July 1, 2003

MEMORANDUM TO:

Neil Perry, Acting Chief

Projects Branch 7

Division of Reactor Projects

THRU:

James C. Linville, Chief

/RA/

Electrical Branch

Division of Reactor Safety

FROM:

Christopher G. Cahill, Electrical Branch

/RA/

Division of Reactor Safety

SUBJECT:

FEEDER FOR BEAVER VALLEY INSPECTION REPORT

50-334/03-003 and 50-412/03-003

During the week of June 16 - 20, 2003, two inspectors from the Division of Reactor Safety and

a contractor performed the biennial inspection of permanent plant modifications and the

evaluation of changes, tests and experiments. The inspection was performed in accordance

with inspection procedure 71111, Attachment 17 and Attachment 02.

The inspection was conducted by the following personnel:

Chris Cahill

Senior Reactor Inspector, Electrical Branch, Lead Inspector

Sammy McCarver

Reactor Inspector, Systems Branch

Ray Cooney

Contractor

Cover Letter Input

No input.

Summary of Findings Input

No findings of significance were identified.

Attached is the feeder for inspection report 50-334/03-003 & 50-412/03-003.

cc w/attachments:

W. Lanning, DRS

R. Crlenjak, DRS

D. Kern, DRP

P. Maccaglia, DRP

DRS File

Neil Perry

2

DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031890924.wpd

After declaring this document An Official Agency Record it will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RI/DRS

RI/DRS

NAME

CCahill

JLinville

DATE

06/27/03

06/27/03

OFFICIAL RECORD COPY

Report Details

1.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

1R02

Evaluations of Changes, Tests, or Experiments (IP 71111.02)

a.

Inspection Scope

The inspectors reviewed eight selected safety evaluations associated with initiating

event, mitigating, and barrier integrity cornerstones to verify that changes to the facility

or procedures as described in the UFSAR were reviewed and documented in

accordance with 10 CFR 50.59, and that the safety issues pertinent to the changes were

properly resolved or adequately addressed. These safety evaluations were selected

based on the safety significance of the changes and the risk to structures, systems and

components.

The inspectors also reviewed seventeen screen-out evaluations for changes, tests and

experiments for which the licensee determined that safety evaluations were not

required. This review was performed to verify that the licensees threshold for

performing safety evaluations was consistent with 10 CFR 50.59.

In addition, the inspectors reviewed the administrative procedure that was used to

control the screening, preparation, and issuance of the safety evaluations to ensure that

the procedure adequately covered the requirements of 10 CFR 50.59.

The listing of the safety evaluations and screen-out evaluations reviewed is provided in

Attachment 1.

a.

Findings

No findings of significance were identified.

1R05

Fire Protection (IP 7111.05)

1.

Post-fire Safe Shutdown Manual actions

a.

Inspection Scope

The inspectors reviewed evaluation 50.59-01-003, for BVPS Unit 2. The evaluation

reviewed an update to the Fire Protection Safe Shutdown Report to document spurious

signal analysis for ventilation system components. The inspectors utilized the guidance

provide in IP 71111.05, enclosure 2, to evaluate the acceptability of the new manual

actions. Factors, such as timing, access to the equipment, diagnostic instrumentation

and the availability of procedures, were considered in the inspectors review. The team

also reviewed condition report (CR) 02-00921 that identified problems with the

application of manual actions.

2

b.

Findings

The team identified an unresolved item concerning the acceptability of the licensees

use of manual actions to remotely operate equipment or defeat spurious actuations

necessary for achieving and maintaining hot shutdown. This is unresolved pending

completion of the licensees validation of fire protection time critical manual actions.

USFAR section 9.5A.1.2.1.2.8, states "If manual actions are required these actions must

be performed by onsite personnel within the necessary time interval without adversely

affecting safe shutdown."

