemical analysis. One sample from the refueling canal or reactor cavity is sufficient to determine the boron concentration in that volume of water. An additional sample is taken from the RCS.

A minimum Frequency of once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is a reasonable amount of time to verify the boron concentration of representative samples. The Frequency is based on operating experience, which has shown 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to be adequate.

REFERENCES

1.

10 CFR 50, Appendix A, GDC 26.

2.

10 CFR 50.36, Technical Specifications (c)(2)(ii).

Catawba Units 1 and 2 B 3.9.1-3 Revision No. 1

Nuclear Instrumentation B 3.9.2 BASES BACKGROUND (continued) detectors monitor neutrons leaking from the core. Neutron flux indication is provided in counts per second. The NIS source range channels and the Gamma-Metrics shutdown monitors provide continuous visible indication in the control room and an audible alarm to alert operators of a possible dilution accident. In addition, the NIS source range channels provide audible indication in the control room and in the containment.

APPLICABLE The BDMS senses abnormal increases in source range counts per minute SAFETY ANALYSES (flux rate) and actuates CVCS and RWST valves to mitigate the consequences of an inadvertent boron dilution event (Ref. 1). The accident analyses rely'on automatic BDMS actuation to mitigate the consequences of inadvertent boron dilution events.

The BDMS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).

LCO This LCO requires that two Boron Dilution Mitigation System trains be OPERABLE to ensure that appropriate monitoring capability is available to detect changes in core reactivity. They are required to be operating with Shutdown Margin Alarm Ratios set at less than or equal to 4 times the steady-state count rate, each with continuous indication in the control room.

The LCO is modified by a Note which allows the automatic actuation function of the BDMS to be blocked during core reloading until two fuel assemblies are loaded into the core. This provides an initial background count rate for setting the BDMS actuation setpoint and prevents unintentional actuations when the first two assemblies are loaded.

APPLICABILITY In MODE 6, the Boron Dilution Mitigation System must be OPERABLE to determine changes in core reactivity. In MODES 2, 3, 4, and 5, this same installed BDMS and associated circuitry is also required to be OPERABLE by LCO 3.3.9, Boron Dilution Mitigation System (BDMS)N.

ACTIONS A.1.1. A.1.2, A.1.3. A.1.4, A.2.1. and A.2.2 With only one or no Boron Dilution Mitigation System trains available, the system is considered inoperable and CORE ALTERATIONS and introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is Catawba Units 1 and 2 B 3.9.2-2 Revision No. 1

Nuclear Instrumentation B 3.9.2 BASES ACTIONS (continued)

Required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. In addition, valve NV-230 must be closed and secured within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to isolate the unborated water source and RCS boron concentration must be verified once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Performance of Required Actions A.1.1 and A.1.2 shall not preclude completion of movement of a component to a safe position.

An option to isolating the unborated water source is provided to allow alternate methods of monitoring core reactivity conditions and controlling boron dilution incidents. This includes the utilization of the two Source Range Neutron Flux Monitors. These monitors must be verified to operate with alarm setpoints less than or equal to one-half decade (square root of 10) above the steady-state count rate, each with continuous visual indication in the control room. In addition, the combined flowrate from both Reactor Makeup Water Pumps must be verified to be within the limits specified in the COLR in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Once these options are verified, CORE ALTERATIONS and positive reactivity changes can continue.

SURVEILLANCE SR 3.9.2.1 REQUIREMENTS SR 3.9.2.1 is the performance of a CHANNEL CHECK, which is a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that the two indication channels should be consistent with core conditions. Changes in fuel loading and core geometry can result in significant differences, but each train should be consistent with its local conditions.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with the CHANNEL CHECK Frequency specified similarly for the same instruments in LCO 3.3.9.

SR 3.9.2.2 SR 3.9.2.2 is the performance of the CHANNEL OPERATIONAL TEST for the Boron Dilution Mitigation System, which is the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify the OPERABILITY of required alarm, interlock, display, and trip functions. The COT also includes adjustments, as necessary, of the required alarm, interlock, and trip setpoints so that the setpoints are within the required range and accuracy.

Catawba Units 1 and 2 B 3.9.2-3 Revision No. 1

Nuclear Instrumentation B 3.9.2 BASES SURVEILLANCE REQUIREMENTS (continued)

This surveillance must be performed once per 31 days. The frequency is based on operating experience, which has shown to be adequate.

