Letter Sequence Meeting |
|---|
|
Results
Other: ML022280438, ML031070343, ML031070351, ML031070357, ML031070368, ML031070397, ML031070410, ML031070421, ML031070452, ML031070463, ML031070472, ML031080417, ML031130250, ML031130427, ML031140030, ML032160436, ML033320066, ML033430375
|
MONTHYEARML0301606982002-01-15015 January 2002 Docket Information in Support of Staffs Review of H. B. Robinson, Unit 2 License Renewal Application Project stage: Approval ML0222804382002-08-16016 August 2002 Notice of Intent to Prepare an Environmental Impact Statement & Conduct Scoping Process for License Renewal for H. B. Robinson Steam Electric Plant, Unit No. 2 Project stage: Other ML0222801252002-08-29029 August 2002 Notice of Public Meeting at Coker College to Discuss Environmental Scoping Process for Robinson, Unit 2, License Renewal Application Project stage: Meeting ML0227402602002-09-25025 September 2002 Meeting Handouts to Discuss the Environmental Scoping Process for the LRA for Robinson, Unit 2 Project stage: Meeting ML0301706392003-01-16016 January 2003 Summary of Teleconference with National Marine Fishery Service and South Carolina Department of Natural Resources in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0303006192003-01-24024 January 2003 Summary of Teleconference with Carolina Power & Light in Support of Staffs Review of H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0304301542003-02-11011 February 2003 Docket Information in Support of the Staffs Review of the H. B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0310804172003-02-28028 February 2003 Federal Fish & Wildlife Permit, Dated 02/28/2003 & Migratory Bird Depredation Permit Standard Conditions Project stage: Other ML0310703432003-03-0606 March 2003 /Data Cover Sheet Project stage: Other ML0310703512003-03-0606 March 2003 FW: Robinson Gross Generation 01 02 (Table) Project stage: Other ML0310703572003-03-11011 March 2003 F.W. Robinson Emailing: - Emailing: peedee2K1 Project stage: Other ML0310703682003-03-14014 March 2003 2003 Federal Bird Permit, Dated 2/28/03, E-mail Date: 3/14/03 (Cvr. Sheet) Project stage: Other ML0310703972003-03-19019 March 2003 Cost of Replacement of Yokes Project stage: Other ML0308701572003-03-19019 March 2003 Summary of Teleconference with Carolina Power and Light in Support of the Staffs Review of the H.B. Robinson, Unit 2 License Renewal Application Project stage: Meeting ML0310704102003-03-25025 March 2003 750 and 751 Cost Benefit Rev3.doc Dated 03/25/2003 (Data W/Table) (Robinson Nuclear Plant RHR Valves 750 and 751) Project stage: Other ML0310704212003-03-25025 March 2003 750 and 751 Cost Benefit Rev 3.doc (Cvr. Sheet) March 25, 2003 Project stage: Other ML0310704522003-03-26026 March 2003 Document 2 Dated 03/26/2003 Project stage: Other ML0310704632003-04-0303 April 2003 Radiant Energy Shield SAMA, Dated 4/3/03 Project stage: Other ML0310704722003-04-0808 April 2003 IPEEE Fire Analysis, Dated 04/08/2003 Project stage: Other ML0310702092003-04-15015 April 2003 Docket Information in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application Project stage: Approval ML0311304272003-04-22022 April 2003 (S. Bolden) - Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Other ML0311302502003-04-22022 April 2003 Biological Assessment for License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0311400302003-04-30030 April 2003 Biological Assessment - H.B. Robinson Steam Electric Plant, Unit 2, (Nuclear) License Renewal Review Hartsville, South Carolina, April 2003 Project stage: Other ML0312600842003-05-0505 May 2003 Notice of Availability of the Draft Plant-Specific Supplement to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Draft Other ML0312604322003-05-0505 May 2003 Request for Comments on the Draft Plant-Specific Supplement 13 to the Generic Environmental Impact Statement Regarding H.B. Robinson Steam Electric Plant, Unit 2 (Tac No. MB5226) Project stage: Draft Other ML0322706002003-06-25025 June 2003 Corrected Transcript of Proceedings, U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant, Draft EIS Public Meeting - Afternoon, Hartsville, Sc ML0321604362003-06-25025 June 2003 E-Mail from L. England to Jan Kozyra Dam Releases Project stage: Other ML0322706012003-06-25025 June 2003 Corrected Transcript of Proceedings: U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant Draft EIS Public Meeting - Evening Session, Hartsville, Sc, Enclosure 3 ML0322706042003-08-15015 August 2003 Summary of Visit to Robinson Site in Support of the Staffs Review of the H.B. Robinson, Unit 2, License Renewal Application (Tac No. MB5226) Project stage: Approval ML0322706032003-08-15015 August 2003 Summary of Meeting Held in Support of the Environmental Review for the H.B. Robinson Steam Electric Plant, Unit 2, License Renewal Application (TAC No. Mb 5226) W/Encls. 1 & 4 Project stage: Meeting ML0333200662003-10-17017 October 2003 Comment (8) of Joseph F. Cockrell, U.S. Department of the Interior Regarding License Renewal at H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Other ML0334303752003-12-12012 December 2003 Final Supplement 13 to the Generic Environmental Impact Statement for H.B. Robinson Steam Electric Plant, Unit 2 License Renewal Project stage: Other ML0334505172003-12-31031 December 2003 NUREG-1437 S13, Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Project stage: Acceptance Review 2003-03-14
[Table View] |
Text
January 16, 2002 NOTE TO:
FILE FROM:
Richard L. Emch, Jr., Senior Project Manager /RA/
Environmental Section License Renewal & Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF TELECONFERENCE WITH NATIONAL MARINE FISHERY SERVICE AND SOUTH CAROLINA DEPARTMENT OF NATURAL RESOURCES IN SUPPORT OF THE STAFFS REVIEW OF THE H. B.