The inspectors utilized IP 71111.05, enclosure 2, Inspection Criteria for Fire Protection

Manual Actions to evaluate the application of manual actions as described in USFAR

section 9.5A.1.2.1.2.8. The IP provides guidance for the assessment of manual actions

including diagnostic instrumentation, environmental considerations, staffing,

communications, special tools, training, accessibility, procedures, verification and

validation. In particular, the verification and validation guidance states Determine

whether the manual actions have been verified and validated by plant walkdowns using

current procedures. Ensure that the licensee has adequately evaluated the capability of

operators to perform the manual actions in the time available before the plant will be

placed in an unrecoverable condition.

The inspector reviewed CR 02-00921, which identified that the BVPS Unit 2, Fire

Protection Safe Shutdown Report and associated safe shutdown procedures did not

clearly identify critical actions which must be accomplished within prescribed time

frames. The inspectors concluded that an assessment of the manual actions could not

be completed until the licensee had analyzed and validated the critical fire protection

safe shutdown manual actions which must be accomplished within prescribed frames.

This issue has been entered into the licensees corrective action program as corrective

action (CA) 13, to CR 02-00921. This issue will remain unresolved pending the

licensees validation of fire protection time critical manual actions. (URI 50-412/03-003-

01)

1R17

Permanent Plant Modifications (IP 71111.17)

a.

Inspection Scope

The inspectors reviewed nine selected risk-significant plant modification packages to

verify that: (1) the design bases, licensing bases, and performance capability of risk

significant Structures, Systems or Components (SSC) had not been degraded through

modifications; and, (2) modifications performed during increased risk configurations did

not place the plant in an unsafe condition. The modification packages were selected

from among the design changes that were completed within the past two years.

The selected plant modifications were distributed among initiating event, mitigating, and

barrier integrity cornerstones. For these selected modifications, the inspectors reviewed

the design inputs, assumptions, and design calculations, such as instrument set-point,

instrument uncertainty, and electrical loading calculations, to determine design

3

adequacy. The inspectors also reviewed field change notices that were issued during

the installation to confirm that the problems associated with the installation were

adequately resolved. In addition, the inspectors also reviewed the post-modification

testing, functional testing, and instrument calibration records to determine readiness for

operations. Finally, the inspectors reviewed the affected procedures, drawings, design

basis documents, and UFSAR sections to verify that the affected documents were

appropriately updated.

The listing of the reviewed modifications is provided in Attachment 1.

b.

Findings

No findings of significance were identified.

4.

OTHER ACTIVITIES

4OA2 Identification and Resolution of Problems (IP 71152)

a.

Inspection Scope

The inspectors reviewed CRs associated with 10 CFR 50.59 issues and plant

modification issues to ensure that the licensee was identifying, evaluating, and

correcting problems associated with these areas and that the corrective actions for the

issues were appropriate. The inspectors also reviewed two self-assessments related to

10 CFR 50.59 and plant modification activities at Beaver Valley.

The listing of the condition reports and self assessments reviewed is provided in

Attachment 1.

b.

Findings

No findings of significance were identified.

4OA5 Meetings, including Exit

The inspectors presented the inspection results to Mr. L. W. Pearce, Site Vice

President, and other members of licensee management at the conclusion of the

inspection on June 20, 2003. The licensee acknowledged the inspection findings

presented.

4

SUPPLEMENTAL INFORMATION

Key Points of Contact

Licensee

G. Cacciani

50.59 Program Manager

C. Mancuso

Engineering Change Program Owner

M. Manolerar

Design Engineering

D. Mickinac

Regulatory Affairs

L. Pearce

Site Vice President

G. Ritz

Engineering Assessment Board Chairman

F. Oberlitner

Design Engineering

NRC

D. Kern, Senior Resident Inspector, Beaver Valley

a.

Items Opened, Closed, and Discussed

Opened

50-412/03-03-01

URI Validation and Verification of Manual Actions not Complete

(Section 1R05)

b.

