ML030420166
| ML030420166 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/10/2003 |
| From: | Creed J Division of Reactor Safety III |
| To: | Kenneth Riemer NRC/RGN-III/DRP/RPB5 |
| References | |
| IR-03-002 | |
| Download: ML030420166 (3) | |
See also: IR 05000305/2003002
Text
February 10, 2003
MEMORANDUM TO:
Kenneth R. Riemer, Chief
Reactor Projects Branch 5
Division of Reactor Projects
FROM:
James R. Creed /RA by TMadeda Acting For/
Safeguards Program Manager
Division of Reactor Safety
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT
DRS INPUT TO INTEGRATED REPORT 50-305/03-02
Attached is the report input for Kewaunee Nuclear Power Plant, Unit 1, Integrated
Report 50-305/03-02. I have reviewed this input and have determined it is ready for distribution
to the licensee and dissemination to the public.
After your concurrence, please return this hard copy to me, and we will email the electronic
version to you.
Attachment:
Input to Inspection Report 50-305/03-02
CONTACT:
Terry J. Madeda, DRS
(630) 829-9860
DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030420166.wpd
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE
RIII
E RIII
N RIII
N
NAME
TMadeda:aa
JCreed
KRiemer
DATE
02/05/03
02/10/03
02/10/03
OFFICIAL RECORD COPY
1
Cover Letter
No input, no significant findings.
Input below, Green findings were identified.
Title Page
Inspector:
T. J. Madeda, Physical Security Inspector
SUMMARY OF FINDINGS
Inspectable Area: Physical Protection
A.
Inspector Identified Findings
No findings of significance were identified.
B.
Licensee Identified Findings
No findings of significance were identified.
REPORT DETAILS
3.
SAFEGUARDS
Cornerstone: Physical Protection
3PP4
Security Plan Changes (71130.04)
a.
Inspection Scope
The inspectors reviewed Revision 18 to the Kewaunee Nuclear Power Plant Security
Manual to verify that the changes did not decrease the effectiveness of the submitted
document. The referenced revision was submitted in accordance with 10 CFR 50.54(p)(2) requirements by licensee letter dated December 20, 2002.
b.
Findings
No findings of significance were identified.
2
40A5
OTHER ACTIVITIES
4OA6 Meetings
.2
Interim Exit Meetings
Interim Exit was conducted
Safeguards Inspection with Mr. M. Fencl on January 27, 2003
KEY POINTS OF CONTACT
Licensee
M. Fencl, Security Manager, Kewaunee/Point Beach
LIST OF DOCUMENTS REVIEWED
3PP4 Physical Protection - Security Plan Change
Kewaunee Nuclear Power Plant Security Manual; Revision 18, dated
December 20, 2002