ROBINSON, UNIT 2 LICENSE RENEWAL APPLICATION (TAC NO. MB5226)
On Monday, January 13, 2003, the NRC conducted a teleconference with representatives of the National Marine Fishery Service (NMFS) and the South Carolina Department of Natural Resources (SCDNR). The following people participated in the teleconference:
Richard Emch, NRC Stacey Fox, NRC Jennifer Davis. NRC Dr. Sam Loftin, LANL Duane Neitzel, PNNL Dr. Stephania Bolden, NMFS Mark Collins, SCDNR The Federally-listed endangered and threatened species were discussed for the South Carolina Counties surrounding H. B. Robinson Steam Electric Plant, Unit 2 (Robinson) - Chesterfield, Darlington, Florence, Lee, and Sumter Counties. Species of concern for these Counties were also discussed in much less detail. The endangered shortnose sturgeon is known to inhabit the Pee Dee River, but it is not known whether this species inhabits Black Creek or how far up Black Creek. Dr. Bolden agreed to send copies of the 1998 Shortnose Sturgeon Recovery Plan and the 2000 Protocol to the NRC. Dr. Bolden and Mr. Collins asked several questions regarding the shortnose sturgeon.
- 1. What is the potential for the sturgeon to access Lake Robinson? Are there fish passage facilities that would allow the sturgeon to gain access upstream to Lake Robinson? Are there other dams on Black Creek between Lake Robinson and the Pee Dee River?
There are no fish passage facilities for the dam on Lake Robinson. No one participating in the teleconference knew if there are dams lower on Black Creek that block the sturgeon from inhabiting Black Creek below Lake Robinson. Mr. Emch committed that NRC will investigate the existence of downstream dams on Black Creek.
- 2. What are the potential temperature impacts on sturgeon from thermal releases at Robinson?
Mr. Emch indicated that the water discharged from Robinson into Lake Robinson is regulated by the National Pollutant Discharge Elimination System permit issued by the
State of South Carolina. This permit limits the temperature of the discharge water and the amount of contaminants that can be released.
- 3. What are the potential impacts on sturgeon from contaminants released from Robinson?
Same answer as question No. 2.
- 4. What are the possible impacts on sturgeon resulting from the flow patterns at the discharge from Robinson?
Mr. Neitzel indicated that surging is not an issue for Lake Robinson because Robinson is not a hydro-powered plant and the lake is not used for pumped storage.
Dr. Loftin noted that the Atlantic sturgeon is also listed by NMFS as a candidate species and should be included in the biological assessment.
Mr. Collins asked if there has been an aerial survey of the plant site and the transmission corridors for bald eagles nests. Dr. Loftin indicated that surveys for bald eagle nests have been conducted, but not aerial surveys. Mr. Collins also indicated that there have been a number of bald eagle deaths that are believed to be linked to hydrilla infestations in lakes in the Southeast.
It is believed that toxic algae grow on the hydrilla, and bald eagles feed on coots (a small waterfowl) that ingest the hydrilla with the toxic algae. Mr. Emch committed that NRC will investigate the possibility of hydrilla infestation in Lake Robinson.
Mr. Collins also asked about surveys and critical habitat for the three endangered plant species
- rough-leaved lossestrife, chaffseed, and Canbys dropwort. Dr. Loftin indicated that CP&Ls Environmental Report states that there are no critical habitats for any of the endangered and threatened species on the Robinson site or the transmission line corridors.
No issues were identified for the other endangered and threatened species. One species of concern, the broadtail madtom (a small catfish), was discussed. Mr. Collins indicated that Freshwater Fishes of the Carolinas by Fred Rahde states that this fish is un-described. Mr.
Collins was not aware of any other information about this species.
Accession no.: ML030170639