List of Acronyms Used

ARV

automatic recirculation valves

BVPS

Beaver Valley Power Station

CFR

Code of Federal Regulations

CR

condition reports

ECP

engineering change package

EDG

emergency diesel generator

FENOC

First Energy Nuclear Operating Company

HHSI

high head safety injection

IP

inspection procedure

NCV

non-cited violations

PI&R

problem identification and resolution

RG

Regulatory Guide

SE

safety evaluation

SSC

structures, systems or components

SWS

service water system

TBD

to be determined

TS

Technical Specifications

UFSAR

Updated Final Safety Analysis Report

5

Attachment 1

Documents Reviewed

Modifications

ECP 02-0040 Determine Minimum Number of Tensioned Reactor Head Studs to Commence

Reactor Fill and Vent

ECP 02-0077 Removing Blocking Diodes from Rod Control Circuits

ECP 02-0183 Install Feedwater Isolation Valve to Support Power Up-rate

ECP 02-0063 Replacement of the No. 4 Vital Bus Inverter

ECP 02-0253 Replace 6 inch Service Water Piping with 4 inch Piping

ECP 02-0514 Modify Fire Damper

ECP 02-0731 Change the Fuses in the Control System Power Cabinet

TER 1355

Update Unit 2 Fire Protection Safe Shutdown Report to Document

Spurious Signal Analysis for Ventilation System

10 CFR 50.59 Safety Evaluations00-019

Installation of Mechanical Clamp on BVPS-2 Atmospheric Steam Dump

00-081

Revise UFSAR Section 8.4

00-113

Engineering Safety Feature Response Times01-003

Update Unit 2 Fire Protection Safe Shutdown Report to Document Spurious

Signal Analysis for Ventilation System

01-2854

Install Automatic Recirculation Control Valves (ARV) at Discharge of

HHSI/Charging Pump 2CHS*P21C

02-2417

Replace Service Water System 6 inch Supply and Return Headers to Control

Room Chillers.

03-0294

Unit 1 Feedwater Isolation Valve Installation

03-0655

Turbine Missile Analysis

10 CFR 50.59 Screening Evaluations

02-2590

Replacement of Service Water System 6 inch Supply and Return Headers to

Control Room Chillers

02-3127

Inverter No. 4 Replacement

02-3318

Replace Voltage Regulator

02-3521

Connection of Newly Installed Service Water Lines from the Control Room

02-3679

Install 3/4 inch Branch Line on 2-SWS-006-164-3 for ECP 02-0253

02-3946

Install 3/4 inch Branch Line on 2-SWS-006-163-3 for ECP 02-0253

03-1327

Transformer Tap Changes

03-1335

Vital Bus Inverter Voltmeter

03-1427

Battery Equalizing Charge

03-1436

EDG Monthly Test

03-1581

Main Generator Loss of Field Relay Setting Change

03-1605

Possible Circuit Anomoly EDG 1-2 During Sequence Test

03-1793

Return to Service 4KV Emergency Bus 1DF

03-1870

7300 Power Supply Change

6

03-2145

Safeguards Train A Miscelenaeous

03-2145

Oil Filter Pressure Switch GO Test

03-0294

Unit 1 Feedwater Isolation Valve Installation

Self-Assessments

Nuclear Quality Assessment: 10 CFR 50.59 Evaluations, dated February 28,2003

Engineering Assessment Board, Product No. ECP 02-0214

Corrective Action Reports

01-3399, 01-4509, 01-0758, 02-7268, 02-09517, 02-2996, 02-7927, 02-7928, 02-6733, 03-5404

Procedures

DE-DG-005, Engineering Assessment Board, Revision 0

1/2-ADM-1902, Fire Brigade, Revision 0

1/2-ADM-2007, Operational Acceptance of Engineering Change Packages, Revision 4

2OM-56B.3.B.3, Fire Prevention and Control, Pre-Fire Strategies, Revision 14

NOP-CC-2001, Design Verification, Revision 1

NOP-CC-2002, Design Input, Revision 1

NOP-LP-4003, Evaluation of Changes, Tests and Experiments, Revision 0

Miscellaneous

BVPS-2 Fire Safe Shutdown Report

Unit 2 Drill Report 2OM-56C, Post-Fire Alternate Shutdown from Outside of the Control Room

NUREG-1057, Supplement No. 5, Safety Evaluation Report Related to the Operation of Beaver

Valley Power Station Unit 2