ML031990228

From kanterella
Jump to navigation Jump to search
Regarding Confirmation of Initial/Requalification Operator License Examination
ML031990228
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/16/2003
From: Lanksbury R
Region 3 Administrator
To: Skolds J
Exelon Generation Co
References
Download: ML031990228 (4)


Text

July 16, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS: BYRON STATION

Dear Mr. Skolds:

In a telephone conversation on June 19, 2003, between Mr. D. McNeil of my staff and Mr. R.

Meyer, Operations Training Instructor, it was confirmed that Byron Nuclear Station has not requested an initial license examination during the calendar year 2004. During the telephone conversation Mr. Meyer confirmed that the week of August 16, 2004, scheduled for the biennial requalification program inspection (IP 71111.11B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 See Attached Distribution

J. Skolds cc:

Site Vice President - Byron Byron Station Plant Manager Regulatory Assurance Manager - Byron Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission R. Kolo, Training Department

Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS: BYRON STATION

Dear Mr. Skolds:

In a telephone conversation on June 19, 2003, between Mr. D. McNeil of my staff and Mr. R.

Meyer, Operations Training Instructor, it was confirmed that Byron Nuclear Station has not requested an initial license examination during the calendar year 2004. During the telephone conversation Mr. Meyer confirmed that the week of August 16, 2004, scheduled for the biennial requalification program inspection (IP 71111.11B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either of the examinations.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 See Attached Distribution DOCUMENT NAME: G:\\DRS\\ML031990228.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd HPeterson RDLanksbury DATE 06/14/03 06/14/03 06/16/03 OFFICIAL RECORD COPY

J. Skolds cc:

Site Vice President - Byron Byron Station Plant Manager Regulatory Assurance Manager - Byron Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission R. Kolo, Training Department ADAMS Distribution:

AJM DCT DFT GFD RidsNrrDipmIipb GEG HBC RAS DRPIII DRSIII PLB1 JRK1 M. A. Bies, DRS