SR 3.9.2.3 SR 3.9.2.3 is performed on the Boron Dilution Mitigation System to verify the actuation signal actually causes the appropriate valves to move to their correct position and the Reactor Makeup Water Pumps to stop to mitigate a boron dilution accident.

The 18 month frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage. Operating experience has shown these components usually pass the Surveillance when performed at the 18 month Frequency.

SR 3.9.2.4 SR 3.9.2.4 is the performance of a CHANNEL CHECK, which is a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that the two indication channels should be consistent with core conditions. Changes in fuel loading and core geometry can result in significant differences, but each channel should be consistent with its local conditions.

A note is provided to clarify that the CHANNEL CHECK only needs to be performed on the Source Range Neutron Flux Monitors when used to satisfy Required Action A.2.1.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with the CHANNEL CHECK Frequency specified similarly for the same instruments in LCO 3.3.1.

SR 3.9.2.5 SR 3.9.2.5 is the performance of the CHANNEL OPERATIONAL TEST for the Source Range Neutron Flux Monitors, which is the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify the OPERABILITY of required alarm, interlock, display, and trip functions. The COT also includes adjustments, as necessary, of the required alarm, interlock, and trip setpoints so that the setpoints are within the required range and accuracy. These monitors must be verified to operate with alarm setpoints less than or equal to 0.5 decade above the steady state count rate. This SR is only required when the Source Range Neutron Flux Monitors are used to satisfy Required Catawba Units 1 and 2 B 3.9.2-4 Revision No. 1

Nuclear Instrumentation B 3.9.2 BASES SURVEILLANCE REQUIREMENTS (continued)

Action A.2.1. This surveillance must be performed prior to placing the monitors in service and once per 7 days thereafter. The 7 day Frequency is based on operating experience, which has been shown to be adequate.

SR 3.9.2.6 SR 3.9.2.6 verifies the combined flow rates from the both Reactor Makeup Water Pumps are < the value in the COLR. This surveillance is only required when implementing Required Action A.2.2. It ensures the assumptions in the analysis for the boron dilution event under these conditions are satisfied.

This surveillance must be performed once per 7 days and is based on engineering judgement and the unlikely event that a boron dilution will occur during this time.

REFERENCES

1.

UFSAR, Section 15.4.6

2.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.9.2-5 Revision No. 1

RHR and Coolant Circulation-High Water Level B 3.9.4 BASES LCO (continued)

a.

Removal of decay heat;

b.

Mixing of borated coolant to minimize the possibility of criticality; and

c.

Indication of reactor coolant temperature.

An OPERABLE RHR loop includes an RHR pump, a heat exchanger, valves, piping, instruments, and controls to ensure an OPERABLE flow path and to determine the low end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs. The operability of the operating RHR train and the supporting heat sink is dependent on the ability to maintain the desired RCS temperature. If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service.

The LCO is modified by a Note that allows the required operating RHR loop to be removed from service for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would dilute the RCS boron concentration with coolant at boron concentrations less than required to meet the minimum boron concentration of LCO 3.9.1. Boron concentration reduction with coolant at boron concentrations less than required to assure the minimum required RCS boron concentration is maintained is prohibited because uniform concentration distribution cannot be ensured without forced circulation. This permits operations such as core mapping or alterations in the vicinity of the reactor vessel hot leg nozzles and RCS to RHR isolation valve testing. During this 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, decay heat is removed by natural convection to the large mass of water in the refueling cavity.

APPLICABILITY One RHR loop must be OPERABLE and in operation in MODE 6, with the water level 2 23 ft above the top of the reactor vessel flange, to provide decay heat removal. The 23 ft water level was selected because it corresponds to the 23 ft requirement established for fuel movement in LCO 3.9.6, Refueling Cavity Water Level.' Requirements for the RHR System in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS), and Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level

< 23 ft are located in LCO 3.9.5, Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."

Catawba Units 1 and 2 B 3.9.4-2 Revision No. 2

RHR and Coolant Circulation-High Water Level B 3.9.4 BASES ACTIONS RHR loop requirements are met by having one RHR loop OPERABLE and in operation, except as permitted in the Note to the LCO.

A.1 If RHR loop requirements are not met, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation.

Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

A.2 If RHR loop requirements are not met, actions shall be taken immediately to suspend loading of irradiated fuel assemblies in the core. With no forced circulation cooling, decay heat removal from the core occurs by natural convection to the heat sink provided by the water above the core.

A minimum refueling water level of 23 ft above the reactor vessel flange provides an adequate available heat sink. Suspending any operation that would increase decay heat load, such as loading a fuel assembly, is a prudent action under this condition.

A.3 If RHR loop requirements are not met, actions shall be initiated and continued in order to satisfy RHR loop requirements. With the unit in MODE 6 and the refueling water level 2 23 ft above the top of the reactor vessel flange, corrective actions shall be initiated immediately.

A.4 If RHR loop requirements are not met, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the RHR loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere. Closing containment penetrations that are open to the outside atmosphere ensures dose limits are not exceeded.

Catawba Units 1 and 2 B 3.9.4-3 Revision No. 1

RHR and Coolant Circulation-High Water Level B 3.9.4 BASES ACTIONS (continued)

The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on the low probability of the coolant boiling in that time.

SURVEILLANCE SR 3.9.4.1 REQUIREMENTS This Surveillance demonstrates that the RHR loop is in operation and circulating reactor coolant. The flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability and to prevent thermal and boron stratification in the core. The RCS temperature is determined to ensure the appropriate decay heat removal is maintained. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering the flow, temperature, pump control, and alarm indications available to the operator in the control room for monitoring the RHR System.

REFERENCES

1.

UFSAR, Section 5.5.7.

2.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.9.4-4 Revision No. 1

RHR and Coolant Circulation-Low Water Level B 3.9.5 BASES LCO (continued)

An OPERABLE RHR loop consists of an RHR pump, a heat exchanger, valves, piping, instruments and controls to ensure an OPERABLE flow path and to determine the low end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs. The operability of the operating RHR train and the supporting heat sink is dependent on the ability to maintain the desired RCS temperature. If not in its normal RHR alignment from the RCS hot leg and returning to the RCS cold legs, the required RHR loop is OPERABLE provided the system may be placed in service from the control room, or may be placed in service in a short period of time by actions outside the control room and there are no restraints to placing the equipment in service.

Both RHR pumps may be aligned to the Refueling Water Storage Tank to support filling the refueling cavity or for performance of required testing.

APPLICABILITY Two RHR loops are required to be OPERABLE, and one RHR loop must be in operation in MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, to provide decay heat removal. Requirements for the RHR System in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS), and Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level 2 23 ft are located in LCO 3.9.4, Residual Heat Removal (RHR) and Coolant Circulation-High Water Level.'

ACTIONS A.1 and A.2 If less than the required number of RHR loops are OPERABLE, action shall be immediately initiated and continued until the RHR loop is restored to OPERABLE status and to operation or until > 23 ft of water level is established above the reactor vessel flange. When the water level is 2 23 ft above the reactor vessel flange, the Applicability changes to that of LCO 3.9.4, and only one RHR loop is required to be OPERABLE and in operation. An immediate Completion Time is necessary for an operator to initiate corrective actions.

B.1 If no RHR loop is in operation, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation.

Introduction of coolant inventory must be from sources that have a boron Catawba Units 1 and 2 B 3.9.5-2 Revision No. 2

RHR and Coolant Circulation-Low Water Level B 3.9.5 BASES ACTIONS (continued) concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

B.2 If no RHR loop is in operation, actions shall be initiated immediately, and continued, to restore one RHR loop to operation. Since the unit is in Conditions A and B concurrently, the restoration of two OPERABLE RHR loops and one operating RHR loop should be accomplished expeditiously.

B.3 If no RHR loop is in operation, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the RHR loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere. Closing containment penetrations that are open to the outside atmosphere ensures that dose limits are not exceeded. The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is appropriate for the majority of time during refueling operations, based on time to coolant boiling, since water level is not routinely maintained at low levels.

SURVEILLANCE SR 3.9.5.1 REQUIREMENTS This Surveillance demonstrates that one RHR loop is in operation and circulating reactor coolant. The flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability, prevent vortexing in the suction of the RHR pumps, and to prevent thermal and boron stratification in the core. The RCS temperature is determined to ensure the appropriate decay heat removal is maintained. In addition, during operation of the RHR loop with the water level in the vicinity of the reactor vessel nozzles, the RHR pump suction requirements must be met.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering the flow, temperature, pump control, and alarm indications available to the operator for monitoring the RHR System in the control room.

Catawba Units 1 and 2 B 3.9.5-3 Revision No. 1

RHR and Coolant Circulation-Low Water Level B 3.9.5 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.9.5.2 Verification that the required pump is OPERABLE ensures that an additional RCS or RHR pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pump. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

REFERENCES

1.

UFSAR, Section 5.5.7.

2.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units I and 2 B 3.9.5-4 Revision No. 1